A novel hydrocyclone with guide vanes, named as axial hydrocyclone(AHC), is designed to tackle the problem of oil–water separation faced by most mature oilfields. Optimal design of the AHC is carried out by using num...A novel hydrocyclone with guide vanes, named as axial hydrocyclone(AHC), is designed to tackle the problem of oil–water separation faced by most mature oilfields. Optimal design of the AHC is carried out by using numerical methods. The effects of guide vanes, cone angle, tapered angle and overflow pipe on the oil–water separation are discussed in this paper. The results show that a double swirling flow is generated in the tapered section where oil–water separation occurs. Both the cylindrical and the tapered section have important influences on AHC performance. On the basis of single factor results, response surface methodology is employed to optimize the AHC design. The experimental results indicate that the novel AHC has an excellent performance for the oil–water separation.展开更多
TOR (Tema oil refinery) is the only petroleum refinery in Ghana. To assess the quality of the wastewater, wastewater samples taken from three points of discharge into the treatment plant and the treated effluent wer...TOR (Tema oil refinery) is the only petroleum refinery in Ghana. To assess the quality of the wastewater, wastewater samples taken from three points of discharge into the treatment plant and the treated effluent were analyzed for physico-chemical characteristics. The levels of the pH, temperature, conductivity, COD (Chemical Oxygen Demand), TDS (Total Dissolved Solids), TSS (Total Suspended Solids) and phenol were assessed from January to June, 2011. The results obtained indicate varied levels of contaminants in both the untreated and treated wastewater. The average values of the treated effluent parameters analyzed were 38 ℃, 6,258 μs.cm-1, 314 mg-L-1, 115 mg.L-1, 2,689 mg-L-1 and 1 mg.L-1 for the temperature, conductivity, COD, TDS, TSS and phenol, respectively. The results suggest that both the raw wastewater and the treated effluent did not meet the discharge limit set by Ghana Environmental Protection Agency. Therefore, the treated effluent required additional treatment before it can be discharged into the environment. This suggests that the wastewater treatment plant of TOR is ineffective for the type of wastewater produced.展开更多
基金Supported by the Scientific Research Project of Beijing Municipal Commission of Education(KM201510017008)the National Natural Science Foundation of China(21677018)+1 种基金the State Key Laboratory of Heavy Oil Processing(SKLOP201403002)the Importation and Development of High-Caliber Talents Project of Beijing Municipal Institutions(CIT&TCD20150317)
文摘A novel hydrocyclone with guide vanes, named as axial hydrocyclone(AHC), is designed to tackle the problem of oil–water separation faced by most mature oilfields. Optimal design of the AHC is carried out by using numerical methods. The effects of guide vanes, cone angle, tapered angle and overflow pipe on the oil–water separation are discussed in this paper. The results show that a double swirling flow is generated in the tapered section where oil–water separation occurs. Both the cylindrical and the tapered section have important influences on AHC performance. On the basis of single factor results, response surface methodology is employed to optimize the AHC design. The experimental results indicate that the novel AHC has an excellent performance for the oil–water separation.
文摘TOR (Tema oil refinery) is the only petroleum refinery in Ghana. To assess the quality of the wastewater, wastewater samples taken from three points of discharge into the treatment plant and the treated effluent were analyzed for physico-chemical characteristics. The levels of the pH, temperature, conductivity, COD (Chemical Oxygen Demand), TDS (Total Dissolved Solids), TSS (Total Suspended Solids) and phenol were assessed from January to June, 2011. The results obtained indicate varied levels of contaminants in both the untreated and treated wastewater. The average values of the treated effluent parameters analyzed were 38 ℃, 6,258 μs.cm-1, 314 mg-L-1, 115 mg.L-1, 2,689 mg-L-1 and 1 mg.L-1 for the temperature, conductivity, COD, TDS, TSS and phenol, respectively. The results suggest that both the raw wastewater and the treated effluent did not meet the discharge limit set by Ghana Environmental Protection Agency. Therefore, the treated effluent required additional treatment before it can be discharged into the environment. This suggests that the wastewater treatment plant of TOR is ineffective for the type of wastewater produced.