电气化铁路发展与牵引变供电方案研究
1
作者 马家强 《中文科技期刊数据库(全文版)工程技术》 2021年第5期58-59,共2页
对于电气化铁路来说,其具有速度快、能耗小、运量大、运费低等优势,是当前铁路行业进行发展的主要的方向,但是对于电气化铁路来说,其存在着牵引的负荷非常大的问题,而电气化铁路的供电系统的方案的选择对于地区的电网以及电力机车的平... 对于电气化铁路来说,其具有速度快、能耗小、运量大、运费低等优势,是当前铁路行业进行发展的主要的方向,但是对于电气化铁路来说,其存在着牵引的负荷非常大的问题,而电气化铁路的供电系统的方案的选择对于地区的电网以及电力机车的平稳运行有着至关重要的作用。因此就需要针对电气化铁路的牵引变供电方案进行进一步的研究和改进,促进电气化铁路的不断发展,从而给人们的生活带来更大的便利,带动我国经济的不断发展。 展开更多
关键词 电气化铁路发展 牵引变供电 方案研究
下载PDF
Time Series as an Aid to Research of Traction Substation Load
2
作者 Andrzej Kobielski Stawomir Drapik +1 位作者 Marek Dudzik Janusz Prusak 《Journal of Energy and Power Engineering》 2013年第5期979-986,共8页
In the case of electric or tram traction vehicles, the energy for propulsion purposes, as well as all other purposes, is processed and delivered via traction substations. Knowledge of the course of traction substation... In the case of electric or tram traction vehicles, the energy for propulsion purposes, as well as all other purposes, is processed and delivered via traction substations. Knowledge of the course of traction substation loading, especially at the stage of its design, is an extremely important issue because of the choice of the processing equipment of the main circuit or protection devices. In the range of investigations of railway traction substation B in vicinity of Cracow (Poland), the measurements of current load in hours 4:00 a.m.-8:00 p.m. were realized. The measurements for the analysis were chosen from those realized between 6:00 a.m.-8:00 a.m. (the morning rush time). Due to the sampling of 2 h summit with a frequency of 2 kHz, the recorded data set contains 1.44 ~ 107 elements. Therefore, the necessary transformation of data was to lower frequency 1 Hz, 10 Hz and 50 Hz. The results of the analysis presented below indicate the effect of such conduct on the obtained results for the parameters of time series models. In view of the unsatisfactory effects of the polynomial approximation, there is a need to seek a more efficient approximation method for achieving the optimum compatibility with the measured process. Continued research should lead to the formulation of procedures, which will determine an acceptable accuracy of the expected variability of traction substation loads. 展开更多
关键词 Electric traction CURRENT traction load railway traction substation time series.
下载PDF