It is difficult to maintain the roadway around a fault because of the fractured surroundings, complex stress environment, and large and intense deformation in the mining process. Based on a tailgate of panel $2205 in ...It is difficult to maintain the roadway around a fault because of the fractured surroundings, complex stress environment, and large and intense deformation in the mining process. Based on a tailgate of panel $2205 in Tunliu colliery, in Shanxi province, China, we investigated the evolution of stress and displace- ment of rocks surrounding the roadway during the drivage and mining period using theoretical analysis, numerical simulation and field trial methods. We analyzed the deformation and failure mechanisms of the tailgate near a fault. The deformation of surrounding rock caused by unloading in the drivage period is large and asymmetric, the roadway convergence increases with activation of the fault and secondary fracture develops in the mining period. Therefore, we proposed a specific control technique of the road- way along a fault as follows: (1) High-strength yielding bolt not only supports the shallow rock to load- bearing structures, but also releases primary deformation energy by use of a pressure release device in order to achieve high resistance to the pressure retained: (2) Grouting of near-fault ribside after initial stabilization of the rock deformation is used to reinforce the broken rock, and to improve the integral load-bearing capacity ol~ the roadway. The research results were successfully applied to a field trial.展开更多
Based on the impact of the stress perturbation effect created by simultaneous propagation of multiple fractures in the process of simultaneous hydraulic fracturing, a thorough research on the mechanism and adaptation ...Based on the impact of the stress perturbation effect created by simultaneous propagation of multiple fractures in the process of simultaneous hydraulic fracturing, a thorough research on the mechanism and adaptation of simultaneous fracturing of double horizontal wells in ultra-low permeability sandstone reservoirs was conducted by taking two adjacent horizontal wells(well Yangping-1 and well Yangping-2 located in Longdong area of China Changqing Oilfield) as field test wells. And simultaneous fracturing optimal design of two adjacent horizontal wells was finished and employed in field test. Micro-seismic monitoring analysis of fracture propagation during the stimulation treatment shows that hydraulic fractures present a pattern of complicated network expansion, and the well test data after fracturing show that the daily production of well Yangping-1 and well Yangping-2 reach105.8 t/d and 87.6 t/d, which are approximately 9.4 times and 7.8 times the daily production of a fractured vertical well in the same area, respectively. Field test reflects that simultaneous hydraulic fracturing of two adjacent horizontal wells can enlarge the expansion area of hydraulic fractures to obtain a lager drainage area and realize the full stimulation of ultra-low permeability sandstone reservoirs in China Changqing oilfield. Therefore, simultaneous fracturing of two adjacent horizontal wells provides a good opportunity in stimulation techniques for the efficient development of ultra-low permeability reservoirs in China Changqing oilfield,and it has great popularization value and can provide a new avenue for the application of stimulation techniques in ultra-low permeability reservoirs in China.展开更多
基金provided by the National Natural Science Foundation of China (No. 51174195)the State Key Laboratory of Coal Resources and Mine Safety(No. SKLCRSM08X04)+1 种基金the Science Foundation for Youth of China University of Mining &Technology (No. 2008A02)supported by China Scholarship Council for High-Level University Program (No.CSC[2010] 3006)
文摘It is difficult to maintain the roadway around a fault because of the fractured surroundings, complex stress environment, and large and intense deformation in the mining process. Based on a tailgate of panel $2205 in Tunliu colliery, in Shanxi province, China, we investigated the evolution of stress and displace- ment of rocks surrounding the roadway during the drivage and mining period using theoretical analysis, numerical simulation and field trial methods. We analyzed the deformation and failure mechanisms of the tailgate near a fault. The deformation of surrounding rock caused by unloading in the drivage period is large and asymmetric, the roadway convergence increases with activation of the fault and secondary fracture develops in the mining period. Therefore, we proposed a specific control technique of the road- way along a fault as follows: (1) High-strength yielding bolt not only supports the shallow rock to load- bearing structures, but also releases primary deformation energy by use of a pressure release device in order to achieve high resistance to the pressure retained: (2) Grouting of near-fault ribside after initial stabilization of the rock deformation is used to reinforce the broken rock, and to improve the integral load-bearing capacity ol~ the roadway. The research results were successfully applied to a field trial.
基金Project(51404204)supported by the National Natural Science Foundation of ChinaProject(20135121120002)supported by Specialized Research Fund for the Doctoral Program of Higher Education of ChinaProject(2014QHZ005)supported by Scientific Research Starting Projecting of SWPU,China
文摘Based on the impact of the stress perturbation effect created by simultaneous propagation of multiple fractures in the process of simultaneous hydraulic fracturing, a thorough research on the mechanism and adaptation of simultaneous fracturing of double horizontal wells in ultra-low permeability sandstone reservoirs was conducted by taking two adjacent horizontal wells(well Yangping-1 and well Yangping-2 located in Longdong area of China Changqing Oilfield) as field test wells. And simultaneous fracturing optimal design of two adjacent horizontal wells was finished and employed in field test. Micro-seismic monitoring analysis of fracture propagation during the stimulation treatment shows that hydraulic fractures present a pattern of complicated network expansion, and the well test data after fracturing show that the daily production of well Yangping-1 and well Yangping-2 reach105.8 t/d and 87.6 t/d, which are approximately 9.4 times and 7.8 times the daily production of a fractured vertical well in the same area, respectively. Field test reflects that simultaneous hydraulic fracturing of two adjacent horizontal wells can enlarge the expansion area of hydraulic fractures to obtain a lager drainage area and realize the full stimulation of ultra-low permeability sandstone reservoirs in China Changqing oilfield. Therefore, simultaneous fracturing of two adjacent horizontal wells provides a good opportunity in stimulation techniques for the efficient development of ultra-low permeability reservoirs in China Changqing oilfield,and it has great popularization value and can provide a new avenue for the application of stimulation techniques in ultra-low permeability reservoirs in China.