The working conditions of the MK-3 type full hydraulic tunnel drilling machine during the course of drilling were analyzed. Based on the energy balance governing equations for the drill rod, the temperature field of d...The working conditions of the MK-3 type full hydraulic tunnel drilling machine during the course of drilling were analyzed. Based on the energy balance governing equations for the drill rod, the temperature field of drill rod at the normal and non-normal working conditions was numerically obtained. The numerical results show that the maximum temperature at the head of drill rod under the normal working circumstance is insufficient to ignite the gas. But under the non-normal working condition, the local high temperature can ignite the gas easily and cause the fire. In order to prevent the gas fire, the occurrence of the non-normal operating condition must be prevented as far as possible during the drilling.展开更多
Based on the technologies of traditionally mechanical drilling and water jet,we propose a new method of abrasive water jet in combination with rock drilling,and establish a combined rock drilling system for the gas pr...Based on the technologies of traditionally mechanical drilling and water jet,we propose a new method of abrasive water jet in combination with rock drilling,and establish a combined rock drilling system for the gas pre-drainage.This study chose the common sandstone and silicon limestone as the rock sample.A series of experiments were completed in the case of dry drilling,existing technology drilling,combined drilling with high pressure water jet and combined drilling with abrasive water jet,respectively.The drilling efficiency and performance were contrasted and analyzed in detail.The results indicate that it is better to choose the method of combined drilling with the high-pressure water jet for soft rocks.The method of combined drilling with abrasive water jet is feasible for the hard rock drilling and has higher drilling efficiency and performance.In this paper,compared with the existing technology,the drilling depth has increased by about 65%,the axial force and torque have reduced by about 14%and 17%,respectively,and the drill wear reduces obviously in the same conditions.展开更多
基金Supported by the "863" Program(2003AA131100-02-06)the National Natural Science Foundation of China(50274061)
文摘The working conditions of the MK-3 type full hydraulic tunnel drilling machine during the course of drilling were analyzed. Based on the energy balance governing equations for the drill rod, the temperature field of drill rod at the normal and non-normal working conditions was numerically obtained. The numerical results show that the maximum temperature at the head of drill rod under the normal working circumstance is insufficient to ignite the gas. But under the non-normal working condition, the local high temperature can ignite the gas easily and cause the fire. In order to prevent the gas fire, the occurrence of the non-normal operating condition must be prevented as far as possible during the drilling.
基金supported by the Fundamental Research Funds for the Central University (Nos.CDJZR10248801,CDJZR122488 01)the National Natural Science Foundation of China (No.51104191)
文摘Based on the technologies of traditionally mechanical drilling and water jet,we propose a new method of abrasive water jet in combination with rock drilling,and establish a combined rock drilling system for the gas pre-drainage.This study chose the common sandstone and silicon limestone as the rock sample.A series of experiments were completed in the case of dry drilling,existing technology drilling,combined drilling with high pressure water jet and combined drilling with abrasive water jet,respectively.The drilling efficiency and performance were contrasted and analyzed in detail.The results indicate that it is better to choose the method of combined drilling with the high-pressure water jet for soft rocks.The method of combined drilling with abrasive water jet is feasible for the hard rock drilling and has higher drilling efficiency and performance.In this paper,compared with the existing technology,the drilling depth has increased by about 65%,the axial force and torque have reduced by about 14%and 17%,respectively,and the drill wear reduces obviously in the same conditions.