期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
浅谈清单合同价的调整
1
作者 高莉 《经济技术协作信息》 2009年第26期104-104,共1页
本文介绍了清单合同价的类型,合同价调整的主要依据,以及清单合同价的调整方法。合同价调整包括工程量清单项目、数量和单价的调整。工程设计变更调整,价格波动调整和双方约定的其他调整。
关键词 清单合同价 调整 依据 的确定 格波动 索赔
下载PDF
Study on engineering audit based on Valuation
2
作者 Wei Zuo Xiaoli Hu Lili Dou 《International English Education Research》 2015年第3期38-39,共2页
in the bill of quantities mode, audit department how to perform the function of supervision, control the cost of the project, to improve the infrastructure investment efficiency to have the important meaning. This art... in the bill of quantities mode, audit department how to perform the function of supervision, control the cost of the project, to improve the infrastructure investment efficiency to have the important meaning. This article from the valuation list elements of engineering audit mode based solutions, engineering audit under BOQ valuation mode is put forward from the audit information management, engineering contract claim, audit personnel quality etc.. 展开更多
关键词 list valuation project audit BIDDING
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部