期刊文献+
共找到5篇文章
< 1 >
每页显示 20 50 100
排列图与分层法在现浇混凝土构件尺寸质量控制中的运用——以中锐星尚城项目为例 被引量:1
1
作者 朱柯松 《工程质量》 2022年第5期37-41,共5页
排列图是数据资料分析的基础方法与重要工具,而分层法是数据分析和整理的基本方法。将二者运用于工程质量管理尤其是质量控制过程中,对查找影响质量的主次因素并排序、剖析影响成因、探析解决手段或措施具有非常重要的意义。论文介绍了... 排列图是数据资料分析的基础方法与重要工具,而分层法是数据分析和整理的基本方法。将二者运用于工程质量管理尤其是质量控制过程中,对查找影响质量的主次因素并排序、剖析影响成因、探析解决手段或措施具有非常重要的意义。论文介绍了综合采用排列图和分层法相结合,控制现浇混凝土构件尺寸和质量的过程。 展开更多
关键词 排列图 分层法 混现浇凝土 质量控制
下载PDF
Experimental study on mechanical property of stiffening-ribbed-hollow-pipe cast-in place reinforced concrete girderless floor 被引量:4
2
作者 YANG Wei-jun ZHANG Zhen-hao LIU Chen-wei 《Journal of Civil Engineering and Architecture》 2009年第3期59-69,共11页
Stiffening-ribbed-hollow-pipe cast-in place reinforced concrete girderless floor is a new-style hollow girderless floor system. Model experimental researches of simply-supported floor and four-corners bearing floor ha... Stiffening-ribbed-hollow-pipe cast-in place reinforced concrete girderless floor is a new-style hollow girderless floor system. Model experimental researches of simply-supported floor and four-corners bearing floor have been done on this new kind of floor system in this paper. The experiment results show that the floor system has good mechanical property such as high bearing capacity, big rigidity and good tensility. A theoretical method is presented in this paper that the stiffening-ribbed-hollow-pipe girderless floor can be analyzed by being converted equivalently to orthotropic solid slab. It is indicated that the method is correct and reasonable according to the contrast between theoretical calculated results and experimental measured results. The theoretical results coincide with the measured results well. 展开更多
关键词 stiffening ribbed hollow pipe cast-in place reinforced concrete girderless floor experiment analogous orthotropic plate RIGIDITY
下载PDF
Linear monitoring for cast-in-place reinforced concrete arch bridge construction 被引量:1
3
作者 ZHENG Yifeng CAO Yu WANG Yuanyuan 《Global Geology》 2012年第2期145-150,共6页
Linear monitoring is an important link of bridge construction control,which is conducted in key processes of construction to ensure the security of bridge in construction procedure. Combining with main arch constructi... Linear monitoring is an important link of bridge construction control,which is conducted in key processes of construction to ensure the security of bridge in construction procedure. Combining with main arch construction monitoring program of No. 2 bridge in north district of Changbai international tourism resort,main content and key technologies are recommended. Considering the various influential factors during the construction process,linear adjustment is handled to ensure that the stress and linear of main arch meet design requirements. 展开更多
关键词 arch box linear monitoring pre-loading pressure bailey beam
下载PDF
Design and construction of high and large span cast-in-place reinforced concrete cantilever flowering frame beam
4
作者 WANG Rui ZHEN Liang +2 位作者 WAN Chao WU Jing SHEN Yan-jun 《Journal of Civil Engineering and Architecture》 2009年第5期58-62,共5页
The high and large span cast-in-place reinforced concrete cantilever structure of the office building of some court, which is located I-steel at the cantilever and used steel pipe scaffold as the support, has guarante... The high and large span cast-in-place reinforced concrete cantilever structure of the office building of some court, which is located I-steel at the cantilever and used steel pipe scaffold as the support, has guaranteed the frame body and structure security by the frame body calculating, on-site test and reasonable construction order. 展开更多
关键词 cast-in-place reinforced concrete support of cantilever structure high and long span design and construction
下载PDF
Bridge Falsework in Staged Construction of a Prestressed Concrete Beam Bridge
5
作者 Janusz Hotowaty Dariusz Jurkowski 《Journal of Civil Engineering and Architecture》 2015年第12期1432-1438,共7页
The formwork and falsework in the construction of twin ribbed slab decks on a multi-span ecological bridge for a dual carriageway are presented. The bridge is situated in a valley plain which is crossed by small river... The formwork and falsework in the construction of twin ribbed slab decks on a multi-span ecological bridge for a dual carriageway are presented. The bridge is situated in a valley plain which is crossed by small rivers and was designed principally with the environment in mind. The bridge length is over 356 m, and the width of the decks is 11.5 m. For the bridge works, a simple conventional falsework system was chosen with steel frames for the supports and steel rolled beams for the decks. The formwork was constructed in solid timber and plywood as multiple-use panels. The falsework was designed in order to build the two 10-span bridge decks in stages. The decks are continuous cast-in-situ prestressed concrete twin rib with spans of 30 m, 34 m and 45 m. An individual falsework system was designed, which was easy to move transversally following completion of each stage for one deck. After finishing each stage, for the second deck, the falsework was dismantled and used again in the next construction fronts. An individual arrangement for the falsework along with timber pilings was used to cross the biggest river. The formwork timber panels were used several times in the multistage bridge construction. The adopted falsework system is very simple, but it allowed the speedy construction of the two decks where there were severe time constraints. 展开更多
关键词 Prestress concrete bridge continuous bridge twin rib deck span-by-span construction FORMWORK falsework.
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部