Through the shear tests on composite specimens using four different kinds of tack coat material (epoxy resin, SBS modified emulsified asphalt, SBS modified asphalt and H# bridge waterproof material), the bond condit...Through the shear tests on composite specimens using four different kinds of tack coat material (epoxy resin, SBS modified emulsified asphalt, SBS modified asphalt and H# bridge waterproof material), the bond condition between layers of porous asphalt pavement under traffic load, temperature variation and moisture situation is evaluated. The test results show that the bond strength decreases with the rise in temperature, and the relationship between shear strength and temperature can be expressed by a logarithm curve at a high reliability. Under the action of traffic load, the value of shear strength of the mixture right under the centre of the wheel track is smaller than that of other parts of the pavement. It is also found that some effects concerning moisture have comparative effects on the bonding of the two layers. Given all the results achieved during the study, it will be quite rewarding to make rational comparisons during selecting the sound type of tack coat.展开更多
The mix design method of asphalt rubber open-graded friction course (AR-OGFC) by the Marshall test and key technologies of AR-OGFC overlay are studied. Based on the draindown test, the stripping test and the Marshal...The mix design method of asphalt rubber open-graded friction course (AR-OGFC) by the Marshall test and key technologies of AR-OGFC overlay are studied. Based on the draindown test, the stripping test and the Marshall test by different beating times, the asphalt content estimating method and Marshall beat criterion are studied. It is found that the asphalt content of AR-OGFC can be estimated by the formula of Arizona, and the proper Marshall test criterion for AR-OGFC is 50 beats on both sides. By analyzing the influence of gradation on OGFC performance, the gradation of AR-OGFC is recommended, and the amount of aggregate passing 4. 75 mm should be minimized for AR-OGFC. Through investigation of AR-OGFC overlay projects, key technologies such as the treatment of underlying pavement and the selection of tack coat are advanced, and modified emulsified asphalt should be used in AR-OGFC overlay tack coat.展开更多
文摘Through the shear tests on composite specimens using four different kinds of tack coat material (epoxy resin, SBS modified emulsified asphalt, SBS modified asphalt and H# bridge waterproof material), the bond condition between layers of porous asphalt pavement under traffic load, temperature variation and moisture situation is evaluated. The test results show that the bond strength decreases with the rise in temperature, and the relationship between shear strength and temperature can be expressed by a logarithm curve at a high reliability. Under the action of traffic load, the value of shear strength of the mixture right under the centre of the wheel track is smaller than that of other parts of the pavement. It is also found that some effects concerning moisture have comparative effects on the bonding of the two layers. Given all the results achieved during the study, it will be quite rewarding to make rational comparisons during selecting the sound type of tack coat.
文摘The mix design method of asphalt rubber open-graded friction course (AR-OGFC) by the Marshall test and key technologies of AR-OGFC overlay are studied. Based on the draindown test, the stripping test and the Marshall test by different beating times, the asphalt content estimating method and Marshall beat criterion are studied. It is found that the asphalt content of AR-OGFC can be estimated by the formula of Arizona, and the proper Marshall test criterion for AR-OGFC is 50 beats on both sides. By analyzing the influence of gradation on OGFC performance, the gradation of AR-OGFC is recommended, and the amount of aggregate passing 4. 75 mm should be minimized for AR-OGFC. Through investigation of AR-OGFC overlay projects, key technologies such as the treatment of underlying pavement and the selection of tack coat are advanced, and modified emulsified asphalt should be used in AR-OGFC overlay tack coat.