The first phase of Fenhe River Park(6kilometersbeginningat155metersupstreamfromthe VictoryBridge and endingat125meters downstream beyondthe SouthernRingBridge)was built between October1998and September2000.Withan inve...The first phase of Fenhe River Park(6kilometersbeginningat155metersupstreamfromthe VictoryBridge and endingat125meters downstream beyondthe SouthernRingBridge)was built between October1998and September2000.Withan investmentof560millionyuan,the Fenhe RiverPark is concurrentlya water-retainingproject to beautifythe Fenhe Riversectionthat flowsthroughthe cityproper.A concrete wall builtinto the excavated riverbed dividesthe riverintotwo channels:on the east side is the220-meter-wide channel of clear water with4rubber dams to store the water at three levels while on the west the80-meter-wide channel for muddy water to drain the upstream floodwateror channel water for irrigation.Additionallythe Fenhe River Park is the largest and most concentrated green belt for public recreation.展开更多
文摘The first phase of Fenhe River Park(6kilometersbeginningat155metersupstreamfromthe VictoryBridge and endingat125meters downstream beyondthe SouthernRingBridge)was built between October1998and September2000.Withan investmentof560millionyuan,the Fenhe RiverPark is concurrentlya water-retainingproject to beautifythe Fenhe Riversectionthat flowsthroughthe cityproper.A concrete wall builtinto the excavated riverbed dividesthe riverintotwo channels:on the east side is the220-meter-wide channel of clear water with4rubber dams to store the water at three levels while on the west the80-meter-wide channel for muddy water to drain the upstream floodwateror channel water for irrigation.Additionallythe Fenhe River Park is the largest and most concentrated green belt for public recreation.