The operation variables,including feed rate of ore slurry,caustic solution and live steams in the double-stream alumina digestion process,determine the product quality,process costs and the environment pollution.Previ...The operation variables,including feed rate of ore slurry,caustic solution and live steams in the double-stream alumina digestion process,determine the product quality,process costs and the environment pollution.Previously,they were set by the technical workers according to the offline analysis results and an empirical formula,which leads to unstable process indices and high consumption frequently.So,a multi-objective optimization model is built to maintain the balance between resource consumptions and process indices by taking technical indices and energy efficiency as objectives,where the key technical indices are predicted based on the digestion kinetics of diaspore.A multi-objective state transition algorithm(MOSTA)is improved to solve the problem,in which a self-adaptive strategy is applied to dynamically adjust the operator factors of the MOSTA and dynamic infeasible threshold is used to handle constraints to enhance searching efficiency and ability of the algorithm.Then a rule based strategy is designed to make the final decision from the Pareto frontiers.The method is integrated into an optimal control system for the industrial digestion process and tested in the actual production.Results show that the proposed method can achieve the technical target while reducing the energy consumption.展开更多
Generation of wind power time series is an important foundational task for assisting electric power system planning and mak- ing decision. By analyzing the characteristics of wind power persistence and variation, th!....Generation of wind power time series is an important foundational task for assisting electric power system planning and mak- ing decision. By analyzing the characteristics of wind power persistence and variation, th!.s paper proposes an improved Mar- kov chain Monte Carlo (MCMC) method, identified as the PV-MC method, for the direct generation of a synthetic series of wind power output. On the basis of the MCMC method, duration time and variation features are concluded in PV-MC method, gaining a more comprehensive reflection of wind power characteristics in the generated wind power time series. First, the wind power state series is generated to meet the state transition matrix based on the definition of the wind power state. Then, the time duration of each state in the series is determined by its respective duration character. Finally, the variation characteristic is used to convert the state series to a wind power time series. A significant amount of simulations are performed based on the PV-MC and MCMC methods and are then compared for 25 wind farms at 6 different locations throughout the world. The sim- ulation results show that the PV-MC method offers an excellent fit for the time domain features (persistence and variation characteristic) while holding other statistic features (mean value, variance, autocorrelation coefficient (ACC) and probability density function (PDF)) close to the MCMC method.展开更多
On the basic of a type of practical examples we set up a new queueing model with negative customers. By the use of “Supplemental Variables method” and “State transfer analysis”, we get the generating function wit...On the basic of a type of practical examples we set up a new queueing model with negative customers. By the use of “Supplemental Variables method” and “State transfer analysis”, we get the generating function with negative powers of queue length and the waiting time expressions.展开更多
Scheduling is a major concern in construction planning and management, and current construction simulation research typically targets the shortest total duration. However, uncertainties are inevitable in actual constr...Scheduling is a major concern in construction planning and management, and current construction simulation research typically targets the shortest total duration. However, uncertainties are inevitable in actual construction, which may lead to discrepancies between the actual and planned schedules and increase the risk of total duration delay. Therefore, developing a robust construction scheduling technique is of vital importance for mitigating disturbance and improving completion probability. In the present study, the authors propose a robustness analysis method that involves underground powerhouse construction simulation based on the Markov Chain Monte Carlo(MCMC) method. Specifically, the MCMC method samples construction disturbances by considering the interrelationship between the states of parameters through a Markov state transition probability matrix, which is more robust and efficient than traditional sampling methods such as the Monte Carlo(MC) method. Additionally, a hierarchical simulation model coupling critical path method(CPM) and a cycle operation network(CYCLONE) is built, using which construction duration and robustness criteria can be calculated. Furthermore, a detailed measurement method is presented to quantize the robustness of underground powerhouse construction, and the setting model of the time buffer is proposed based on the MCMC method. The application of this methodology not only considers duration but also robustness, providing scientific guidance for engineering decision making. We analyzed a case study project to demonstrate the effectiveness and superiority of the proposed methodology.展开更多
基金Project(62073342)supported by the National Natural Science Foundation of ChinaProject(2014 AA 041803)supported by the Hi-tech Research and Development Program of China。
文摘The operation variables,including feed rate of ore slurry,caustic solution and live steams in the double-stream alumina digestion process,determine the product quality,process costs and the environment pollution.Previously,they were set by the technical workers according to the offline analysis results and an empirical formula,which leads to unstable process indices and high consumption frequently.So,a multi-objective optimization model is built to maintain the balance between resource consumptions and process indices by taking technical indices and energy efficiency as objectives,where the key technical indices are predicted based on the digestion kinetics of diaspore.A multi-objective state transition algorithm(MOSTA)is improved to solve the problem,in which a self-adaptive strategy is applied to dynamically adjust the operator factors of the MOSTA and dynamic infeasible threshold is used to handle constraints to enhance searching efficiency and ability of the algorithm.Then a rule based strategy is designed to make the final decision from the Pareto frontiers.The method is integrated into an optimal control system for the industrial digestion process and tested in the actual production.Results show that the proposed method can achieve the technical target while reducing the energy consumption.
