期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
BC高浓度活性污泥法小型污水处理装置运行试验 被引量:4
1
作者 周克钊 周敉 +1 位作者 岳全辉 王超 《给水排水》 CSCD 北大核心 2020年第S01期485-487,492,共4页
BC高浓度活性污泥法的小型污水处理装置,成功实现了高浓度活性污泥法的生产性运行,为高浓度活性污泥的推广应用,打开了广阔的前景。结果表明,在生化停留时间为11h时,出水总氮低于10mg/L,碳源不足也无须补充,可以稳定维持高浓度活性污泥... BC高浓度活性污泥法的小型污水处理装置,成功实现了高浓度活性污泥法的生产性运行,为高浓度活性污泥的推广应用,打开了广阔的前景。结果表明,在生化停留时间为11h时,出水总氮低于10mg/L,碳源不足也无须补充,可以稳定维持高浓度活性污泥,运行成本较低,工程总投资较低。 展开更多
关键词 BC高浓度活污泥法 生物处理 化学处理 小型污水处理装置 生产性运行
下载PDF
Fundamental behaviours of production traffic in underground mine haulage ramps 被引量:4
2
作者 Haviland David Marshall Joshua 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2015年第1期7-14,共8页
Ramps(or declines) are often used in underground mines to transport ore, waste, materials, and personnel. This paper studies mine ramp productivity and presents results from a set of computer simulations designed to m... Ramps(or declines) are often used in underground mines to transport ore, waste, materials, and personnel. This paper studies mine ramp productivity and presents results from a set of computer simulations designed to model the fundamental behaviours of ramp haulage systems. Simulations show that, under fundamental assumptions without random disturbances, the haulage system always converges to a periodic behaviour in the steady state, but that productivities vary between equilibria. Simulations also demonstrate how productivity per vehicle does not necessarily decrease as more vehicles are added and,for example, in the five-vehicle case, how a 3.1% improvement can be achieved over the use of four vehicles. The result reveals the inefficiency of commonly-used lockout-style vehicle coordination strategies,and suggests a possible avenue for improving the productivity of haulage ramps by controlling the system to achieve more productive behaviours. 展开更多
关键词 Underground miningFleet managementDiscrete-time simulationVehicle dispatching
下载PDF
State of the art for dry tree semi technologies 被引量:1
3
作者 Yu Hao Chen Yongjun Cui Yujun 《Engineering Sciences》 EI 2013年第4期92-96,共5页
Dry tree semi is a fast developing technology and becomes more and more appealing to the operators as a solution for producing deepwater reserves. Utilizing a dry tree semi means spending less cost on well mainte-nanc... Dry tree semi is a fast developing technology and becomes more and more appealing to the operators as a solution for producing deepwater reserves. Utilizing a dry tree semi means spending less cost on well mainte-nance and interventions,while the production platform can be integrated and commissioned at quayside. This paper presents a comprehensive overview of various technologies for dry tree semi,such as E-semi,T-semi,paired-column semi and long stroke tensioners. Each dry tree semi concept is briefed in terms of global performance,top tension riser (TTR) tensioner system,quayside integration and feasibility to environment. 展开更多
关键词 dry tree semi heave plate TTR response amplitude operator (RAO) quayside integration
下载PDF
Sensitivity analysis on parameter changes in underground mine ventilation systems 被引量:4
4
作者 LI Gary KOCSIS Charles HARDCASTLE Steve 《Journal of Coal Science & Engineering(China)》 2011年第3期251-255,共5页
A more efficient mine ventilation system, the ventilation-on-demand (VOD) system, has been proposed and tested in Canadian mines recently. In order to supply the required air volumes to the production areas of a min... A more efficient mine ventilation system, the ventilation-on-demand (VOD) system, has been proposed and tested in Canadian mines recently. In order to supply the required air volumes to the production areas of a mine, operators need to know the cause and effect of any changes requested from the VOD system. The sensitivity analysis is developed through generating a cause and effect matrix of sensitivity factors on given parameter changes in a ventilation system. This new utility, which was incorporated in the 3D-CANVENT mine ventilation simulator, is able to predict the airflow distributions in a ventilation network when underground conditions and ventilation controls are changed. For a primary ventilation system, the software can determine the optimal operating speed of the main fans to satisfy the airflow requirements in underground workings without necessarily using booster fans and regulators locally. An optimized fan operating speed time-table would assure variable demand-based fresh air delivery to the production areas effectively, while generating significant savings in energy consumption and operating cost. 展开更多
关键词 sensitivity factors ventilation system AIRFLOW branch resistance fixed quantity fan speed
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部