期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
基于连通树的兵棋推演热区检测算法
1
作者 石崇林 吴琳 +2 位作者 唐宇波 张茂军 周成军 《系统工程理论与实践》 EI CSSCI CSCD 北大核心 2012年第2期323-329,共7页
提出了一种基于连通树的热区检测算法,可检测任意形状的热区,目的是通过检测兵棋推演过程中军事行动频繁的区域,为受训人员了解整个战场态势提供辅助参考.算法在明确了热区定义的基础上,首先构建连通树将数据集按连通区域进行最小划分,... 提出了一种基于连通树的热区检测算法,可检测任意形状的热区,目的是通过检测兵棋推演过程中军事行动频繁的区域,为受训人员了解整个战场态势提供辅助参考.算法在明确了热区定义的基础上,首先构建连通树将数据集按连通区域进行最小划分,再根据设定的密度阈值对连通树进行剪枝.剪枝处理后的每棵连通子树是最终的热区.理论和实验结果均验证了该算法的有效性. 展开更多
关键词 兵棋推演 连通区域 热区检测 连通树
原文传递
Event Scenario Analysis for the Design of Rockslide Countermeasures
2
作者 GIGLI Giovanni INTRIERI Emanuele +5 位作者 LOMBARDI Luca NOCENTINI Massimiliano FRODELLA William BALDUCCI Marco VENANTI Luca Domenico CASAGLI Nicola 《Journal of Mountain Science》 SCIE CSCD 2014年第6期1521-1530,共10页
The Torgiovannetto quarry(Assisi municipality,central Italy) is an example of a site where the natural equilibrium was altered by human activity,causing current slope instability phenomena which threaten two roadways ... The Torgiovannetto quarry(Assisi municipality,central Italy) is an example of a site where the natural equilibrium was altered by human activity,causing current slope instability phenomena which threaten two roadways important for the local transportation.The quarry front,having a height of about 140 m,is affected by a 182,000 m3 rockslide developed in intensely fractured limestone and is too large to be stabilized.In 2003 some tension cracks were detected in the vegetated area above the quarry upper sector.From then on,several monitoring campaigns were carried out by means of different instrumentations(topographic total station,extensometers,inclinometers,ground-based interferometric radar,laser scanner and infrared thermal camera),allowing researchers to accurately define the landslide area and volume.The latter's major displacements are localized in the eastern sector.The deformational field appears to be related to the seasonal rainfall.The landslide hazard associated with the worst case scenario was evaluated in terms of magnitude,intensity and triggering mechanism.For the definition of the possible runout process the DAN 3D code was employed.The simulation results were used in order to design and construct a retaining embankment.Furthermore,in order to preserve both the safety of the personnelinvolved in its realization and of the roadways users,an early warning system was implemented.The early warning system is based on daily-averaged displacement velocity thresholds.The alarm level is reached if the prediction based on the methods of Saito(1969) and Fukuzono(1985) forecasts an imminent rupture. 展开更多
关键词 Risk scenarios Risk management LANDSLIDES MONITORING Rock avalanche
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部