潜水钻成孔灌注桩在住宅楼基础施工中的应用 被引量:1
1
作者 梁建刚 《山西水利》 2007年第6期62-63,共2页
介绍了在场地地基严重液化的环境中进行桩基础施工的工艺要求,并总结了潜水钻成孔灌柱桩的安全保证措施,可为同类型施工提供借鉴经验。
关键词 成孔灌注植 护筒 潜水钻
下载PDF
潜水钻机在软弱地层钻孔灌注桩中的应用 被引量:3
2
作者 宋世杰 栾国栋 《地质装备》 2014年第4期39-41,共3页
本文分析了潜水钻机理及其在软弱地层钻孔灌注桩施工中的成孔速度快、设备维修简单、移动灵活、震动小、噪音低、经济效益好等优越性,讨论了施工中存在的糊钻、钢筋笼上浮的原因及处理方法。
关键词 潜水钻 软弱地层 孔灌注桩 钢筋笼上浮 经济效益
下载PDF
The motion performance and mooring system of deepwater semi-submersible drilling unit 被引量:1
3
作者 冯珩 孙春梅 +1 位作者 陈正伟 洪学福 《Journal of Marine Science and Application》 2009年第3期233-236,共4页
This paper analyzes the motion performance and mooring system of deepwater semi-submersible drilling unit in the district of the South China Sea using the MOSES procedure system. After the 3-D panel model of the unit ... This paper analyzes the motion performance and mooring system of deepwater semi-submersible drilling unit in the district of the South China Sea using the MOSES procedure system. After the 3-D panel model of the unit was built, the 3-D diffraction-radiation theory was used to obtain the hydrodynamic loads on the wet surfaces and the response amplitude operators (RAO) of the unit. According to the environmental data, the short-term motion response to motion performance of the unit is predicted by the spectral method. Then a time-domain calculation was done to analyze the motion of the unit with its mooring system. The research results can be a reference for the model test of unit. 展开更多
关键词 deepwater semi-submersible drilling unit motion response response amplitude operators (RAO) mooring system
下载PDF
Evaluation of Station Keeping Systems for Deepwater Drilling Semi-submersibles 被引量:2
4
作者 宋安科 孙丽萍 +1 位作者 罗勇 王强 《Journal of Marine Science and Application》 2010年第3期312-316,共5页
This paper addresses the need for systematic evaluation of the station keeping systems of deepwater drilling semi-submersibles.Based on the selected drilling semi-submersible configuration, the mooring systems were an... This paper addresses the need for systematic evaluation of the station keeping systems of deepwater drilling semi-submersibles.Based on the selected drilling semi-submersible configuration, the mooring systems were analyzed and designed for a range of water depths using different mooring line materials.These were steel wire rope, polyester rope and HMPE (high modulus poly ethylene).The mooring analysis was carried out using the advanced fully coupled time domain analysis method in the computer software package HARP.Diffraction analysis was first applied to solve the hydrodynamic properties of the vessel and then the motion equations of the complete dynamic system including the drilling rig, the mooring lines and risers were developed and solved in the time domain.Applying the advanced analysis method, a matrix of mooring systems was developed for operating in water depths of 1000 m, 1500 m, and 2 000 m using various mooring materials.The development of mooring systems was conducted in accordance with the commonly adopted mooring design code, API RP 2SK and API RP 2SM.Fresh attempts were then made to comparatively evaluate the mooring system's characteristics and global performance.Useful results have been obtained in terms of mooring materials, water depths, and key parameters of mooring configurations.The results provide in-depth insight for the design and operation of deepwater mooring systems in the South China Sea environment. 展开更多
关键词 polyester line mooring system time domain analysis
下载PDF
Analysis and Design of Trial Well Mooring in Deepwater of the South China Sea 被引量:2
5
作者 Yongfeng Guo Shaojun Ji +3 位作者 Changquan Tang Jiansong Li Huiquan Zhong Ong Chin Yam Ian 《Journal of Marine Science and Application》 2012年第2期222-227,共6页
Mooring systems play an important role for semi-submersible rigs that drill in deepwater.A detailed analysis was carried out on the mooring of a semi-submersible rig that conducted a trial well drilling at a deepwater... Mooring systems play an important role for semi-submersible rigs that drill in deepwater.A detailed analysis was carried out on the mooring of a semi-submersible rig that conducted a trial well drilling at a deepwater location in the South China Sea in 2009.The rig was 30 years old and had a shallow platform with a designed maximum operating water depth of 457 m.Following the mooring analysis,a mooring design was given that requires upgrading of the rig’s original mooring system.The upgrade included several innovations,such as installing eight larger anchors,i.e.replacing the original anchors and inserting an additional 600 m of steel wires with the existing chains.All this was done to enhance the mooring capability of the rig in order for the rig to be held in position to conduct drilling at a water depth of 476 m.The overall duration of the drilling was 50 days and the upgraded mooring system proved to be efficient in achieving the goal of keeping the rig stationary while it was drilling the trial well in the South China Sea.This successful campaign demonstrates that an older semi-submersible rig can take on drilling in deep water after careful design and proper upgrading and modification to the original mooring system. 展开更多
关键词 offshore anchor operation MOORING chain wire CHASER drilling engineering semi submersible South China Sea anchor handling vessel(AHV)
下载PDF
复杂地质及周边环境条件下桩基成孔机械选择 被引量:2
6
作者 肖建宇 魏全成 《建筑机械化》 2020年第1期56-57,共2页
依托贵州某城市城镇棚户区改造桩基工程项目实际,分析了在复杂周边环境及复杂地层条件下桩基成孔机械选择的影响因素,通过对比不同桩基成孔机械设备的性能和适用范围并结合本项目特点,最终采用潜水钻机进行桩基成孔,克服了不利施工条件... 依托贵州某城市城镇棚户区改造桩基工程项目实际,分析了在复杂周边环境及复杂地层条件下桩基成孔机械选择的影响因素,通过对比不同桩基成孔机械设备的性能和适用范围并结合本项目特点,最终采用潜水钻机进行桩基成孔,克服了不利施工条件,取得了较好的施工效果。 展开更多
关键词 桩基 成孔机械 潜水钻 复杂地质
原文传递