期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
基于中职机械类专业学生核心素养的活动设计 被引量:2
1
作者 李丹 《内蒙古教育(B)》 2018年第3期38-39,共2页
中职机械类专业具有很高的实训性和应用性,技术含量也极高,开展该项专业教学活动,必须重视培养学生的吃苦耐劳精神与创新实践精神,不断发展学生的核心素养。本文将简析中职机械类专业学生核心素养的活动设计方案,并提出个人见解。
关键词 中职机械类专业 学生 核心素养 活动设计方案
下载PDF
Event Scenario Analysis for the Design of Rockslide Countermeasures
2
作者 GIGLI Giovanni INTRIERI Emanuele +5 位作者 LOMBARDI Luca NOCENTINI Massimiliano FRODELLA William BALDUCCI Marco VENANTI Luca Domenico CASAGLI Nicola 《Journal of Mountain Science》 SCIE CSCD 2014年第6期1521-1530,共10页
The Torgiovannetto quarry(Assisi municipality,central Italy) is an example of a site where the natural equilibrium was altered by human activity,causing current slope instability phenomena which threaten two roadways ... The Torgiovannetto quarry(Assisi municipality,central Italy) is an example of a site where the natural equilibrium was altered by human activity,causing current slope instability phenomena which threaten two roadways important for the local transportation.The quarry front,having a height of about 140 m,is affected by a 182,000 m3 rockslide developed in intensely fractured limestone and is too large to be stabilized.In 2003 some tension cracks were detected in the vegetated area above the quarry upper sector.From then on,several monitoring campaigns were carried out by means of different instrumentations(topographic total station,extensometers,inclinometers,ground-based interferometric radar,laser scanner and infrared thermal camera),allowing researchers to accurately define the landslide area and volume.The latter's major displacements are localized in the eastern sector.The deformational field appears to be related to the seasonal rainfall.The landslide hazard associated with the worst case scenario was evaluated in terms of magnitude,intensity and triggering mechanism.For the definition of the possible runout process the DAN 3D code was employed.The simulation results were used in order to design and construct a retaining embankment.Furthermore,in order to preserve both the safety of the personnelinvolved in its realization and of the roadways users,an early warning system was implemented.The early warning system is based on daily-averaged displacement velocity thresholds.The alarm level is reached if the prediction based on the methods of Saito(1969) and Fukuzono(1985) forecasts an imminent rupture. 展开更多
关键词 Risk scenarios Risk management LANDSLIDES MONITORING Rock avalanche
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部