The research selected three typical areas for plant investigation, including upper reaches of Gangnan Reservoir, the area between Gangnan and downstream of Huangbizhuang Reservoir, and Huangbizhuang Reservoir. The res...The research selected three typical areas for plant investigation, including upper reaches of Gangnan Reservoir, the area between Gangnan and downstream of Huangbizhuang Reservoir, and Huangbizhuang Reservoir. The results showed that affected by water, plant species, species diversity and species richness were all decreasing in varying degrees as the distance with watercourse upper reaches was increasing, but the ratio of Anthropochory plants was growing. The research finally proposed countermeasures, including increasing wetland area, constructing forests and artificial water landscape of Hutuo River and reinforcing watercourse compre- hensive management.展开更多
According to the measured data after impoundment and operation of the Three Gorges Reservoir,the reservoir sediment deposition and downstream river channel scouring are described briefly and compared with the research...According to the measured data after impoundment and operation of the Three Gorges Reservoir,the reservoir sediment deposition and downstream river channel scouring are described briefly and compared with the research results achieved in the demonstration stage.It is indicated through analysis that the reservoir sediment deposition and downstream river channel scouring during 8-year impoundment and operation are still within the original forecast,so the original forecasting results are feasible.The further observation and comparison should be conducted because the comparison between the observed data and the original forecast is not so sufficient in time and the prototype observation and related research work should be strengthened in the future.展开更多
The actual situation of the Tisza Valley traditionally used for land farming is basically determined by the consequences of the river regulation of the nineteenth century which aimed at the extension of the intensive ...The actual situation of the Tisza Valley traditionally used for land farming is basically determined by the consequences of the river regulation of the nineteenth century which aimed at the extension of the intensive agriculture, by the extreme water regime of alternating periods of flood showing a deteriorating trend and drought related to the climatic change; and by several environmental problems induced mainly by the land use. The objective of the article is to prove the regional advantages of a proposed technical solution to mitigate the flood risk with a special regard to the land cover. Hydrodynamic modeling results prove that the best technical solution is given by a combination of different strategies containing the inundation of deep floodplains-areas regularly covered by water before the river regulation works and, globally, by an important mitigation of flood damages, the costs of solution would be surely covered in the longterm. By means of its natural-resembling operation, the regular water cover would allow a multiple use of water, contributing to the solution of the simultaneously existing aridity problem, and, the development of the floodplain landscape management would help improve the ecological and the economical upgrading of the region.展开更多
In order to understand the effect of river impoundment on carbon dynamics, a large reservoir in a subtropical area, the Xinanjiang Reservoir, was investigated in detail. CO_2 emissions from the water–air interface wa...In order to understand the effect of river impoundment on carbon dynamics, a large reservoir in a subtropical area, the Xinanjiang Reservoir, was investigated in detail. CO_2 emissions from the water–air interface was studied, as was organic carbon burial in sediment. The results show a significant seasonal difference in CO_2 emissions. River impoundment led to the enhancement of aquatic photosynthesis, generating large amounts of authigenic organic carbon that was then buried in sediment.展开更多
The water and sediment discharge regulation (WSDR) project, which has been performed since 2002 before flood season every year, is of great significance to the river management in China. Until 2007, six experiments ...The water and sediment discharge regulation (WSDR) project, which has been performed since 2002 before flood season every year, is of great significance to the river management in China. Until 2007, six experiments have been fulfilled to evaluate the effect of the project on the natural environment. To fill the gap of investigations, a study on flood and suspended sediment transportation and channel changing along the distributary channel of the Huanghe (Yellow) River was conducted during the WSDR project period in 2007. The lower channel was scoured rapidly and the channel became unobstructed gradually several days after the flood peak water was discharged from the Xiaolangdi Reservoir. Within four days after the flood peak at 3 000 m3/s entered the distributary, the channel in the river mouth area was eroded quickly. Both the mean values of area and depth of the main channel were tripled, and the maximum flood carrying capacity increased to 5 500 m3/s or more. Then, the river channel was silted anew in a very short time after completion of the WSDR. Favored by the WSDR project, the fiver status in April 2008 became better than that of the year before. The adjustment ranges of main channel parameters were about 30%, 10%, and 10% at sections C2, Q4, and Q7, respectively. The process of rapid erosion-deposition was more active 15 km away in the channel from the fiver mouth due to the marine influence. It is reasonable for discharging sediment at concentration peak from Xiaolangdi Reservoir at the end of the flood peak. As a result, the sediment peak reached the river mouth about two days later than that of the water current. In addition, the WSDR project has improved the development of the estuarine wetland. Wetland vegetation planted along the river banks restrained the water flow as a strainer and improved the main channel stability. It is suggested to draw water at mean rate of 150 m3/s from the Huanghe River during flood periods, because at the rate the water in the wetland would be stored and replenished in balance. Moreover, we believe that cropland on the river shoal of the lower Huanghe River should be replaced by wetland. These activities should achieve the Huanghe River management strategy of "To concentrate flow to scour sediment, stabilize the main channel, and regulate water and sediment".展开更多
