期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
如何缓解电煤紧缺“瓶颈”
1
作者 刘季江 《电业政策研究》 2005年第2期11-13,共3页
2004年电力拉闸限电,频频告急,电力供需缺口继续扩大。根据国民经济发展速度以及电源在建规模情况,电力供应紧张的状况将持续一段时间,电力行业从景气复苏已经进入到快速增长阶段。与此同时,煤炭行业开始出现恢复性的增长,煤炭价... 2004年电力拉闸限电,频频告急,电力供需缺口继续扩大。根据国民经济发展速度以及电源在建规模情况,电力供应紧张的状况将持续一段时间,电力行业从景气复苏已经进入到快速增长阶段。与此同时,煤炭行业开始出现恢复性的增长,煤炭价格将维持在高位运行,甚至有一定幅度的季节性上涨。借着国家有关部门落实电煤放开的政策和市场的需求, 展开更多
关键词 电力工业 电力企业 发电企业 电价 国民经济发展 电力供需 煤碳价格 中国
下载PDF
Assessment of CDM Activities by a Generation Planning Model of the Chinese Power Grids 被引量:1
2
作者 Akinobu Murata Eiichi Endo 《Journal of Energy and Power Engineering》 2012年第7期1022-1034,共13页
A generation planning model of six main power grids in China is developed to evaluate the potential of advanced power generation technologies into the Chinese power system as CDM (clean development mechanism). It is... A generation planning model of six main power grids in China is developed to evaluate the potential of advanced power generation technologies into the Chinese power system as CDM (clean development mechanism). It is investigated how delivered coal price, on-grid power price, and environmental protection may influence the potential of advanced thermal power generation as CDM projects. One finding from the baseline analysis is that coal price, on-grid power price, and environmental protection policy have only a small significance to the grid-wide specific CO2 emissions of thermal power generation up to the year 2026, while the best thermal generation mix is influenced largely by environmental protection policy. And it is found that not only the price of CER (certified emission reduction) and the length of crediting period but also on-grid power price and the reduction of air pollutants in the baseline have a significant influence on the potential of the CDM activities. 展开更多
关键词 Clean development mechanism generation planning model China advanced thermal power generation.
下载PDF
1987~2001国际市场煤价
3
《能源政策研究》 2002年第1期101-101,共1页
关键词 国际市场 1987~2001年 煤碳价格
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部