期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
黄河口人海流路规划中泥沙数学模型的应用 被引量:1
1
作者 陆俭益 《人民黄河》 CAS 北大核心 1989年第6期30-34,共5页
在黄河口入海流路规划中,曾用不同的泥沙数学模型对河口水位变化和入海流路的行河年限进行计算,在各模型关于清水沟流路行河年限计算成果比较中可见,由于计算条件相同,成果的差异不大。此外,作者根据神仙沟和钓口河实测资料,分别推估一... 在黄河口入海流路规划中,曾用不同的泥沙数学模型对河口水位变化和入海流路的行河年限进行计算,在各模型关于清水沟流路行河年限计算成果比较中可见,由于计算条件相同,成果的差异不大。此外,作者根据神仙沟和钓口河实测资料,分别推估一定防洪水位下的行河年限,结果与各模型计算值相近。总之,应用泥沙数学模型预估入海流路行河年限作为规划依据是可信的。 展开更多
关键词 黄河口 入海流路 规划 泥沙数学模
下载PDF
Application of the Sediment Mathematical Modelling on Planned Project of Lingdingyang Bay 被引量:6
2
作者 李大鸣 李冰绯 张红萍 《Transactions of Tianjin University》 EI CAS 2002年第4期285-290,共6页
Based on the combined hydraulic calculation for the eastern network region at the Pearl River estuary and several outlets to the Lingdingyang Bay, the sediment calculation modelling was introduced in the establishment... Based on the combined hydraulic calculation for the eastern network region at the Pearl River estuary and several outlets to the Lingdingyang Bay, the sediment calculation modelling was introduced in the establishment of the sediment mathematical model for Lingdingyang Bay and the eastern region with one and two dimensional flow calculation. Model adjustment and verification were performed in conjunction with field data. The simulated results coincide well with measured data.In addition the model is applied to predict the shore-line planning scheme of Lingdingyang Bay.The theoretical criterion is provided for the shore line plan in the model.And a new mathematical simulated method is put out to research the planning engineering concerned with one-dimensional net rivers and two-dimensional estuary. 展开更多
关键词 sediment mathematical model one and two-dimensional flow calculation Lingdingyang bay shore-line plan
下载PDF
Total Reflux Operation of Multivessel Batch Distillation for Separation of Binary Mixtures 被引量:2
3
作者 唐克 白鹏 李广忠 《Chinese Journal of Chemical Engineering》 SCIE EI CAS CSCD 2014年第6期622-627,共6页
Multivessel batch distillation(MVBD) is mainly used to separate mixtures with more than two components. In this article, a new operation mode with MVBD is proposed for separation of binary mixtures under total reflux.... Multivessel batch distillation(MVBD) is mainly used to separate mixtures with more than two components. In this article, a new operation mode with MVBD is proposed for separation of binary mixtures under total reflux. A mathematic model is setup for the simulation. The proposed operation policy and the regular operation with constant reflux are compared theoretically and experimentally. The results show that the new operation mode has great advantages in time saving and operation flexibility. MVBD presents great potential for separation with high efficiency. 展开更多
关键词 multivessel batch distillation total reflux binary system
下载PDF
Numerical Analysis of Emergency River Restoration Scheme for Qingping Mega Debris Flow 被引量:2
4
作者 CHEN Ri-dong LIU Xing-nian +1 位作者 HUANG Er GUO Zhi-xue 《Journal of Mountain Science》 SCIE CSCD 2013年第1期130-136,共7页
The mega debris flow occurred on August 13 th 2010 in Qingping town,China(hereafter called '8.13' Debris Flow) have done great damage to the local habitants as well as to the re-construction projects in the qu... The mega debris flow occurred on August 13 th 2010 in Qingping town,China(hereafter called '8.13' Debris Flow) have done great damage to the local habitants as well as to the re-construction projects in the quake-hit areas,and the channel-fill deposit problem caused by the debris flow was the most destructive.Moreover,it is of high possibility that an even severe deposit problem would reappear and result in worse consequences.In order to maximize risk reduction of this problem,relevant departments of the government established a series of emergency river restoration schemes,for which the numerical analysis is an important procedure to evaluate and determine the optimized one.This study presents a numerical analysis by applying a twodimensional debris flow model combined with a relevant water-sediment model to simulate the deposit during the progress of the debris flow,and to calculate and analyze the river flow field under both the present condition and different restoration conditions.The results show that the debris flow model,which takes the confluence of the Wenjia Gully to the main river into account,could simulate the deposit process quite well.In the reproduced debris flow from the simulation of the '8.13' Debris Flow,the original river flow path has switched to a relatively lower place just along the right bank with a high speed of near 7m.s-1 after being blocked by the deposit,which is highly hazardous.To prevent this hazard,a recommended scheme is derived through inter-comparison of different restoration conditions.It shows that the recommended scheme is able to reduce the water level and as well to regulate the flow path.Based on the given conditions of the mainstream and the tributary confluence for the simulated '8.13' Debris Flow,when encountering a debris flow with deposit volume less than 0.5 million m3,the river channel can endure a 20-year return flood;however,when the deposit volume increases to 2 million m3,the flood capacity of the river will be greatly impacted and the scheme becomes invalid.The recommended scheme supported by the present study has been applied to the emergency river restoration after this mega-debris flow. 展开更多
关键词 Flash flood Debris flow River restoration Numerical analysis Finite element method
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部