The rheological behavior of phosphoric acid-water glass grout in different mixing ratios was studied. Grout made of water glass with Baume degree of 20° and 13.4% phosphoric acid by 1:1 volume ratio is found to b...The rheological behavior of phosphoric acid-water glass grout in different mixing ratios was studied. Grout made of water glass with Baume degree of 20° and 13.4% phosphoric acid by 1:1 volume ratio is found to be more effective in stopping water. Laboratory model test of water shutoff by grouting was conducted. Test results show that the diffusion length and water cutoff effect of the grout are significantly improved as the grout head is raised, due to the dilution of underground water, and it takes the grout longer than its gel time to cut off water.展开更多
The subsidence prediction theory under the condition of grouting into bedseparated was developed. Reducing ground subsidence by grouting was carried out on eight fully-mechanized top-coal caving faces, by using the co...The subsidence prediction theory under the condition of grouting into bedseparated was developed. Reducing ground subsidence by grouting was carried out on eight fully-mechanized top-coal caving faces, by using the continuous grouting in multiple-layer to obtain experiment results of reducing subsidence under fully mining. The similar material model that can be dismantled under the condition of constant temperature and constant humidity was developed. The model was used to simulate the evolution of overburden bed-separated under such constraints of temperature and humidity, at the same time, and to test the hardening process of similar materials.展开更多
The water level rising rate of Tangshan mine well significantly accelerated in 2010,and the ascensional range was obviously higher than that of the same period in previous years.From the view of groundwater dynamics a...The water level rising rate of Tangshan mine well significantly accelerated in 2010,and the ascensional range was obviously higher than that of the same period in previous years.From the view of groundwater dynamics and loading effects,and based on the water pumping( pouring) water test model and semi-infinite elastic space theory model under uniform load,the effects of grouting and loading of nearby building construction on the well water level were analyzed. Results show that grouting at a distance of 200 ~ 700 m to the well,with amount of 2500m3 per day and duration of 270 d,can cause an 8 ~ 11 m rise of well water level; and loading of large-area building construction can cause about a 4m rise of well water level. Through the analysis of these factors,we find that the water level anomalous rising of Tangshan mine well was relevant to grouting and loading of the nearby building construction. This study provides a scientific basis for anomalous rising analysis of water level of Tangshan mine well.展开更多
基金Projects(41472278,41202220)supported by the National Natural Science Foundation of ChinaProject(20120022120003)supported by the Research Fund for the Doctoral Program of Higher Education,China+1 种基金Project(2652012065)supported by the Fundamental Research Funds for the Central Universities,ChinaProject supported by Beijing Higher Education Young Elite Teacher Program,China
文摘The rheological behavior of phosphoric acid-water glass grout in different mixing ratios was studied. Grout made of water glass with Baume degree of 20° and 13.4% phosphoric acid by 1:1 volume ratio is found to be more effective in stopping water. Laboratory model test of water shutoff by grouting was conducted. Test results show that the diffusion length and water cutoff effect of the grout are significantly improved as the grout head is raised, due to the dilution of underground water, and it takes the grout longer than its gel time to cut off water.
基金Supported by National Natural Science Foundation of China(50174035) National Key Project of Scientific and Technical Supporting Programs(2006BAB16B00) National."973" Program(2006CB202200)
文摘The subsidence prediction theory under the condition of grouting into bedseparated was developed. Reducing ground subsidence by grouting was carried out on eight fully-mechanized top-coal caving faces, by using the continuous grouting in multiple-layer to obtain experiment results of reducing subsidence under fully mining. The similar material model that can be dismantled under the condition of constant temperature and constant humidity was developed. The model was used to simulate the evolution of overburden bed-separated under such constraints of temperature and humidity, at the same time, and to test the hardening process of similar materials.
基金funded by the Earthquake Tracking Contract Orientated Task,CEA(2011020303)Science and Technology Project of Hebei Province(13275407D)
文摘The water level rising rate of Tangshan mine well significantly accelerated in 2010,and the ascensional range was obviously higher than that of the same period in previous years.From the view of groundwater dynamics and loading effects,and based on the water pumping( pouring) water test model and semi-infinite elastic space theory model under uniform load,the effects of grouting and loading of nearby building construction on the well water level were analyzed. Results show that grouting at a distance of 200 ~ 700 m to the well,with amount of 2500m3 per day and duration of 270 d,can cause an 8 ~ 11 m rise of well water level; and loading of large-area building construction can cause about a 4m rise of well water level. Through the analysis of these factors,we find that the water level anomalous rising of Tangshan mine well was relevant to grouting and loading of the nearby building construction. This study provides a scientific basis for anomalous rising analysis of water level of Tangshan mine well.