Cyclic metallurgical process for separation and recovery of Cr from vanadium precipitated solution by precipitation with PbCO_(3)and leaching with Na_(2)CO_(3)was investigated.The concentration of Cr residue in the so...Cyclic metallurgical process for separation and recovery of Cr from vanadium precipitated solution by precipitation with PbCO_(3)and leaching with Na_(2)CO_(3)was investigated.The concentration of Cr residue in the solution decreases from 2.360 to 0.001 g/L by adding PbCO_(3)into vanadium precipitated solution according to Pb/Cr molar ratio of 2.5,adjusting the pH to 3.0 and stirring for 180 min at 30℃.Then,the precipitates were leached with hot Na_(2)CO_(3)solution to obtain leaching solution containing Na_(2)CrO_(4)and leaching residue containing PbCO_(3).The leaching efficiency of Cr reaches 96.43%by adding the precipitates into 0.5 mol/L Na_(2)CO_(3)solution with the mass ratio of liquid to solid(L/S)of 10:1 mL/g and stirring for 60 min under pH 9.5 at 70℃.After filtration,leaching residue is reused in Cr precipitation and leaching solution is used to circularly leach the Cr precipitates until Na_(2)CrO_(4)approaches the saturation.Finally,the product of Na_(2)CrO_(4)·4H_(2)O is obtained by evaporation and crystallization of leaching solution.展开更多
基金The authors are grateful for the financial supports from the National Natural Science Foundation of China(No.51974369)NSFC-STINT(No.52111530192)+1 种基金Postgraduate Research Innovation Project of Central South University,China(No.2019zzts244)the Open Sharing Fund for the Large-scale Instruments and Equipments of Central South University,China(No.CSUZC202029).
文摘Cyclic metallurgical process for separation and recovery of Cr from vanadium precipitated solution by precipitation with PbCO_(3)and leaching with Na_(2)CO_(3)was investigated.The concentration of Cr residue in the solution decreases from 2.360 to 0.001 g/L by adding PbCO_(3)into vanadium precipitated solution according to Pb/Cr molar ratio of 2.5,adjusting the pH to 3.0 and stirring for 180 min at 30℃.Then,the precipitates were leached with hot Na_(2)CO_(3)solution to obtain leaching solution containing Na_(2)CrO_(4)and leaching residue containing PbCO_(3).The leaching efficiency of Cr reaches 96.43%by adding the precipitates into 0.5 mol/L Na_(2)CO_(3)solution with the mass ratio of liquid to solid(L/S)of 10:1 mL/g and stirring for 60 min under pH 9.5 at 70℃.After filtration,leaching residue is reused in Cr precipitation and leaching solution is used to circularly leach the Cr precipitates until Na_(2)CrO_(4)approaches the saturation.Finally,the product of Na_(2)CrO_(4)·4H_(2)O is obtained by evaporation and crystallization of leaching solution.