The fully mechanized caving coal mining under the railway in mine area will result in difficulty maintenance of railway because of great distortion and subsidence speed of terrene and railway. If the subsidence foreca...The fully mechanized caving coal mining under the railway in mine area will result in difficulty maintenance of railway because of great distortion and subsidence speed of terrene and railway. If the subsidence forecasting is incorrect and maintenance measure is not suitable in the preceding and the process of mining, the normal operation of the railway in mine area will not be ensured and perhaps the safety accident will be resulted. The railway subsidence forecasting and maintenance system for fully mechanized caving coal face are studied and developed in this connection. Based on the accurate subsidence forecasting of the terrene and railway, the maintenance measure for track and switch turnout in railway is put forward in this system.展开更多
文摘The fully mechanized caving coal mining under the railway in mine area will result in difficulty maintenance of railway because of great distortion and subsidence speed of terrene and railway. If the subsidence forecasting is incorrect and maintenance measure is not suitable in the preceding and the process of mining, the normal operation of the railway in mine area will not be ensured and perhaps the safety accident will be resulted. The railway subsidence forecasting and maintenance system for fully mechanized caving coal face are studied and developed in this connection. Based on the accurate subsidence forecasting of the terrene and railway, the maintenance measure for track and switch turnout in railway is put forward in this system.