期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
淤泥大坝上下游防渗加固改造技术及渗流分析
1
作者 王冶志 李翠兰 《水利科技与经济》 2024年第4期38-43,共6页
淤泥大坝是一种常见的坝型,因其建造材料的特殊性,导致防渗水效果较差。为了提升大坝防渗效果,针对两种加固方案进行探讨。结果显示,方案A中的A13方案加固后的坝体单宽渗流量相较于初始值减少91.67%;出口渗透比降与初始值相比,减少93.59... 淤泥大坝是一种常见的坝型,因其建造材料的特殊性,导致防渗水效果较差。为了提升大坝防渗效果,针对两种加固方案进行探讨。结果显示,方案A中的A13方案加固后的坝体单宽渗流量相较于初始值减少91.67%;出口渗透比降与初始值相比,减少93.59%;A13方案改进后坝体的水流浸润线相较于原始高度,减少40.0%。因此,采用A方案中的A13方案,坝体满足渗透稳定要求。研究结果对淤泥大坝的防渗技术研究有一定的参考作用。 展开更多
关键词 淤泥大坝 防渗 加固 技术 渗流分析
下载PDF
Runoff and Sediment Load from the Right Bank Valleys of Mosul Dam Reservoir 被引量:1
2
作者 Mohammad Ezz-Aldeen Mohammad Nadhir A1-Ansari Sven Knutsson 《Journal of Civil Engineering and Architecture》 2012年第10期1405-1410,共6页
Mosul Dam is a Multipurpose Project on the River Tigris in Iraq with 11.11 billion m3 storage capacity. It is used to store the water for irrigation, hydropower generation, and flood control. As in other dams in the w... Mosul Dam is a Multipurpose Project on the River Tigris in Iraq with 11.11 billion m3 storage capacity. It is used to store the water for irrigation, hydropower generation, and flood control. As in other dams in the world, this dam also have sedimentation problem. Sediment accumulation in its reservoir can effect the dam operation (pumping station, hydropower plants, and bottom outlets) and it will definitely shorten the life span of the dam. In this study, the SWAT (soil and water assessment tool) under (]IS (Geographical Information System) was applied to simulate the yearly surface rtmoff and sediment load for the main three valleys on the right bank of Mosul Dam Reservoir. The simulation considered for the twenty one years begin from the dam operation in 1988 to 2008. The resultant values of the average annual sediment load are 35.6~ 103, 4.9 ~ 103, and 2.2~ 103 ton, while the average values of sediment concentration are 1.73, 1.65, and 2.73 kg/m3 for the considered valleys one, two and three respectively. This implies that significant sediment load enters the reservoir from these valleys. To minimize the sediment load entering the reservoir, a check dam is to be constructed in suitable sites especially for valley one. The check dam can store the runoff water and trap the sediment load, and then the flow can be released to the reservoir. 展开更多
关键词 Mosul dam RUNOFF sediment load SWAT model GIS
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部