The occurrence and transmission attenuation of surge is always a problem that researchers pay much attention to. The influence of the first wave height of landslide surge and the following transmission attenuation of ...The occurrence and transmission attenuation of surge is always a problem that researchers pay much attention to. The influence of the first wave height of landslide surge and the following transmission attenuation of surge are involved with many factors, which are mainly: landslide water entry angle, river course depth, river course geometrical properties and landslide mass and material, etc.. This thesis is mainly a research on the properties and transmission attenuation rules of landslide surge which is caused by linear narrow river course. Numerical value simulation will be applied in this thesis to discuss about the features and rules of the occurrence and transmission of surge in different landslide water entry angles and under different influences.展开更多
The current environmental flow assessment of Chinese rivers is thought to have three shortcomings: The first is that environmental flow requirements of reservoirs in dammed rivers are usually not explicitly considered...The current environmental flow assessment of Chinese rivers is thought to have three shortcomings: The first is that environmental flow requirements of reservoirs in dammed rivers are usually not explicitly considered; the second is that enough attentions have not been paid to the inherent links between flow regime and ecological processes; the third is that most studies focus on the variable range of merely one hydrological element such as discharge needed by riverine ecosystems. Here, first proposed is a holistic method for environmental flow assessment, the flow-ecological response relationship method that is suitable for large rivers with relatively abundant ecological data. Based on the conceptual models and quantitative relationships between flow and ecological response, this method comprehensively considers the ecological conservation requirements of both reservoir and its downstream reach. Then, it is applied to assessing the environmental flows of the Three Gorges Reservoir and its downstream reach by the following steps: 1) Construction of conceptual models of flow-ecological response; 2) identification of ecological targets of environmental flows and their key periods; 3) development of the quantitative relationships between hydrological indicators and ecological indictors; 4) preliminary assessment of environmental flow according to the tradeoff between ecological targets and water demands of human. The environmental flow hydrographs obtained have explicit ecological conservation targets, time schedule of achieving each target, and characteristics of multiple hydrological elements such as flow, water level, frequency, timing, duration and rate of change. The case study has tested the reasonability and feasibility of this method, and the results of this study are expected to provide technical support and decision reference for improving the operation of the Three Gorges-Gezhouba cascade reservoirs.展开更多
基金Supported by Hebei Provincial Natural Science Foundation(D2012302007)Science and Technology Project of Hebei Academy of Sciences(14111)~~
文摘The research selected three typical areas for plant investigation, including upper reaches of Gangnan Reservoir, the area between Gangnan and downstream of Huangbizhuang Reservoir, and Huangbizhuang Reservoir. The results showed that affected by water, plant species, species diversity and species richness were all decreasing in varying degrees as the distance with watercourse upper reaches was increasing, but the ratio of Anthropochory plants was growing. The research finally proposed countermeasures, including increasing wetland area, constructing forests and artificial water landscape of Hutuo River and reinforcing watercourse compre- hensive management.
基金support from the Technology Pillar Program during the"Eleventh Five-year Plan"Period (No.2006BAB05B02No.2006BAB05B03) are acknowledged
文摘According to the measured data after impoundment and operation of the Three Gorges Reservoir,the reservoir sediment deposition and downstream river channel scouring are described briefly and compared with the research results achieved in the demonstration stage.It is indicated through analysis that the reservoir sediment deposition and downstream river channel scouring during 8-year impoundment and operation are still within the original forecast,so the original forecasting results are feasible.The further observation and comparison should be conducted because the comparison between the observed data and the original forecast is not so sufficient in time and the prototype observation and related research work should be strengthened in the future.
文摘The actual situation of the Tisza Valley traditionally used for land farming is basically determined by the consequences of the river regulation of the nineteenth century which aimed at the extension of the intensive agriculture, by the extreme water regime of alternating periods of flood showing a deteriorating trend and drought related to the climatic change; and by several environmental problems induced mainly by the land use. The objective of the article is to prove the regional advantages of a proposed technical solution to mitigate the flood risk with a special regard to the land cover. Hydrodynamic modeling results prove that the best technical solution is given by a combination of different strategies containing the inundation of deep floodplains-areas regularly covered by water before the river regulation works and, globally, by an important mitigation of flood damages, the costs of solution would be surely covered in the longterm. By means of its natural-resembling operation, the regular water cover would allow a multiple use of water, contributing to the solution of the simultaneously existing aridity problem, and, the development of the floodplain landscape management would help improve the ecological and the economical upgrading of the region.
