To simulate the process of electrode operation, a dynamic model describing the electrode system of three-phase electric arc furnace was developed. This new model can be divided into three submodels in terms of the pra...To simulate the process of electrode operation, a dynamic model describing the electrode system of three-phase electric arc furnace was developed. This new model can be divided into three submodels in terms of the practical situation. They are the power supply system model the electric arc model and the hydraulic actuator system model. According to the basic circuit theory, the power supply system model where the high voltage transmission circuit and mutual inductances were considered, was set up. The electric arc model, which was novel for the electrode control, served as the electrical load and was connected to the power supply system model. The hydraulic actuator system model consists of the proportional valve part that is modeled to capture the dead-zone nonlinear characteristics and the hydraulic cylinder part where the impact of the load force is taken into account. By comparing simulation data and actual data, the results show that the electrode system model is proved to be accurate.展开更多
The new techniques were presented for preventing undesirable distance relay maloperation during voltage collapse and power swings in transmission grids. Initially, the work focused on the development of a fast detecti...The new techniques were presented for preventing undesirable distance relay maloperation during voltage collapse and power swings in transmission grids. Initially, the work focused on the development of a fast detection of voltage collapse and a three-phase fault at transmission lines by using under impedance fault detector (UIFD) and support vector machine (SVM). Likewise, an intelligent approach was developed to discriminate a fault, stable swing and unstable swing, for correct distance relay operation by using the S-transform and the probabilistic neural network (PNN). To illustrate the effectiveness of the proposed techniques, simulations were carried out on the IEEE 39-bus test system using the PSS/E and MATLAB software.展开更多
Power line inspection is an essential procedure in the power lines maintenance area, especially thinking about service availability and energy efficiency. Aerial inspection of electric power transmission lines is typi...Power line inspection is an essential procedure in the power lines maintenance area, especially thinking about service availability and energy efficiency. Aerial inspection of electric power transmission lines is typically performed using human-piloted helicopters, which is a procedure that is both expensive and prone to accidents taking risks to human beings' lives. The work presents a solution based on UAS (unmanned aircraft system) for inspecting power lines. In this context a R & D project of an unmanned aircraft system to be used for performing complete aerial inspection of overhead power lines is being executed by ITA (Instituto Tecnol6gico de Aeron^utica) (Technological Institute of Aeronautics) in Brazil. Special attention is dedicated to the communication system conception in order to comply with Remotely Piloted Aircraft System definition in the context of long endurance operations of the system. It presents a solution based on LTA (lighter than air) platform in order to extend the communication range beyond line of sight.展开更多
Electric power systems usually cover large geographical areas and transmission facilities are continuously increasing. These power systems are exposed to different environmental conditions which may cause faults to oc...Electric power systems usually cover large geographical areas and transmission facilities are continuously increasing. These power systems are exposed to different environmental conditions which may cause faults to occur on the system. Different types of studies are usually done on electric power systems to determine how the system behaves before, during and after a fault condition. The behaviour of variables of interest such as currents, voltage, rotor angle and active and reactive power under fault conditions are studied and observed to help determine possible causes of faults in a power system. The objective of this paper is to investigate a fault that occurred on the 330 kV transmission line between Ruacana power station and Omburu sub-station, the fault caused all the generators at Ruacana power station to trip and consequently caused a blackout at the power station that lasted for 6 h. Preliminary findings showed that the observed fault was an earth fault but the exact type of earth fault was however not known at the time. This research investigation sets out to determine the exact fault that occurred; the most probable cause of the fault, and propose possible solutions to prevent reoccurrence of such a fault. The section of the power network in which the fault occurred was modelled using DigSilent Power Factory software tool, and transient fault analysis was carried out on the model for different fault conditions. Results obtained were then compared with data obtained from NamPower records to ascertain the type of fault.展开更多
基金Projects(2007AA04Z194, 2007AA041401) supported by the National High-Tech Research and Development Program of China
文摘To simulate the process of electrode operation, a dynamic model describing the electrode system of three-phase electric arc furnace was developed. This new model can be divided into three submodels in terms of the practical situation. They are the power supply system model the electric arc model and the hydraulic actuator system model. According to the basic circuit theory, the power supply system model where the high voltage transmission circuit and mutual inductances were considered, was set up. The electric arc model, which was novel for the electrode control, served as the electrical load and was connected to the power supply system model. The hydraulic actuator system model consists of the proportional valve part that is modeled to capture the dead-zone nonlinear characteristics and the hydraulic cylinder part where the impact of the load force is taken into account. By comparing simulation data and actual data, the results show that the electrode system model is proved to be accurate.
文摘The new techniques were presented for preventing undesirable distance relay maloperation during voltage collapse and power swings in transmission grids. Initially, the work focused on the development of a fast detection of voltage collapse and a three-phase fault at transmission lines by using under impedance fault detector (UIFD) and support vector machine (SVM). Likewise, an intelligent approach was developed to discriminate a fault, stable swing and unstable swing, for correct distance relay operation by using the S-transform and the probabilistic neural network (PNN). To illustrate the effectiveness of the proposed techniques, simulations were carried out on the IEEE 39-bus test system using the PSS/E and MATLAB software.
文摘Power line inspection is an essential procedure in the power lines maintenance area, especially thinking about service availability and energy efficiency. Aerial inspection of electric power transmission lines is typically performed using human-piloted helicopters, which is a procedure that is both expensive and prone to accidents taking risks to human beings' lives. The work presents a solution based on UAS (unmanned aircraft system) for inspecting power lines. In this context a R & D project of an unmanned aircraft system to be used for performing complete aerial inspection of overhead power lines is being executed by ITA (Instituto Tecnol6gico de Aeron^utica) (Technological Institute of Aeronautics) in Brazil. Special attention is dedicated to the communication system conception in order to comply with Remotely Piloted Aircraft System definition in the context of long endurance operations of the system. It presents a solution based on LTA (lighter than air) platform in order to extend the communication range beyond line of sight.
文摘Electric power systems usually cover large geographical areas and transmission facilities are continuously increasing. These power systems are exposed to different environmental conditions which may cause faults to occur on the system. Different types of studies are usually done on electric power systems to determine how the system behaves before, during and after a fault condition. The behaviour of variables of interest such as currents, voltage, rotor angle and active and reactive power under fault conditions are studied and observed to help determine possible causes of faults in a power system. The objective of this paper is to investigate a fault that occurred on the 330 kV transmission line between Ruacana power station and Omburu sub-station, the fault caused all the generators at Ruacana power station to trip and consequently caused a blackout at the power station that lasted for 6 h. Preliminary findings showed that the observed fault was an earth fault but the exact type of earth fault was however not known at the time. This research investigation sets out to determine the exact fault that occurred; the most probable cause of the fault, and propose possible solutions to prevent reoccurrence of such a fault. The section of the power network in which the fault occurred was modelled using DigSilent Power Factory software tool, and transient fault analysis was carried out on the model for different fault conditions. Results obtained were then compared with data obtained from NamPower records to ascertain the type of fault.