期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
灌浆拉索索力的试验研究
1
作者 陈昀明 夏樟华 +1 位作者 林友勤 张凡龙 《铁道学报》 EI CAS CSCD 北大核心 2019年第4期151-158,共8页
为研究索长、边界条件和附加质量等对灌浆拉索索力计算的影响规律,以灌浆吊杆和体外索等为工程背景,采用?15.2高强度钢绞线模拟拉索,开展24个裸索、24个外套PVC管拉索以及24个灌浆拉索模型的索力试验,并推导带均布附加质量的拉索索力计... 为研究索长、边界条件和附加质量等对灌浆拉索索力计算的影响规律,以灌浆吊杆和体外索等为工程背景,采用?15.2高强度钢绞线模拟拉索,开展24个裸索、24个外套PVC管拉索以及24个灌浆拉索模型的索力试验,并推导带均布附加质量的拉索索力计算公式;分析边界条件、灌浆附加质量以及拉索长度等参数对索力的影响规律,比较计算公式的误差和适用性。结果表明:试验拉索索力计算中,边界条件可以假定为铰接,需要考虑外套套管和灌浆等附加质量的影响;灌浆拉索索力计算误差大都在15.0%以内且随附加质量线密度的增加而逐渐增大。研究结果可以为灌浆拉索索力计算提供依据。 展开更多
关键词 灌浆拉索 附加质量 轴拉梁 索力测试
下载PDF
Parametric study on the axial performance of a fully grouted cable bolt with a new pull-out test 被引量:7
2
作者 Chen Jianhang Hagan Paul C. Saydam Serkan 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第1期53-58,共6页
Modified cable bolts are commonly used in underground mines due to their superior performance in preventing bed separation when compared with plain strands. To better test the axial performance of a wide range of cabl... Modified cable bolts are commonly used in underground mines due to their superior performance in preventing bed separation when compared with plain strands. To better test the axial performance of a wide range of cable bolts,a new laboratory short encapsulation pull test(LSEPT) facility was developed. The facility simulates the interaction between cable bolts and surrounding rock mass,using artificial rock cylinders with a diameter of 300 mm in which the cable bolt is grouted. Furthermore,the joint where the load is applied is left unconstrained to allow shear slippage at the cable/grout or grout/rock interface.Based on this apparatus,a series of pull tests were undertaken using the MW9 modified bulb cable bolt.Various parameters including embedment length,test material strength and borehole size were evaluated. It was found that within a limited range of 360 mm,there is a linear relationship between the maximum bearing capacity of the cable bolt and embedment length. Beyond 360 mm,the peak capacity continues to rise but with a much lower slope. When the MW9 cable bolt was grouted in a weak test material,failure always took place along the grout/rock interface. Interestingly,increasing the borehole diameter from 42 to 52 m in weak test material altered the failure mode from grout/rock interface to cable/grout interface and improved the performance in terms of both peak and residual capacity. 展开更多
关键词 Modified cable boltsLoad transfer performanceShear slippageCable/grout interfaceEmbedment length
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部