The NP-hard no-wait flow shop scheduling problems with makespan and total flowtime minimization are considered. Objective increment properties of the problems are analyzed. A non-dominated classification method is int...The NP-hard no-wait flow shop scheduling problems with makespan and total flowtime minimization are considered. Objective increment properties of the problems are analyzed. A non-dominated classification method is introduced to class population individuals into Pareto fronts to improve searching efficiency. Besides investigating the crowding distance and the elitist solution strategy, two effective bi-criteria local search procedures based on objective increments are presented to improve searching effectiveness. Based on the properties and methods, a hybrid evolutionary algorithm is proposed for the considered problems and compared with the best existing algorithms. Experimental results show that the proposed algorithm is effective with high efficiency.展开更多
In this work, we propose a new model of evolution networks, which is based on the evolution of the traffic flow. In our method, the network growth does not take into account preferential attachment, and the attachment...In this work, we propose a new model of evolution networks, which is based on the evolution of the traffic flow. In our method, the network growth does not take into account preferential attachment, and the attachment of new node is independent of the degree of nodes. Our aim is that employing the theory of evolution network, we give a further understanding about the dynamical evolution of the traffic flow. We investigate the probability distributions and scaling properties of the proposed model The simulation results indicate that in the proposed model, the distribution of the output connections can be well described by scale-free distribution. Moreover, the distribution of the connections is largely related to the traffic flow states, such as the exponential distribution (i.e., the scale-free distribution) and random distribution etc.展开更多
基金The National Natural Science Foundation of China(No.60504029,60672092)the National High Technology Research and Development Program of China(863Program)(No.2008AA04Z103)
文摘The NP-hard no-wait flow shop scheduling problems with makespan and total flowtime minimization are considered. Objective increment properties of the problems are analyzed. A non-dominated classification method is introduced to class population individuals into Pareto fronts to improve searching efficiency. Besides investigating the crowding distance and the elitist solution strategy, two effective bi-criteria local search procedures based on objective increments are presented to improve searching effectiveness. Based on the properties and methods, a hybrid evolutionary algorithm is proposed for the considered problems and compared with the best existing algorithms. Experimental results show that the proposed algorithm is effective with high efficiency.
基金The project supported by National Natural Science Foundations of China under Grant Nos and Technology Foundation of Beijing Jiaotong University under Grant No. 2004SM026 70471088 and 70225005 and Che Science.
文摘In this work, we propose a new model of evolution networks, which is based on the evolution of the traffic flow. In our method, the network growth does not take into account preferential attachment, and the attachment of new node is independent of the degree of nodes. Our aim is that employing the theory of evolution network, we give a further understanding about the dynamical evolution of the traffic flow. We investigate the probability distributions and scaling properties of the proposed model The simulation results indicate that in the proposed model, the distribution of the output connections can be well described by scale-free distribution. Moreover, the distribution of the connections is largely related to the traffic flow states, such as the exponential distribution (i.e., the scale-free distribution) and random distribution etc.