This paper describes the planned power transmission from west to east through three channels. It presents the main characteristics of these three channels and the problems need to be solved.
In this paper the growing process of China power grid from formation of local power grids to nationwide interconnection is reviewed. The scale and structure of power grid construction in the near future, especially th...In this paper the growing process of China power grid from formation of local power grids to nationwide interconnection is reviewed. The scale and structure of power grid construction in the near future, especially the planning on sending power from west to east, North-South supplementation and nationwide interconnection are introduced. In addition, the technologies to be extended in future grid development are briefed, such as HVDC, FACTS and compact transmission line, etc.展开更多
In view of that the average electricity consumption per capita is still rather low in China, this paper putsforward ten focal problems in the 10th Five-year Power Plan, including optimized allocation of power sources ...In view of that the average electricity consumption per capita is still rather low in China, this paper putsforward ten focal problems in the 10th Five-year Power Plan, including optimized allocation of power sources and powernetworks, environmental protection in coal-fired power plants, as well as localization of power equipment, etc.展开更多
The main problem existing in Guangdong electric power sources is analyzed in this paper. Based on theanalysis on energy-supply features, power demand and the technical and economic performances of various powersource...The main problem existing in Guangdong electric power sources is analyzed in this paper. Based on theanalysis on energy-supply features, power demand and the technical and economic performances of various powersources in Guangdong, the power sources construction scale and its structure are studied and analyzed in detail byusing Generation Expansion Software Package (GESP). The future development of Guangdong electric power sourcesunder the new situation of "Power from West to East" is studied as well.[展开更多
The models, methods and their application experiences of a practical GIS(geographic information system)-based computer decision-making support system of urban power distribution network planning with seven subsystems,...The models, methods and their application experiences of a practical GIS(geographic information system)-based computer decision-making support system of urban power distribution network planning with seven subsystems,termed CNP,are described.In each subsystem there is at least one or one set of practical mathematical methobs.Some new models and mathematical methods have been introduced.In the development of CNP the idea of cognitive system engineering has been insisted on,which claims that human and computer intelligence should be combined together to solve the complex engineering problems cooperatively.Practical applications have shown that not only the optimal plan can be automatically reached with many complicated factors considered, but also the computation,analysis and graphic drawing burden can be released considerably.展开更多
In this paper,two new concepts—“main out-of-step mode” and “minor out-of-step mode”—are proposed for power system reliability analysis. Large-scale power system studies found that out-of-step generator groups ma...In this paper,two new concepts—“main out-of-step mode” and “minor out-of-step mode”—are proposed for power system reliability analysis. Large-scale power system studies found that out-of-step generator groups may have characteristics of the main out-of-step mode and the minor out-of-step mode. The generator groups with main out-of-step modes can determine the out-of-step interface of the large-scale power system,while generators with the minor out-of-step modes cannot play such a role. Therefore,the method of capturing the out-of-step interface by seeking the lowest voltage point(the out-of-step center) can only group the generators with the main out-of-step modes,and may fail to combine the generators with the minor out-of-step modes into proper coherent generator groups. Thus,it is necessary in engineering applications to equip the generators that are likely to have the characteristics of the minor out-of-step modes with separation devices based on off-line simulation studies in order to reduce the risk of further accidents caused by these generators after system separation.展开更多
文摘This paper describes the planned power transmission from west to east through three channels. It presents the main characteristics of these three channels and the problems need to be solved.
文摘In this paper the growing process of China power grid from formation of local power grids to nationwide interconnection is reviewed. The scale and structure of power grid construction in the near future, especially the planning on sending power from west to east, North-South supplementation and nationwide interconnection are introduced. In addition, the technologies to be extended in future grid development are briefed, such as HVDC, FACTS and compact transmission line, etc.
文摘In view of that the average electricity consumption per capita is still rather low in China, this paper putsforward ten focal problems in the 10th Five-year Power Plan, including optimized allocation of power sources and powernetworks, environmental protection in coal-fired power plants, as well as localization of power equipment, etc.
文摘The main problem existing in Guangdong electric power sources is analyzed in this paper. Based on theanalysis on energy-supply features, power demand and the technical and economic performances of various powersources in Guangdong, the power sources construction scale and its structure are studied and analyzed in detail byusing Generation Expansion Software Package (GESP). The future development of Guangdong electric power sourcesunder the new situation of "Power from West to East" is studied as well.[
文摘The models, methods and their application experiences of a practical GIS(geographic information system)-based computer decision-making support system of urban power distribution network planning with seven subsystems,termed CNP,are described.In each subsystem there is at least one or one set of practical mathematical methobs.Some new models and mathematical methods have been introduced.In the development of CNP the idea of cognitive system engineering has been insisted on,which claims that human and computer intelligence should be combined together to solve the complex engineering problems cooperatively.Practical applications have shown that not only the optimal plan can be automatically reached with many complicated factors considered, but also the computation,analysis and graphic drawing burden can be released considerably.
基金Project (No. 50277034) supported by the National Natural ScienceFoundation of China
文摘In this paper,two new concepts—“main out-of-step mode” and “minor out-of-step mode”—are proposed for power system reliability analysis. Large-scale power system studies found that out-of-step generator groups may have characteristics of the main out-of-step mode and the minor out-of-step mode. The generator groups with main out-of-step modes can determine the out-of-step interface of the large-scale power system,while generators with the minor out-of-step modes cannot play such a role. Therefore,the method of capturing the out-of-step interface by seeking the lowest voltage point(the out-of-step center) can only group the generators with the main out-of-step modes,and may fail to combine the generators with the minor out-of-step modes into proper coherent generator groups. Thus,it is necessary in engineering applications to equip the generators that are likely to have the characteristics of the minor out-of-step modes with separation devices based on off-line simulation studies in order to reduce the risk of further accidents caused by these generators after system separation.