污水停留时间对多级人工湿地塘组合系统除氮的影响 被引量:2
1
作者 王全金 万博阳 戚晓波 《科学技术与工程》 北大核心 2016年第5期245-249,共5页
通过多级人工湿地-塘组合系统在不同的污水停留时间下处理污染水体,对各项出水污染物进行测试对比。结果表明:在初春低温条件下,COD、TN和NH_4^+-N的去除率随着污水停留时间的增加显著提高,其中COD在污水停留时间达到5 d之后去除率开始... 通过多级人工湿地-塘组合系统在不同的污水停留时间下处理污染水体,对各项出水污染物进行测试对比。结果表明:在初春低温条件下,COD、TN和NH_4^+-N的去除率随着污水停留时间的增加显著提高,其中COD在污水停留时间达到5 d之后去除率开始趋于平缓,TN和NH_4^+-N的去除率在污水停留时间达到5 d之后出现下降。表明在保证处理效果的前提下,污水停留时间选在4~5 d之间较为合理。这为实际处理污染水体提供了一定的参考。 展开更多
关键词 多级人工湿地 污水停留时间 除氮
下载PDF
Study on Purification Efficiency of Vertical Flow Wetlands on Domestic Wastewater 被引量:7
2
作者 仝昭昭 王延华 顾中铸 《Agricultural Science & Technology》 CAS 2011年第3期461-465,共5页
The combination method of intermittent influent and vertical flow wetlands (VFW) was used in the test to treat the domestic wastewater. Four artificial wetlands including Typha latifolia wetland,Phragmites australis... The combination method of intermittent influent and vertical flow wetlands (VFW) was used in the test to treat the domestic wastewater. Four artificial wetlands including Typha latifolia wetland,Phragmites australis (P.H.) wetland,polyculture wetlands (Typha latifolia and Phragmites australis) and non-vegetation wetland were established in the test. The effects of hydraulic retention time (HRT) and plant species on pollutants removal efficiencies were studied. The results showed that when HRT=7,the treatment efficiencies of wetlands with plants for the removal of TN and NH+4-N were up to 99.65% and 99.58%,respectively. For the control wetland,TN removal efficiency was up to 87.9% when HRT were 6 days,and NH+4-N removal efficiency was up to 91.8% when HRT were 5 days. TP removal efficiencies of four wetlands were higher than 93% when HRT was 6 days. Through the studies on different plants,it was found that vegetation wetlands had better nitrogen removal efficiency than non-vegetation wetland. The treatment efficacy of Phragmites australis wetland and polyculture wetland was better than Typha latifolia wetland. 展开更多
关键词 Vertical flow wetlands Domestic wastewater Removal of nitrogen and phosphorus Hydraulic retention time
下载PDF
Effectiveness of a Subsurface Constructed Wetland on the Treatment of Saline Wastewater 被引量:7
3
作者 Yushan Zhang Jing Wang Jinquan Qiu 《Journal of Environmental Science and Engineering》 2010年第1期9-13,共5页
This study evaluated the capability of a constructed wetland for treating saline wastewater. A pilot-scale constructed wetland system was set up and was initially operated at low, then increasing salt levels to determ... This study evaluated the capability of a constructed wetland for treating saline wastewater. A pilot-scale constructed wetland system was set up and was initially operated at low, then increasing salt levels to determine the effect of salinity on the contaminants' removal performance. The effect of hydraulic retention time (HRT) variation on treatment efficiency of the reed wetland was also discussed. Average removal efficiencies of the reed (Phragmites australis) wetland were found to be 79.0% for COD, 72.2% for ammonia nitrogen (NH3-N) and 82.8% for total phosphorus (TP). Reed planting had obvious improvement on COD and NH3-N removal efficiency when compared to an unplanted system. With the seawater proportion in the influent increasing from 20% to 30%, the TP removal efficiency improved obviously. COD removal efficiency of the reed wetland was positively correlated with HRT under high salinity condition, while excess HRT had adverse impacts on the NH3-N and TP removal. Optimal HRT for NH3-N and TP removal was 4 days. Results obtained can be beneficially used to improve the use of constructed wetlands in saline wastewater treatment. 展开更多
关键词 Constructed wetland saline wastewater hydraulic retention time reed.
下载PDF
Effect of Solid Retention and Hydraulic Retention Times on Membrane Fouling in Membrane Bioreactor 被引量:1
4
作者 D. Luintel Z.L. Xu 《Journal of Environmental Science and Engineering》 2010年第8期1-6,共6页
In this bench scale submerged membrane bioreactor, effect of solid retention time and hydraulic retention time on membrane fouling propensity has been studied. This experiment is carried out at different solid retenti... In this bench scale submerged membrane bioreactor, effect of solid retention time and hydraulic retention time on membrane fouling propensity has been studied. This experiment is carried out at different solid retention time of 5, 10, 30, 70 and 98 days; and fouling behavior of membrane bioreactor is investigated. Average effluent quality is found to be 88.14%-94.38%. The experiment with different hydraulic retention is carried for 3 to 4 days and fouling behavior has been investigated. The effluent quality at different hydraulic retention time of 1, 2, 3, 5, 10 and 24 hours has been investigated. This paper aims to search optimal values of solid and hydraulic retention times at which lower fouling and higher organic removal efficiency can be obtained. This study has been mainly focused on operating parameters rather than microbial structure, effect and analysis of activated sludge to membrane fouling. 展开更多
关键词 Membrane bioreactor membrane fouling solid retention time hydraulic retention time. wastewater treatment.
下载PDF
COD与硫酸盐低比值对城市废水处理的影响
5
作者 刘霞 《科技与企业》 2013年第16期348-348,共1页
本文研究了厌氧UASB工艺对低浓度城市污水的处理效果,COD与硫酸盐低比值对厌氧反应器的影响。研究表明:对于低浓度(COD小于200mg/L,BOD5小于100)、低COD与硫酸盐比值小于1的进水,厌氧UASB反应器处理效率可达到60%~70%或更高。
关键词 厌氧污泥床城市污水反应负荷水力停留时间
下载PDF