The dam of Three Gorges Project is characterized by large flood discharge capacity,more outlets,complicated flood discharge and energy dissipation structure,and the stability of the bank powerhouse dam foundation is e...The dam of Three Gorges Project is characterized by large flood discharge capacity,more outlets,complicated flood discharge and energy dissipation structure,and the stability of the bank powerhouse dam foundation is endangered by large gentle-dip structural plane of the bedrock due to the deep excavation of powerhouse at the dam-toe.For the dam body concrete,the durability requirement is high and the temperature control and crack prevention are difficult.The practical experience which could be used for reference in the design and construction of asphalt concrete core wall for Maopingxi protective earth-rock dam is scarce.The power station operates with high water head and large head variation.The type selection of penstock and intake as well as the embedding way of spiral case are complicated in technique,and the tailrace tunnel with sloping ceiling of underground power plant is arranged instead of traditional tailrace surge tank.For the double-line five-step ship-lock,the design of fully lined ship-lock,high head delivery system and large-sized miter gates and hoists is very challenging due to high operation head,complicated delivery conditions and building in deep excavated rock.The preferred solutions,optimal schemes and technical measures for various structures,as well as the innovation achievements proved by practice are highlighted.展开更多
In order to meet the needs of various tasks of water conservancy project, tunnel excavation under the ground, called hydraulic tunnel. Hydraulic tunnel according to the functions of flood discharge, water diversion, i...In order to meet the needs of various tasks of water conservancy project, tunnel excavation under the ground, called hydraulic tunnel. Hydraulic tunnel according to the functions of flood discharge, water diversion, irrigation, water supply, and the construction diversion tunnel of desilting emptying. Nowadays, water conservancy project on flood discharge runnel design requirements more and more high, so the factors taken into account the amount of spillway tunnel engineering, engineering cost, structure design and other factors to evaluate nature of the spillway tunnel is very important. Therefore, in actual construction, of spillway tunnel of optimization design, whether from the economic point of view, or from the point of view of safety and applicability are necessary. This article mainly from the overall layout of flood discharge tunnel, structure design and so on, and then discuss the optimization scheme.展开更多
文摘The dam of Three Gorges Project is characterized by large flood discharge capacity,more outlets,complicated flood discharge and energy dissipation structure,and the stability of the bank powerhouse dam foundation is endangered by large gentle-dip structural plane of the bedrock due to the deep excavation of powerhouse at the dam-toe.For the dam body concrete,the durability requirement is high and the temperature control and crack prevention are difficult.The practical experience which could be used for reference in the design and construction of asphalt concrete core wall for Maopingxi protective earth-rock dam is scarce.The power station operates with high water head and large head variation.The type selection of penstock and intake as well as the embedding way of spiral case are complicated in technique,and the tailrace tunnel with sloping ceiling of underground power plant is arranged instead of traditional tailrace surge tank.For the double-line five-step ship-lock,the design of fully lined ship-lock,high head delivery system and large-sized miter gates and hoists is very challenging due to high operation head,complicated delivery conditions and building in deep excavated rock.The preferred solutions,optimal schemes and technical measures for various structures,as well as the innovation achievements proved by practice are highlighted.
文摘In order to meet the needs of various tasks of water conservancy project, tunnel excavation under the ground, called hydraulic tunnel. Hydraulic tunnel according to the functions of flood discharge, water diversion, irrigation, water supply, and the construction diversion tunnel of desilting emptying. Nowadays, water conservancy project on flood discharge runnel design requirements more and more high, so the factors taken into account the amount of spillway tunnel engineering, engineering cost, structure design and other factors to evaluate nature of the spillway tunnel is very important. Therefore, in actual construction, of spillway tunnel of optimization design, whether from the economic point of view, or from the point of view of safety and applicability are necessary. This article mainly from the overall layout of flood discharge tunnel, structure design and so on, and then discuss the optimization scheme.