期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
基于生态共同体视角的东北地区生态协同共建关系研究 被引量:1
1
作者 赵欣 谷国锋 《税务与经济》 CSSCI 北大核心 2023年第1期71-78,共8页
按照生态投入与生态消耗来确定东北地区生态协同共建关系的逻辑,发现东北地区各地级市的生态消耗率在空间上形成了“中轴线高、两翼低,北部高、南部低”的格局。将生态消耗率转换成生态贡献指数,确定东北地区各地级市的生态协同共建关... 按照生态投入与生态消耗来确定东北地区生态协同共建关系的逻辑,发现东北地区各地级市的生态消耗率在空间上形成了“中轴线高、两翼低,北部高、南部低”的格局。将生态消耗率转换成生态贡献指数,确定东北地区各地级市的生态协同共建关系是以中轴线为界,生态受偿区主要位于东北地区的东部,而西部大部分地级市都为生态补偿区,并且生态补偿区和生态受偿区都呈集中连片分布的状态,整体上形成了“西部受偿,东部补偿”的关系格局。因此,东北地区应加强区域合作,平衡长短期利益,使区域间激励相容,形成生态补偿的长效机制,协同共建东北地区生态共同体,从而实现生态协同共建共享。 展开更多
关键词 生态消耗率 生态协同共建关系 生态共同体 东北地区
原文传递
An Assessment of Eco Driving System for Agricultural Tractor
2
作者 S. H. Park Y. J. Kim D. H. Im C. K. Kim 《Journal of Agricultural Science and Technology(B)》 2011年第6期906-912,共7页
In this study, tractor power output, fuel consumption rate and work performance were indirectly predicted in order to develop an eco driving system. Firstly, equations were developed which could foretell tractor power... In this study, tractor power output, fuel consumption rate and work performance were indirectly predicted in order to develop an eco driving system. Firstly, equations were developed which could foretell tractor power output and fuel consumption rate using characteristic curves of tractor power output. Secondly, with actual engine revolution per minute (rpm) determined by initial engine rpm and work load, tractor power output and fuel consumption rate were forecasted. Thirdly, it was possible to foresee tractor work performance and fuel consumption rate by the speed signals of Global Positioning System (GPS). Lastly, precision of the eco driving system was evaluated through tractor Power Take-Off (PTO) test, and effects of the eco driving system were investigated in the plowing and rotary tilling operations. Engine rpm, power output, fuel consumption rate, work performance and fuel consumption rate per plot area were displayed on the eco driving system. Predicted tractor power outputs in the full load curve were well coincided with the actual power output of prototype, but small differences, 1 to 6 kW were found in the part load curve. Error of the fuel consumption rate was 0.5 to 3 L/h at the part load curve. It was shown that 69% and 53% of fuel consumption rates could be reduced in plowing and rotary tilling operations, respectively, when the eco driving system was installed in tractor. 展开更多
关键词 TRACTOR fuel consumption rate Power Take-Off (PTO).
下载PDF
Dynamics of Lumber Production from Buttressed-Stumps of Logging Residues Using a Fuel Powered Horizontal Mobile Bandsaw Machine
3
作者 Reynolds Okai Esi Ametoxe Banful Stephen Jobson Mitchual 《Journal of Environmental Science and Engineering(A)》 2016年第2期82-89,共8页
Logging residue can be defined as any form of wood, which under the highest stage of technological development could be used in manufacturing but is left in the forest during logging. Lumber production from logging re... Logging residue can be defined as any form of wood, which under the highest stage of technological development could be used in manufacturing but is left in the forest during logging. Lumber production from logging residues of a previous logging activity by a timber firm was undertaken with the objective of determining the suitability of utilizing buttressed-stumps as raw material for the timber industry. A horizontal mobile bandsaw machine was used to process the buttressed-stumps into lumber. The machine was characterized by a thin-kerr sawing technology (kerf-width 1.6 mm) compared to the conventional bandsaw machines of kerr-widths ranging from 3.0-4.5 mm. Lumber value and volume yields, fuel consumption rate, frequency of tool replacement and lumber production rate were assessed. Results indicated that there is the potential to increase timber production from logging residues by utilizing buttressed-stumps. Lumber value and volume yields of eight timber species investigated in this study ranged from 5%-31% and 34%-54% respectively. Fuel consumption rate which increased with increasing wood density, ranged from 5-14.5 liters/m3 of lumber produced. Frequency of saw replacement increased with increasing wood density. The number of saws required to produce one cubic meter of lumber, ranged from 1 to 7. Lumber production rate ranged from 0.10-0.38 m3/hour, increasing with decreasing wood density. 展开更多
关键词 Buttressed-stumps downstream processing logging residues lumber value and volume yields mobile bandsawmachine.
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部