In order to solve effectively the problems of deep mining with safety and high efficiency, the multi- pie factors influencing the stability of deep rock roadway and technical problems are analyzed in the light of the ...In order to solve effectively the problems of deep mining with safety and high efficiency, the multi- pie factors influencing the stability of deep rock roadway and technical problems are analyzed in the light of the severe situation of effective mining for deep coal resource, and the stability control methods for deep rock road- way are provided, which are based on the idea of combined support with separated steps and integral control of surrounding rock of deep rock roadway. The suggested methods were applied to a deep rock roadway with -648 m depth in Gubei coal mine of Huainan area. The field test was carried out and the in-situ monitoring was imple- mented, and the support scheme was optimized and adjusted to improve the stability of the surrounding rock of the roadway based on the feedback analysis. The results showed that the stability can be improved greatly by the provided control methods tbr deep roadway. The present methods lbr stability control of deep rock roadway can be used to other deep rock roadways with the similar conditions.展开更多
基金Projects(U1910206,51874312)supported by the National Natural Science Foundation of ChinaProject(202006430014)supported by the China Scholarship Council。
文摘In order to solve effectively the problems of deep mining with safety and high efficiency, the multi- pie factors influencing the stability of deep rock roadway and technical problems are analyzed in the light of the severe situation of effective mining for deep coal resource, and the stability control methods for deep rock road- way are provided, which are based on the idea of combined support with separated steps and integral control of surrounding rock of deep rock roadway. The suggested methods were applied to a deep rock roadway with -648 m depth in Gubei coal mine of Huainan area. The field test was carried out and the in-situ monitoring was imple- mented, and the support scheme was optimized and adjusted to improve the stability of the surrounding rock of the roadway based on the feedback analysis. The results showed that the stability can be improved greatly by the provided control methods tbr deep roadway. The present methods lbr stability control of deep rock roadway can be used to other deep rock roadways with the similar conditions.