Indonesian National Electricity Company (PT.PLN (Persero)) has planned to install additional high voltage undersea cable for circuit llI and IV Java-Bali to fulfill electricity demand in Bali. This project was mor...Indonesian National Electricity Company (PT.PLN (Persero)) has planned to install additional high voltage undersea cable for circuit llI and IV Java-Bali to fulfill electricity demand in Bali. This project was more prefered compared to building another power plant in Bali which could raise social and cultural resistance. Life cycle cost method was used to complete the financial feasibility study to ensure if the project has economic benefit, and the asset would be used effectively and efficiently along its benefit period. In this paper, a life cycle cost will be simulated to analyze which alternative is the most profitable: installation circuit III and IV in 2012 or installation circuit III in 2012 and circuit IV in 2017 in accordance with load forecasting demand. This study is used to help the management to make a decision about the project.展开更多
文摘Indonesian National Electricity Company (PT.PLN (Persero)) has planned to install additional high voltage undersea cable for circuit llI and IV Java-Bali to fulfill electricity demand in Bali. This project was more prefered compared to building another power plant in Bali which could raise social and cultural resistance. Life cycle cost method was used to complete the financial feasibility study to ensure if the project has economic benefit, and the asset would be used effectively and efficiently along its benefit period. In this paper, a life cycle cost will be simulated to analyze which alternative is the most profitable: installation circuit III and IV in 2012 or installation circuit III in 2012 and circuit IV in 2017 in accordance with load forecasting demand. This study is used to help the management to make a decision about the project.