The pharmacokinetics and absolute bioavailability of the sublingual naloxone tablet were studied with HPLC-electrochemical detection. Eight male dogs received single 5 mg dose of naloxone intravenously, the plasma con...The pharmacokinetics and absolute bioavailability of the sublingual naloxone tablet were studied with HPLC-electrochemical detection. Eight male dogs received single 5 mg dose of naloxone intravenously, the plasma concentration-time curves could be fitted to two-compartment open model, with 12.0 min of t1/2( , 143.4 min of t1/2( and 7.92 mg(min/L of AUC. The same eight dogs received 5 mg dose of the sublingual naloxone tablet after an interval of a week. The main pharmacokinetic parameters were: t1/2ka = 11.0 min, t1/2( = 15.4 min, t1/2( = 164.1 min, Tmax = 27.7 min, Cmax = 34.2 ng / ml, and AUC = 6.79 mg(min / L, respectively. The plasma concentration-time curves were fitted to the first order absorption two-compartment open model also. The mean absolute bioavailability of the sublingual naloxone tablet was 86.8 ( 10.9%. No statistically significant differences were found with t1/2(, t1/2(, ( and ( between the two routes of administration. These results indicated that the course of disposition for naloxone in dogs was similar for the two routes of administration, and the absolute bioavailability of the sublingual naloxone tablet was high. Thus satisfactory clinical effects could be expected.展开更多
Hydropower development in China is concentrated in the country's western regions.Among all the rivers in China,the lower course of the Jinsha River contains the richest hydro-energy resource,and therefore,4 mammot...Hydropower development in China is concentrated in the country's western regions.Among all the rivers in China,the lower course of the Jinsha River contains the richest hydro-energy resource,and therefore,4 mammoth hydropower plants are under construction on this particular section of the river at Wudongde,Baihetan,Xiluodu,and Xiangjiaba.The water-blocking structures of the hydropower facilities at Wudongde,Baihetan and Xiluodu are all arch dams of around 300 m high.In view of changes in the geological conditions at the foundation of the Xiluodu dam on the riverbed after excavation started,the designs of expanding foundation surface excavation and dovetailing the dam body and foundation rock on both upstream and downstream sides were introduced,allowing the arch dam and foundation to fit each other and improving the stress conditions of the dam body and foundation.By dividing the dam body into various concrete sections,the dynamic properties of concrete were adequately adjusted to the distribution of stress in the dam body.In addition,the use of the most optimal concrete material and mixture ratio allowed thermodynamics of concrete to satisfy the requirements of the strength,durability,temperature control and crack prevention of the concrete.Moreover,rigorous temperature control measures were introduced to prevent harmful cracking,thus enhancing the integrity of the arch dam.Furthermore,sophisticated construction machinery,scientific testing methods,and sound construction techniques were employed to ensure the uniformity and reliability of concrete placement.The "Digital Dam" for the Xiluodu project,which is based on the theory of total life cycle,has supplied strong support for construction process control and decision-making.展开更多
文摘The pharmacokinetics and absolute bioavailability of the sublingual naloxone tablet were studied with HPLC-electrochemical detection. Eight male dogs received single 5 mg dose of naloxone intravenously, the plasma concentration-time curves could be fitted to two-compartment open model, with 12.0 min of t1/2( , 143.4 min of t1/2( and 7.92 mg(min/L of AUC. The same eight dogs received 5 mg dose of the sublingual naloxone tablet after an interval of a week. The main pharmacokinetic parameters were: t1/2ka = 11.0 min, t1/2( = 15.4 min, t1/2( = 164.1 min, Tmax = 27.7 min, Cmax = 34.2 ng / ml, and AUC = 6.79 mg(min / L, respectively. The plasma concentration-time curves were fitted to the first order absorption two-compartment open model also. The mean absolute bioavailability of the sublingual naloxone tablet was 86.8 ( 10.9%. No statistically significant differences were found with t1/2(, t1/2(, ( and ( between the two routes of administration. These results indicated that the course of disposition for naloxone in dogs was similar for the two routes of administration, and the absolute bioavailability of the sublingual naloxone tablet was high. Thus satisfactory clinical effects could be expected.
文摘Hydropower development in China is concentrated in the country's western regions.Among all the rivers in China,the lower course of the Jinsha River contains the richest hydro-energy resource,and therefore,4 mammoth hydropower plants are under construction on this particular section of the river at Wudongde,Baihetan,Xiluodu,and Xiangjiaba.The water-blocking structures of the hydropower facilities at Wudongde,Baihetan and Xiluodu are all arch dams of around 300 m high.In view of changes in the geological conditions at the foundation of the Xiluodu dam on the riverbed after excavation started,the designs of expanding foundation surface excavation and dovetailing the dam body and foundation rock on both upstream and downstream sides were introduced,allowing the arch dam and foundation to fit each other and improving the stress conditions of the dam body and foundation.By dividing the dam body into various concrete sections,the dynamic properties of concrete were adequately adjusted to the distribution of stress in the dam body.In addition,the use of the most optimal concrete material and mixture ratio allowed thermodynamics of concrete to satisfy the requirements of the strength,durability,temperature control and crack prevention of the concrete.Moreover,rigorous temperature control measures were introduced to prevent harmful cracking,thus enhancing the integrity of the arch dam.Furthermore,sophisticated construction machinery,scientific testing methods,and sound construction techniques were employed to ensure the uniformity and reliability of concrete placement.The "Digital Dam" for the Xiluodu project,which is based on the theory of total life cycle,has supplied strong support for construction process control and decision-making.