期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
印度尼西亚电力投资环境评价 被引量:1
1
作者 钟杰峰 邓小文 牛峰 《南方能源建设》 2016年第1期27-32,共6页
印度尼西亚是东盟最大的经济体,对外贸易是印度尼西亚国民经济的重要组成部分,印度尼西亚也是中国电力企业海外投资的重点投资国家之一。文章对其电力市场投资环境作了全面分析,首先介绍了国家宏观投资环境,然后从现状、环境和需求三方... 印度尼西亚是东盟最大的经济体,对外贸易是印度尼西亚国民经济的重要组成部分,印度尼西亚也是中国电力企业海外投资的重点投资国家之一。文章对其电力市场投资环境作了全面分析,首先介绍了国家宏观投资环境,然后从现状、环境和需求三方面评价其电力行业环境,最后用量化的方法对其做整体评价。文章对印度尼西亚电力市场投资环境分析结果可为中国电力行业海外投资提供较好的参考和借鉴。 展开更多
关键词 印度尼西亚 电力市场投资环境 国家宏观投资环境 电力行业环境
下载PDF
Environmental Issues and Management for Hydropower Peaking Operations
2
作者 Helen Locher 《Small Hydro Power News》 2005年第81期15-19,共5页
Many hydropower plants are operated as peak generators or frequency controllers, because they can change their output quickly to follow the fluctuating power demand. When meeting peak load requirements, a power statio... Many hydropower plants are operated as peak generators or frequency controllers, because they can change their output quickly to follow the fluctuating power demand. When meeting peak load requirements, a power station is turned on at a particular time during the day, generates power at a constant load for a certain number of hours, and is then turned off or set to a different load for another time period, resulting in a high variability inflow discharges. Where reservoir hydro schemes are operated primarily to provide peak load services, there are particular environmental risks that should be considered in any environmental impact assessment. At a minimum these should focus on water quality, fluvial geomorphology, riparian vegetation, macro-invertebrate and fish communities underpinned by a sound hydrological analysis. Frequent temperature changes may occur downstream of a peaking power station; increased seepage-induced erosion of riverbanks due to frequent water level drawdowns; and impacts to macro-invertebrate and fish communities due to rapid and frequent in channel habitat conditions. With a sound understanding of the potential environmental issues, there are strategies that can be employed at the siting and design stage to minimize or mitigate these risks, including but not limited to minimum environmental flows, ramping rules, utilization of a re-regulation storage and localized treatment works. 展开更多
关键词 HYDROPOWER ENVIRONMENTAL peaking HYDROPEAKING MITIGATION
下载PDF
Research Reports on the 12^(th) Five-Year Plan for Electric Power Industry Power Grids
3
作者 China Electricity Council Zhang Weidong Su Hangtian Liu Jing 《Electricity》 2011年第3期1-6,共6页
China Electricity Council organized competent authorities across the industry of electric power to work out the "Research Reports on the 12^th Five-Year Plan for Electric" Power lndustry "" in nearly one year, whi... China Electricity Council organized competent authorities across the industry of electric power to work out the "Research Reports on the 12^th Five-Year Plan for Electric" Power lndustry "" in nearly one year, which provides a reference/or governmental departments to formulate the 12^th Five-Year Plan on energy and electric power industry. The magazine should publish the serial reports inchliding power sources, power grids, equipment manufacture, energy and environment, and power economics. This paper presents the part of " power grids, " in which the strategies of developing power grids are put forward. 展开更多
关键词 power grids PLANNING electric power industry
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部