ECOSUNIDE is a new activated sludge process based on the sludge concentration optimization theory.With it,we carried out a high sludge concentration by changing influent mode and distributing carbon source in a reason...ECOSUNIDE is a new activated sludge process based on the sludge concentration optimization theory.With it,we carried out a high sludge concentration by changing influent mode and distributing carbon source in a reasonable way,which can improve the ecological superiority of nitrification and denitrification for the growth of phosphorous accumulating organisms(PAOs)and nitrifiers and raised the nutrient removal efficiency of municipal sewage treatment plants.In 2007,we adopted this technique in Linyi Sewage Treatment Plant in Shandong Province,China.After the reconstruction,we achieved the high efficiency of nutrient removal with low investment under the dynamic load of the secondary sewage treatment plant.The effluent water qualities meet the classⅠ-A criteria specified in Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant(GB 18918-2002)and the rest effluent indexes meet the classⅠ-B criteria.Besides,we have above 20% operating cost cut by stopping the internal reflux without power charge increased and any new pool structures built.展开更多
基金the Fund on Science and Technology of China University of Mining and Technology,China(No.0P080307)Key Extension Programon Scientific and Technological Achievements of China(No.2004EC000132)
文摘ECOSUNIDE is a new activated sludge process based on the sludge concentration optimization theory.With it,we carried out a high sludge concentration by changing influent mode and distributing carbon source in a reasonable way,which can improve the ecological superiority of nitrification and denitrification for the growth of phosphorous accumulating organisms(PAOs)and nitrifiers and raised the nutrient removal efficiency of municipal sewage treatment plants.In 2007,we adopted this technique in Linyi Sewage Treatment Plant in Shandong Province,China.After the reconstruction,we achieved the high efficiency of nutrient removal with low investment under the dynamic load of the secondary sewage treatment plant.The effluent water qualities meet the classⅠ-A criteria specified in Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant(GB 18918-2002)and the rest effluent indexes meet the classⅠ-B criteria.Besides,we have above 20% operating cost cut by stopping the internal reflux without power charge increased and any new pool structures built.