分析了我国小干扰稳定仿真技术存在的主要问题,提出了解决问题的思路,包括:结合广域测量系统(wide area measurement system,WAMS)的小干扰稳定性分析、中长期过程中的小干扰稳定性分析、特征值的区域自动搜索算法、特征值灵敏度研究与...分析了我国小干扰稳定仿真技术存在的主要问题,提出了解决问题的思路,包括:结合广域测量系统(wide area measurement system,WAMS)的小干扰稳定性分析、中长期过程中的小干扰稳定性分析、特征值的区域自动搜索算法、特征值灵敏度研究与应用、小干扰稳定在线预决策技术等。探讨了小干扰稳定性分析软件与在线动态安全分析预警系统的接口技术,以及并行计算技术的重要性,并指出小干扰稳定性分析技术是研究和分析特高压交直流电网低频振荡问题及其稳定措施的重要手段。展开更多
Most of the hydropower projects in Southwest China and the adjacent foreign regions will be put into operation between 2015 and 2020, which will bring some difficulties for reasonable accommodation and delivery of ele...Most of the hydropower projects in Southwest China and the adjacent foreign regions will be put into operation between 2015 and 2020, which will bring some difficulties for reasonable accommodation and delivery of electric energy. In this paper the author studies the development scale, development schedule, accommodation and transmission schemes of the cascade hydropower stations along the Lancang River basin, one of the five large basins in China, based on the load characteristics of grids at both the sending end and the receiving end, the strategy of complementary utilization of thermal power and hydropower, the advanced transmission technologies, and the optimal economic performance. The study results show that, the cascade hydropower stations on the upper reaches of the Lancang River in Yunnan should mainly serve Guangdong Province, with proper planning of partly serving Yunnan Province during dry seasons. The transmission schemes should adopt UHVDC, UHVAC, and single-tower double-circuited HVDC transmission scheme according to the transmission capacity and distance.展开更多
文摘分析了我国小干扰稳定仿真技术存在的主要问题,提出了解决问题的思路,包括:结合广域测量系统(wide area measurement system,WAMS)的小干扰稳定性分析、中长期过程中的小干扰稳定性分析、特征值的区域自动搜索算法、特征值灵敏度研究与应用、小干扰稳定在线预决策技术等。探讨了小干扰稳定性分析软件与在线动态安全分析预警系统的接口技术,以及并行计算技术的重要性,并指出小干扰稳定性分析技术是研究和分析特高压交直流电网低频振荡问题及其稳定措施的重要手段。
文摘Most of the hydropower projects in Southwest China and the adjacent foreign regions will be put into operation between 2015 and 2020, which will bring some difficulties for reasonable accommodation and delivery of electric energy. In this paper the author studies the development scale, development schedule, accommodation and transmission schemes of the cascade hydropower stations along the Lancang River basin, one of the five large basins in China, based on the load characteristics of grids at both the sending end and the receiving end, the strategy of complementary utilization of thermal power and hydropower, the advanced transmission technologies, and the optimal economic performance. The study results show that, the cascade hydropower stations on the upper reaches of the Lancang River in Yunnan should mainly serve Guangdong Province, with proper planning of partly serving Yunnan Province during dry seasons. The transmission schemes should adopt UHVDC, UHVAC, and single-tower double-circuited HVDC transmission scheme according to the transmission capacity and distance.