期刊文献+
共找到5篇文章
< 1 >
每页显示 20 50 100
电力电工行业的创新设计
1
作者 邹林 《现代制造》 2003年第13期66-67,共2页
电工电器行业“十五”规划目标,在主要产品领域缩短与国际先进水平的差距,优先发展高技术产品,使电工电器行业的发展建立在高技术基础之上。三维CAD软件能够快捷地实现创新设计,是企业参与国际化竞争地必备工具,保证企业不断地进行产品... 电工电器行业“十五”规划目标,在主要产品领域缩短与国际先进水平的差距,优先发展高技术产品,使电工电器行业的发展建立在高技术基础之上。三维CAD软件能够快捷地实现创新设计,是企业参与国际化竞争地必备工具,保证企业不断地进行产品创新、降低产品成本、提高产品质量、加快产品上市时间,最终帮助企业在市场中占据领先地位。CAXA实体设计软件在电力电工制造行业中有很多成功应用的案例。 展开更多
关键词 电力电工行业 产品质量 产品结构 创新设计 CAD
下载PDF
Upper Lillooet River Hydroelectric Project: The Challenges of Constructing a Power Tunnel for Run-of-River Hydro Projects in Mountainous British Columbia 被引量:1
2
作者 Nichole Boultbee Oliver Robson +1 位作者 Serge Moalli Rich Humphries 《Engineering》 2018年第2期96-102,共7页
The Upper Lillooet River Hydroelectric Project (ULHP) is a run-of-river power generation scheme located near Pemberton, British Columbia, Canada, consisting of two separate hydroelectric facilities (HEFs) with a c... The Upper Lillooet River Hydroelectric Project (ULHP) is a run-of-river power generation scheme located near Pemberton, British Columbia, Canada, consisting of two separate hydroelectric facilities (HEFs) with a combined capacity of 106.7 MW. These HEFs are owned by the Upper Lillooet River Power Limited Partnership and the Boulder Creek Power Limited Partnership, and civil and tunnel construction was completed by CRT-ebc. The Upper Lillooet River HEF includes the excavation ofa 6 m wide by 5.5 m high and approximately 2500 m long tunnel along the Upper Lillooet River Valley. The project is in a moun- tainous area; severe restrictions imposed by weather conditions and the presence of sensitive wildlife species constrained the site operations in order to limit environmental impacts. The site is adjacent to the Mount Meager Volcanic Complex, the most recently active volcano in Western Canada. Tunneling conditions were very challenging, including a section through deposits associated with the most recent eruption from Mount Meager Volcanic Complex (-2360 years before the present). This tunnel section included welded breccia and unconsolidated deposits composed of loose pumice, organics (that represent an old forest floor), and till, before entering the underlying tonalite bedrock. The construction of this section of the tunnel required cover grouting, umbrella support, and excavation with a combination of road header, hydraulic hammer, and drilling-and-blasting method. This paper provides an overview of the project, a summary of the key design and construction schedule challenges, and a description of the successful excavation of the tunnel through deposits associated with the recent volcanic activity. 展开更多
关键词 Run-of-river hydro project Power tunnel Umbrella support Canopy tubes Volcanic depositsPumiceRoadheader Environmental constraints
下载PDF
Evaluation of the Moderately Leading Development in China's Electric Power Industry
3
作者 Wang Zhixuan 《Electricity》 2011年第3期12-15,共4页
This article analyzes the importance of the moderately leading development in electric power industry, and the basic policy of the industry in China. It evaluates if the industry is appropriately developed ahead of ot... This article analyzes the importance of the moderately leading development in electric power industry, and the basic policy of the industry in China. It evaluates if the industry is appropriately developed ahead of other industries from the aspects of legal structuring, planning, electricity pricing mechanism, fixed assets investment, human resources, technological innovation and production and supply capacity etc., and proposes f ive recommendations. 展开更多
关键词 electric power industry development policy EVALUATION
下载PDF
Modelling and Analysis of Distribution Network with HTS Transformer
4
作者 Muhammad Azizi Abdul Rahman Tek-Tjing Lie Krishnamachar Prasad 《Journal of Energy and Power Engineering》 2012年第4期580-590,共11页
Transformers utilizing HTS (high temperature superconductors) are considered as a timely invention. The number of power transformers age more than 30 years old and nearing retirement is increasing. If this window of... Transformers utilizing HTS (high temperature superconductors) are considered as a timely invention. The number of power transformers age more than 30 years old and nearing retirement is increasing. If this window of opportunity is not grabbed, there would be great reluctance to replace recently installed highly priced capital asset. Major projects of developing HTS transformers are well making progress in the United States, Europe, Japan, Korea and China which indicate the interest. The efforts must have been appropriately verified through the economic interest of the discounted losses. Consequently, it is very important to develop an understanding of the fundamental HTS transformer design issues that can provide guidance for developing practical devices of interest to the electric utility industry. The parameters of HTS transformer need to be validated before any effort is to carry out to model the behaviour of a distribution network under a range of conditions. The predicted performance and reliability of HTS transformers can then be verified through the network modelling and analysis calculation. The ultimate purpose is to furnish electric utilities precise information as to which HTS transformers work under various applications with greater technical efficiency and proven reliability. 展开更多
关键词 High temperature superconductor TRANSFORMER distribution system network modelling.
下载PDF
Research Reports on the 12^(th) Five-Year Plan for Electric Power Industry Power Sources
5
作者 Grace Chang 《Electricity》 2011年第2期1-7,共7页
China Electricity Council organized competent authorities across the industry of electric power to work out the "Research Reports on the 12th Five-Year Plan for Electric Power Industry" in nearly one year,which prov... China Electricity Council organized competent authorities across the industry of electric power to work out the "Research Reports on the 12th Five-Year Plan for Electric Power Industry" in nearly one year,which provides a reference for governmental departments to formulate the 12th Five-Year Plan on energy and electric power industry.The magazine will publish the serial reports including power sources,power grids,equipment manufacture,energy and environment,and power economics.This paper presents the part of "power sources," in which the strategies of developing various kinds of power sources are put forward. 展开更多
关键词 power sources PLANNING electric power industry
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部