基金funded by the National Natural Science Foundation of China(No.41573064)the National Key Research and Development Program of China(No.2016YFA0601003)
文摘In order to understand the effect of river impoundment on carbon dynamics, a large reservoir in a subtropical area, the Xinanjiang Reservoir, was investigated in detail. CO_2 emissions from the water–air interface was studied, as was organic carbon burial in sediment. The results show a significant seasonal difference in CO_2 emissions. River impoundment led to the enhancement of aquatic photosynthesis, generating large amounts of authigenic organic carbon that was then buried in sediment.
基金Supported by National Key Basic Research Program of China (No. 2005CB422304)National Natural Science Foundation of China (No.40872167)
文摘The water and sediment discharge regulation (WSDR) project, which has been performed since 2002 before flood season every year, is of great significance to the river management in China. Until 2007, six experiments have been fulfilled to evaluate the effect of the project on the natural environment. To fill the gap of investigations, a study on flood and suspended sediment transportation and channel changing along the distributary channel of the Huanghe (Yellow) River was conducted during the WSDR project period in 2007. The lower channel was scoured rapidly and the channel became unobstructed gradually several days after the flood peak water was discharged from the Xiaolangdi Reservoir. Within four days after the flood peak at 3 000 m3/s entered the distributary, the channel in the river mouth area was eroded quickly. Both the mean values of area and depth of the main channel were tripled, and the maximum flood carrying capacity increased to 5 500 m3/s or more. Then, the river channel was silted anew in a very short time after completion of the WSDR. Favored by the WSDR project, the fiver status in April 2008 became better than that of the year before. The adjustment ranges of main channel parameters were about 30%, 10%, and 10% at sections C2, Q4, and Q7, respectively. The process of rapid erosion-deposition was more active 15 km away in the channel from the fiver mouth due to the marine influence. It is reasonable for discharging sediment at concentration peak from Xiaolangdi Reservoir at the end of the flood peak. As a result, the sediment peak reached the river mouth about two days later than that of the water current. In addition, the WSDR project has improved the development of the estuarine wetland. Wetland vegetation planted along the river banks restrained the water flow as a strainer and improved the main channel stability. It is suggested to draw water at mean rate of 150 m3/s from the Huanghe River during flood periods, because at the rate the water in the wetland would be stored and replenished in balance. Moreover, we believe that cropland on the river shoal of the lower Huanghe River should be replaced by wetland. These activities should achieve the Huanghe River management strategy of "To concentrate flow to scour sediment, stabilize the main channel, and regulate water and sediment".
文摘The occurrence and transmission attenuation of surge is always a problem that researchers pay much attention to. The influence of the first wave height of landslide surge and the following transmission attenuation of surge are involved with many factors, which are mainly: landslide water entry angle, river course depth, river course geometrical properties and landslide mass and material, etc.. This thesis is mainly a research on the properties and transmission attenuation rules of landslide surge which is caused by linear narrow river course. Numerical value simulation will be applied in this thesis to discuss about the features and rules of the occurrence and transmission of surge in different landslide water entry angles and under different influences.
基金supported by the Ministry of Science and Technology of China (Grant Nos. 2012BAC06B01, 2012BAC06B04)
文摘The current environmental flow assessment of Chinese rivers is thought to have three shortcomings: The first is that environmental flow requirements of reservoirs in dammed rivers are usually not explicitly considered; the second is that enough attentions have not been paid to the inherent links between flow regime and ecological processes; the third is that most studies focus on the variable range of merely one hydrological element such as discharge needed by riverine ecosystems. Here, first proposed is a holistic method for environmental flow assessment, the flow-ecological response relationship method that is suitable for large rivers with relatively abundant ecological data. Based on the conceptual models and quantitative relationships between flow and ecological response, this method comprehensively considers the ecological conservation requirements of both reservoir and its downstream reach. Then, it is applied to assessing the environmental flows of the Three Gorges Reservoir and its downstream reach by the following steps: 1) Construction of conceptual models of flow-ecological response; 2) identification of ecological targets of environmental flows and their key periods; 3) development of the quantitative relationships between hydrological indicators and ecological indictors; 4) preliminary assessment of environmental flow according to the tradeoff between ecological targets and water demands of human. The environmental flow hydrographs obtained have explicit ecological conservation targets, time schedule of achieving each target, and characteristics of multiple hydrological elements such as flow, water level, frequency, timing, duration and rate of change. The case study has tested the reasonability and feasibility of this method, and the results of this study are expected to provide technical support and decision reference for improving the operation of the Three Gorges-Gezhouba cascade reservoirs.