At present in the process of water injection station operation, starting and stopping the pump caused system pressure fluctuations, and the fluctuations caused many problems about downstream injection wells. In order ...At present in the process of water injection station operation, starting and stopping the pump caused system pressure fluctuations, and the fluctuations caused many problems about downstream injection wells. In order to eliminate the fluctuations and reduce problems, taking start pump, connect pump test under pressure in the water injection station installed the rotor frequency control system Changqing oil field developed. During the experiment, by progressively increasing the pressure pump to verify start pump with pressure feasibility test, the result shows when the pressure in the 0-25MPa pressure start and connect pump can be realized, and forecast the maximum pressure of the current start of the station with pressure pump. Start pump with pressure achieve the elimination of pressure fluctuations, provide the prerequisites about realizeing stable water injection pressure, and ultimately realize oil field water injection station to be automatic water injection laid a foundation.展开更多
The development and application of a new solution is demonstrated for the type-curve analysis and in-terpretation of well test data from a multiwell reservoir system of both production and injection wells with two-pha...The development and application of a new solution is demonstrated for the type-curve analysis and in-terpretation of well test data from a multiwell reservoir system of both production and injection wells with two-phase flow. The buildup type curves or buildup behavior could be obtained through the solution by using su-perposition. But a new outer boundary condition for variable pressure boundary must be introduced to obtain the correct pressure buildup solutions by superposition. A technique is shown to determine the deviation time from the infinite-acting semilog radial flow stabilization in the derivatives of pressure, which is calculated with respect to and plotted vs. shut-in time. Field examples are given to illustrate the use of the proposed method for analyzing transient pressure data from a well located in a multi-well water-injection reservoir. An adaptive genetic algorithm-based method is used to match the pressure and pressure derivative data to estimate reservoir parameters. The validity and applicability of the proposed method are also demonstrated through the examples.展开更多
The self-extinguishing behavior of kerosene spray fire was investigated in a completely enclosed compartment with the size of 3 m× 3 m × 3.4 m. The spray was generated by locating one BETE nozzle at the cent...The self-extinguishing behavior of kerosene spray fire was investigated in a completely enclosed compartment with the size of 3 m× 3 m × 3.4 m. The spray was generated by locating one BETE nozzle at the center of the bottom wall. A series of spray fire videos were obtained by changing BETE nozzle type and injecting pressure. The results show that spray ftre undergoes four stages: the growth stage, the quasi-steady stage, the stretch stage and the self-extinguishing stage. Consumption of large quantities of oxygen causes spray fire to first be stretched and then quench. In this process, fire base migrates away from spray region and leads to the emergence of ghost- hag fire. Ghosting fire promotes the instability of spray fire and large fluctuation of its height, which provides help to its self-extinguishing. With increasing the injecting pressure or the nozzle diameter, the self-extinguishing time decreases. It is found that the self-extinguishing time is approximately in inverse relation with injecting flow rate. Additionally, we also observed the occurrence of two-phase de flagration just after ignition, and it accelerates the spray fire growth and induces a larger fire height than the following quasi-steady spray fire. The deflagration turns stronger with increasing the injecting pressure.展开更多
文摘At present in the process of water injection station operation, starting and stopping the pump caused system pressure fluctuations, and the fluctuations caused many problems about downstream injection wells. In order to eliminate the fluctuations and reduce problems, taking start pump, connect pump test under pressure in the water injection station installed the rotor frequency control system Changqing oil field developed. During the experiment, by progressively increasing the pressure pump to verify start pump with pressure feasibility test, the result shows when the pressure in the 0-25MPa pressure start and connect pump can be realized, and forecast the maximum pressure of the current start of the station with pressure pump. Start pump with pressure achieve the elimination of pressure fluctuations, provide the prerequisites about realizeing stable water injection pressure, and ultimately realize oil field water injection station to be automatic water injection laid a foundation.
文摘The development and application of a new solution is demonstrated for the type-curve analysis and in-terpretation of well test data from a multiwell reservoir system of both production and injection wells with two-phase flow. The buildup type curves or buildup behavior could be obtained through the solution by using su-perposition. But a new outer boundary condition for variable pressure boundary must be introduced to obtain the correct pressure buildup solutions by superposition. A technique is shown to determine the deviation time from the infinite-acting semilog radial flow stabilization in the derivatives of pressure, which is calculated with respect to and plotted vs. shut-in time. Field examples are given to illustrate the use of the proposed method for analyzing transient pressure data from a well located in a multi-well water-injection reservoir. An adaptive genetic algorithm-based method is used to match the pressure and pressure derivative data to estimate reservoir parameters. The validity and applicability of the proposed method are also demonstrated through the examples.
基金supported by National Natural Science Foundation of China(Grant No.51276177)
文摘The self-extinguishing behavior of kerosene spray fire was investigated in a completely enclosed compartment with the size of 3 m× 3 m × 3.4 m. The spray was generated by locating one BETE nozzle at the center of the bottom wall. A series of spray fire videos were obtained by changing BETE nozzle type and injecting pressure. The results show that spray ftre undergoes four stages: the growth stage, the quasi-steady stage, the stretch stage and the self-extinguishing stage. Consumption of large quantities of oxygen causes spray fire to first be stretched and then quench. In this process, fire base migrates away from spray region and leads to the emergence of ghost- hag fire. Ghosting fire promotes the instability of spray fire and large fluctuation of its height, which provides help to its self-extinguishing. With increasing the injecting pressure or the nozzle diameter, the self-extinguishing time decreases. It is found that the self-extinguishing time is approximately in inverse relation with injecting flow rate. Additionally, we also observed the occurrence of two-phase de flagration just after ignition, and it accelerates the spray fire growth and induces a larger fire height than the following quasi-steady spray fire. The deflagration turns stronger with increasing the injecting pressure.