TH703 2005064469 Φ1 m平面镜的力学分析及实验研究=Mechanical analysis and experimental study of the Φ1 m flat mirror[刊,中]/郭 永卫(中科院国家天文台.北京(100012)),杨世模…∥光 学技术.-2005,31(4).-618-621 空间太阳...TH703 2005064469 Φ1 m平面镜的力学分析及实验研究=Mechanical analysis and experimental study of the Φ1 m flat mirror[刊,中]/郭 永卫(中科院国家天文台.北京(100012)),杨世模…∥光 学技术.-2005,31(4).-618-621 空间太阳望远镜(SST)的装校需要一个倒置的直径为 1 m的平面镜。展开更多
In the dynamic, complex and unbounded Grid systems, failures of Grid resources caused by malicious attacks and hardware failures are inevitable and have an adverse effect on the execution of tasks. To mitigate this pr...In the dynamic, complex and unbounded Grid systems, failures of Grid resources caused by malicious attacks and hardware failures are inevitable and have an adverse effect on the execution of tasks. To mitigate this problem, a makespan and reliability driven (MRD) sufferage scheduling algorithm is designed and implemented. Different from the traditional Grid scheduling algorithms, the algorithm addresses the makespan as well as reliability of tasks. The simulation experimental results show that the MRD sufferage scheduling algorithm can increase reliability of tasks and can trade off reliability against makespan of tasks by adjusting the weighting parameter in its cost function. So it can be applied to the complex Grid computing environment well.展开更多
文摘TH703 2005064469 Φ1 m平面镜的力学分析及实验研究=Mechanical analysis and experimental study of the Φ1 m flat mirror[刊,中]/郭 永卫(中科院国家天文台.北京(100012)),杨世模…∥光 学技术.-2005,31(4).-618-621 空间太阳望远镜(SST)的装校需要一个倒置的直径为 1 m的平面镜。
文摘In the dynamic, complex and unbounded Grid systems, failures of Grid resources caused by malicious attacks and hardware failures are inevitable and have an adverse effect on the execution of tasks. To mitigate this problem, a makespan and reliability driven (MRD) sufferage scheduling algorithm is designed and implemented. Different from the traditional Grid scheduling algorithms, the algorithm addresses the makespan as well as reliability of tasks. The simulation experimental results show that the MRD sufferage scheduling algorithm can increase reliability of tasks and can trade off reliability against makespan of tasks by adjusting the weighting parameter in its cost function. So it can be applied to the complex Grid computing environment well.