An integrated system for assembly planning and design (INSAPS) is presented in which product data can be exchanged between assembly planning and assembly design on the basis of standard for exchange of product data mo...An integrated system for assembly planning and design (INSAPS) is presented in which product data can be exchanged between assembly planning and assembly design on the basis of standard for exchange of product data model (STEP). The system consists of CAD system, product modeling system, assembly planning system. The product model is organized according to the STEP, uses mostly the entities of IR (integrated resources) and partly self defined entities which is necessary for assembly planning. A simple method of assembly sequence generation is presented which is suitable for complex assembly planning. The generated assembly sequences are evaluated considering the optimization of total assembly time. The results of assembly planning are feedback to the stage of assembly design to improve design.展开更多
The complexity of an open pit production scheduling problem is increased by grade uncertainty. A method is presented to calculate the cost of uncertainty in a production schedule based on deviations from the target pr...The complexity of an open pit production scheduling problem is increased by grade uncertainty. A method is presented to calculate the cost of uncertainty in a production schedule based on deviations from the target production. A mixed integer linear programming algorithm is formulated to find the min- ing sequence of blocks from a predefined pit shell and their respective destinations, with two objectives: to maximize the net present value of the operation and to minimize the cost of uncertainty. An efficient clustering technique reduces the number of var/ables to make the problem tractable. Also, the parameters that control the importance of uncertainty in the optimization problem are studied. The minimum annual mining capacity in presence of grade uncertainty is assessed. The method is illustrated with an oil sand deposit in northern Alberta.展开更多
文摘An integrated system for assembly planning and design (INSAPS) is presented in which product data can be exchanged between assembly planning and assembly design on the basis of standard for exchange of product data model (STEP). The system consists of CAD system, product modeling system, assembly planning system. The product model is organized according to the STEP, uses mostly the entities of IR (integrated resources) and partly self defined entities which is necessary for assembly planning. A simple method of assembly sequence generation is presented which is suitable for complex assembly planning. The generated assembly sequences are evaluated considering the optimization of total assembly time. The results of assembly planning are feedback to the stage of assembly design to improve design.
文摘The complexity of an open pit production scheduling problem is increased by grade uncertainty. A method is presented to calculate the cost of uncertainty in a production schedule based on deviations from the target production. A mixed integer linear programming algorithm is formulated to find the min- ing sequence of blocks from a predefined pit shell and their respective destinations, with two objectives: to maximize the net present value of the operation and to minimize the cost of uncertainty. An efficient clustering technique reduces the number of var/ables to make the problem tractable. Also, the parameters that control the importance of uncertainty in the optimization problem are studied. The minimum annual mining capacity in presence of grade uncertainty is assessed. The method is illustrated with an oil sand deposit in northern Alberta.