期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
现浇混凝土桥面裂缝成因及监理控制研究
1
作者 方芳 《科学中国人》 2016年第5Z期25-,共1页
通常,现浇混凝土桥面干缩裂缝一个重要因素是由于蒸发引起水分的变化,这种蒸发干燥过程总是由表及里逐渐深入,由于水分和湿度的变化不均匀,所以引起的干缩变形也不均匀。因此,在现浇混凝土桥面施工中,了解干缩裂缝产生的原因,采取有效... 通常,现浇混凝土桥面干缩裂缝一个重要因素是由于蒸发引起水分的变化,这种蒸发干燥过程总是由表及里逐渐深入,由于水分和湿度的变化不均匀,所以引起的干缩变形也不均匀。因此,在现浇混凝土桥面施工中,了解干缩裂缝产生的原因,采取有效的监理控制措施,才能避免裂缝的出现。 展开更多
关键词 现浇混凝土桥面 桥梁 裂缝 监理
下载PDF
结合梁桥的混凝土桥面板设计 被引量:11
2
作者 杜亚凡 《国外桥梁》 1998年第2期39-41,共3页
介绍结合梁桥中几种常用的混凝土桥面板即现浇、预制,预制后张预应力,预制预应力混凝土桥面板的基本设计原则及其优缺点。
关键词 结合梁桥 桥面 设计标准 现浇混凝土桥面 预制
下载PDF
Bridge Falsework in Staged Construction of a Prestressed Concrete Beam Bridge
3
作者 Janusz Hotowaty Dariusz Jurkowski 《Journal of Civil Engineering and Architecture》 2015年第12期1432-1438,共7页
The formwork and falsework in the construction of twin ribbed slab decks on a multi-span ecological bridge for a dual carriageway are presented. The bridge is situated in a valley plain which is crossed by small river... The formwork and falsework in the construction of twin ribbed slab decks on a multi-span ecological bridge for a dual carriageway are presented. The bridge is situated in a valley plain which is crossed by small rivers and was designed principally with the environment in mind. The bridge length is over 356 m, and the width of the decks is 11.5 m. For the bridge works, a simple conventional falsework system was chosen with steel frames for the supports and steel rolled beams for the decks. The formwork was constructed in solid timber and plywood as multiple-use panels. The falsework was designed in order to build the two 10-span bridge decks in stages. The decks are continuous cast-in-situ prestressed concrete twin rib with spans of 30 m, 34 m and 45 m. An individual falsework system was designed, which was easy to move transversally following completion of each stage for one deck. After finishing each stage, for the second deck, the falsework was dismantled and used again in the next construction fronts. An individual arrangement for the falsework along with timber pilings was used to cross the biggest river. The formwork timber panels were used several times in the multistage bridge construction. The adopted falsework system is very simple, but it allowed the speedy construction of the two decks where there were severe time constraints. 展开更多
关键词 Prestress concrete bridge continuous bridge twin rib deck span-by-span construction FORMWORK falsework.
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部