本文研究的目的:如何保证中国企业在中东国家保质、保量的完成海洋工程施工任务。本文研究方法:通过对阿曼海洋工程施工难点进行列举,其中包括:包括陌生的人文环境和深不可测的海洋气候、巨大工程量、地质坚硬、缺少分包商资源的情况下...本文研究的目的:如何保证中国企业在中东国家保质、保量的完成海洋工程施工任务。本文研究方法:通过对阿曼海洋工程施工难点进行列举,其中包括:包括陌生的人文环境和深不可测的海洋气候、巨大工程量、地质坚硬、缺少分包商资源的情况下,并分析了各种施工难点的解决方案及方法。最终结论:优化施工及设计方案对海外海洋工程施工进度推进至关重要。阿曼项目介绍:本项目为独立海水淡化+燃气电厂项目。保证合同电输出Guaranteed Contracted Power Capacity(GCPC)为430 MW的电厂,与保证合同水量Guaranteed Contracted Water Capacity(GCWC)为2841 m2/h的水厂。此项目厂址位于【the Wilayat of Mirbat,Salalah】以北25 km处,Mirbat河以南;厂址靠近海。展开更多
An improved topographic database for King George Island,one of the most frequently visited regions in Antarctica,is presented.A first step consisted in combining data from differential GPS surveys gained during the au...An improved topographic database for King George Island,one of the most frequently visited regions in Antarctica,is presented.A first step consisted in combining data from differential GPS surveys gained during the austral summers 1997~1998 and 1999~2000,with the current coastline from a SPOT satellite image mosaic,topographic information from existing maps and from the Antarctic Digital Database.From this data sets,a digital terrain model (DTM) was generated using Arc/Info GIS.In a second step,a satellite image map at the scale 1∶100 000 was assembled from contour lines derived from the DTM and the satellite mosaic.A lack of accurate topographic information in the eastern part of the island was identified.Additional topographic surveying or SAR interferometry should be used to improve the data quality in that area.The GIS integrated database will be indispensable for glaciological and climatological studies and administrative and scientific purposes.In future,the application of GIS techniques will be mandatory for environmental impact studies and environmental monitoring as well as for management plans on King George Island.展开更多
文摘本文研究的目的:如何保证中国企业在中东国家保质、保量的完成海洋工程施工任务。本文研究方法:通过对阿曼海洋工程施工难点进行列举,其中包括:包括陌生的人文环境和深不可测的海洋气候、巨大工程量、地质坚硬、缺少分包商资源的情况下,并分析了各种施工难点的解决方案及方法。最终结论:优化施工及设计方案对海外海洋工程施工进度推进至关重要。阿曼项目介绍:本项目为独立海水淡化+燃气电厂项目。保证合同电输出Guaranteed Contracted Power Capacity(GCPC)为430 MW的电厂,与保证合同水量Guaranteed Contracted Water Capacity(GCWC)为2841 m2/h的水厂。此项目厂址位于【the Wilayat of Mirbat,Salalah】以北25 km处,Mirbat河以南;厂址靠近海。
文摘An improved topographic database for King George Island,one of the most frequently visited regions in Antarctica,is presented.A first step consisted in combining data from differential GPS surveys gained during the austral summers 1997~1998 and 1999~2000,with the current coastline from a SPOT satellite image mosaic,topographic information from existing maps and from the Antarctic Digital Database.From this data sets,a digital terrain model (DTM) was generated using Arc/Info GIS.In a second step,a satellite image map at the scale 1∶100 000 was assembled from contour lines derived from the DTM and the satellite mosaic.A lack of accurate topographic information in the eastern part of the island was identified.Additional topographic surveying or SAR interferometry should be used to improve the data quality in that area.The GIS integrated database will be indispensable for glaciological and climatological studies and administrative and scientific purposes.In future,the application of GIS techniques will be mandatory for environmental impact studies and environmental monitoring as well as for management plans on King George Island.