期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
大口径瓦斯抽排放管道井施工技术总结
1
作者 韩金 《中国新技术新产品》 2017年第16期90-91,共2页
本文结合黄陵二号矿大口径瓦斯抽排放井的施工实例,总结出大口径瓦斯抽排放井的施工技术:先进行小口径先导孔施工,再进行分级扩孔施工。在进行导向孔施工时采用轻压吊打防斜,陀螺仪测斜或使用无线随钻定向仪器,螺杆钻具定向纠斜,确保钻... 本文结合黄陵二号矿大口径瓦斯抽排放井的施工实例,总结出大口径瓦斯抽排放井的施工技术:先进行小口径先导孔施工,再进行分级扩孔施工。在进行导向孔施工时采用轻压吊打防斜,陀螺仪测斜或使用无线随钻定向仪器,螺杆钻具定向纠斜,确保钻孔控制在规定靶区以内;下套管前在套管端部下下20cm处割大下约45cm的圆孔,用于孔穿杠钢管提吊,在套管底部加工浮力板,用于增加管体浮力。 展开更多
关键词 瓦斯抽排放孔 先导垂直度 泥浆选用 套管安装
下载PDF
Patterns and security technologies for co-extraction of coal and gas in deep mines without entry pillars 被引量:5
2
作者 Nong Zhang Fei Xue Nianchao Zhang Xiaowei Feng 《International Journal of Coal Science & Technology》 EI 2015年第1期66-75,共10页
Retaining gob-side entryways and the stability of gas drainage boreholes are two essential techniques in the co-extraction of coal and gas without entry pillars (CECGWEP). However, retained entryways located in deep... Retaining gob-side entryways and the stability of gas drainage boreholes are two essential techniques in the co-extraction of coal and gas without entry pillars (CECGWEP). However, retained entryways located in deep coal mines are hard to maintain, especially for constructing boreholes in confined spaces, owing to major deformations. Consequently, it is difficult to drill boreholes and maintain their stability, which therefore cannot guarantee the effectiveness of gas drainage. This paper presents three measures for conducting CECGWEP in deep mines on the basis of effective space in retained entryways for gas drainage, They are combinations of retaining roadways and face-lagging inclined boreholes, retaining roadways and face-advancing inclined boreholes, and retaining roadways and high return airway inclined boreholes. Several essential techniques are suggested to improve the maintenance of retained entryways and the stabilization of boreholes. For the particular cases considered in this study, two field trials have verified the latter two measures from the results obtained from the faces 1111(1) and 11112(1) in the Zhuji Mine. The results indicate that these models can effectively solve the problems in deep mines. The maximum gas drainage flow for a single hole can reach 8.1 m^3/min and the effective drainage distance can be extended up to 150 m or more. 展开更多
关键词 Retaining gob-side entryways Stability of borehole Gas pressure relief Co-extraction of coal and gas without the entry pillar
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部