The Upper Lillooet River Hydroelectric Project (ULHP) is a run-of-river power generation scheme located near Pemberton, British Columbia, Canada, consisting of two separate hydroelectric facilities (HEFs) with a c...The Upper Lillooet River Hydroelectric Project (ULHP) is a run-of-river power generation scheme located near Pemberton, British Columbia, Canada, consisting of two separate hydroelectric facilities (HEFs) with a combined capacity of 106.7 MW. These HEFs are owned by the Upper Lillooet River Power Limited Partnership and the Boulder Creek Power Limited Partnership, and civil and tunnel construction was completed by CRT-ebc. The Upper Lillooet River HEF includes the excavation ofa 6 m wide by 5.5 m high and approximately 2500 m long tunnel along the Upper Lillooet River Valley. The project is in a moun- tainous area; severe restrictions imposed by weather conditions and the presence of sensitive wildlife species constrained the site operations in order to limit environmental impacts. The site is adjacent to the Mount Meager Volcanic Complex, the most recently active volcano in Western Canada. Tunneling conditions were very challenging, including a section through deposits associated with the most recent eruption from Mount Meager Volcanic Complex (-2360 years before the present). This tunnel section included welded breccia and unconsolidated deposits composed of loose pumice, organics (that represent an old forest floor), and till, before entering the underlying tonalite bedrock. The construction of this section of the tunnel required cover grouting, umbrella support, and excavation with a combination of road header, hydraulic hammer, and drilling-and-blasting method. This paper provides an overview of the project, a summary of the key design and construction schedule challenges, and a description of the successful excavation of the tunnel through deposits associated with the recent volcanic activity.展开更多
This article analyzes the importance of the moderately leading development in electric power industry, and the basic policy of the industry in China. It evaluates if the industry is appropriately developed ahead of ot...This article analyzes the importance of the moderately leading development in electric power industry, and the basic policy of the industry in China. It evaluates if the industry is appropriately developed ahead of other industries from the aspects of legal structuring, planning, electricity pricing mechanism, fixed assets investment, human resources, technological innovation and production and supply capacity etc., and proposes f ive recommendations.展开更多
Transformers utilizing HTS (high temperature superconductors) are considered as a timely invention. The number of power transformers age more than 30 years old and nearing retirement is increasing. If this window of...Transformers utilizing HTS (high temperature superconductors) are considered as a timely invention. The number of power transformers age more than 30 years old and nearing retirement is increasing. If this window of opportunity is not grabbed, there would be great reluctance to replace recently installed highly priced capital asset. Major projects of developing HTS transformers are well making progress in the United States, Europe, Japan, Korea and China which indicate the interest. The efforts must have been appropriately verified through the economic interest of the discounted losses. Consequently, it is very important to develop an understanding of the fundamental HTS transformer design issues that can provide guidance for developing practical devices of interest to the electric utility industry. The parameters of HTS transformer need to be validated before any effort is to carry out to model the behaviour of a distribution network under a range of conditions. The predicted performance and reliability of HTS transformers can then be verified through the network modelling and analysis calculation. The ultimate purpose is to furnish electric utilities precise information as to which HTS transformers work under various applications with greater technical efficiency and proven reliability.展开更多
China Electricity Council organized competent authorities across the industry of electric power to work out the "Research Reports on the 12th Five-Year Plan for Electric Power Industry" in nearly one year,which prov...China Electricity Council organized competent authorities across the industry of electric power to work out the "Research Reports on the 12th Five-Year Plan for Electric Power Industry" in nearly one year,which provides a reference for governmental departments to formulate the 12th Five-Year Plan on energy and electric power industry.The magazine will publish the serial reports including power sources,power grids,equipment manufacture,energy and environment,and power economics.This paper presents the part of "power sources," in which the strategies of developing various kinds of power sources are put forward.展开更多
文摘The Upper Lillooet River Hydroelectric Project (ULHP) is a run-of-river power generation scheme located near Pemberton, British Columbia, Canada, consisting of two separate hydroelectric facilities (HEFs) with a combined capacity of 106.7 MW. These HEFs are owned by the Upper Lillooet River Power Limited Partnership and the Boulder Creek Power Limited Partnership, and civil and tunnel construction was completed by CRT-ebc. The Upper Lillooet River HEF includes the excavation ofa 6 m wide by 5.5 m high and approximately 2500 m long tunnel along the Upper Lillooet River Valley. The project is in a moun- tainous area; severe restrictions imposed by weather conditions and the presence of sensitive wildlife species constrained the site operations in order to limit environmental impacts. The site is adjacent to the Mount Meager Volcanic Complex, the most recently active volcano in Western Canada. Tunneling conditions were very challenging, including a section through deposits associated with the most recent eruption from Mount Meager Volcanic Complex (-2360 years before the present). This tunnel section included welded breccia and unconsolidated deposits composed of loose pumice, organics (that represent an old forest floor), and till, before entering the underlying tonalite bedrock. The construction of this section of the tunnel required cover grouting, umbrella support, and excavation with a combination of road header, hydraulic hammer, and drilling-and-blasting method. This paper provides an overview of the project, a summary of the key design and construction schedule challenges, and a description of the successful excavation of the tunnel through deposits associated with the recent volcanic activity.
文摘This article analyzes the importance of the moderately leading development in electric power industry, and the basic policy of the industry in China. It evaluates if the industry is appropriately developed ahead of other industries from the aspects of legal structuring, planning, electricity pricing mechanism, fixed assets investment, human resources, technological innovation and production and supply capacity etc., and proposes f ive recommendations.
文摘Transformers utilizing HTS (high temperature superconductors) are considered as a timely invention. The number of power transformers age more than 30 years old and nearing retirement is increasing. If this window of opportunity is not grabbed, there would be great reluctance to replace recently installed highly priced capital asset. Major projects of developing HTS transformers are well making progress in the United States, Europe, Japan, Korea and China which indicate the interest. The efforts must have been appropriately verified through the economic interest of the discounted losses. Consequently, it is very important to develop an understanding of the fundamental HTS transformer design issues that can provide guidance for developing practical devices of interest to the electric utility industry. The parameters of HTS transformer need to be validated before any effort is to carry out to model the behaviour of a distribution network under a range of conditions. The predicted performance and reliability of HTS transformers can then be verified through the network modelling and analysis calculation. The ultimate purpose is to furnish electric utilities precise information as to which HTS transformers work under various applications with greater technical efficiency and proven reliability.
文摘China Electricity Council organized competent authorities across the industry of electric power to work out the "Research Reports on the 12th Five-Year Plan for Electric Power Industry" in nearly one year,which provides a reference for governmental departments to formulate the 12th Five-Year Plan on energy and electric power industry.The magazine will publish the serial reports including power sources,power grids,equipment manufacture,energy and environment,and power economics.This paper presents the part of "power sources," in which the strategies of developing various kinds of power sources are put forward.