基金supported by the National Natural Science Foundation of China(Grant No.51377027)the National Basic Research Program of China("973"Project)(Grant No.2012CB215104)ABB(China)Ltd
文摘Generation of wind power time series is an important foundational task for assisting electric power system planning and mak- ing decision. By analyzing the characteristics of wind power persistence and variation, th!.s paper proposes an improved Mar- kov chain Monte Carlo (MCMC) method, identified as the PV-MC method, for the direct generation of a synthetic series of wind power output. On the basis of the MCMC method, duration time and variation features are concluded in PV-MC method, gaining a more comprehensive reflection of wind power characteristics in the generated wind power time series. First, the wind power state series is generated to meet the state transition matrix based on the definition of the wind power state. Then, the time duration of each state in the series is determined by its respective duration character. Finally, the variation characteristic is used to convert the state series to a wind power time series. A significant amount of simulations are performed based on the PV-MC and MCMC methods and are then compared for 25 wind farms at 6 different locations throughout the world. The sim- ulation results show that the PV-MC method offers an excellent fit for the time domain features (persistence and variation characteristic) while holding other statistic features (mean value, variance, autocorrelation coefficient (ACC) and probability density function (PDF)) close to the MCMC method.
基金This research is supported by the the Scientific Foundation of Jiangsu Province (BK97047) and the Foundation of Jiangsu Education bureau (00KJT11003)
文摘On the basic of a type of practical examples we set up a new queueing model with negative customers. By the use of “Supplemental Variables method” and “State transfer analysis”, we get the generating function with negative powers of queue length and the waiting time expressions.
基金supported by the Innovative Research Groups of the National Natural Science Foundation of China(Grant No.51321065)the National Natural Science Foundation of China(Grant Nos.9121530151439005)
文摘Scheduling is a major concern in construction planning and management, and current construction simulation research typically targets the shortest total duration. However, uncertainties are inevitable in actual construction, which may lead to discrepancies between the actual and planned schedules and increase the risk of total duration delay. Therefore, developing a robust construction scheduling technique is of vital importance for mitigating disturbance and improving completion probability. In the present study, the authors propose a robustness analysis method that involves underground powerhouse construction simulation based on the Markov Chain Monte Carlo(MCMC) method. Specifically, the MCMC method samples construction disturbances by considering the interrelationship between the states of parameters through a Markov state transition probability matrix, which is more robust and efficient than traditional sampling methods such as the Monte Carlo(MC) method. Additionally, a hierarchical simulation model coupling critical path method(CPM) and a cycle operation network(CYCLONE) is built, using which construction duration and robustness criteria can be calculated. Furthermore, a detailed measurement method is presented to quantize the robustness of underground powerhouse construction, and the setting model of the time buffer is proposed based on the MCMC method. The application of this methodology not only considers duration but also robustness, providing scientific guidance for engineering decision making. We analyzed a case study project to demonstrate the effectiveness and superiority of the proposed methodology.