This paper introduces the current situation of China power industry and interconnection, the necessity to develop interconnection, the principle of nationwide interconnection and the key technologies to be studiedincl...This paper introduces the current situation of China power industry and interconnection, the necessity to develop interconnection, the principle of nationwide interconnection and the key technologies to be studiedinclude HVDC and FACTS. The paper also discusses thefeasibility of 750 kV to be used in the northwest.regionand to speed up research and development of nighervoltage level in other regions of China, as well as scl-ence and technical innovation for transmission and dis-tribution projects.展开更多
This paper briefly describes the importance of transmission pricing, and different methods for recovering transmission cost, stimulating efficient use of transmission resources and attracting investment in transmissio...This paper briefly describes the importance of transmission pricing, and different methods for recovering transmission cost, stimulating efficient use of transmission resources and attracting investment in transmission networks.展开更多
This paper analyzes the power markets both in northwest sending end and, east receiving ends, points out the favorable and unfavorable conditions for power development In, the northwest area, brings forward,the develo...This paper analyzes the power markets both in northwest sending end and, east receiving ends, points out the favorable and unfavorable conditions for power development In, the northwest area, brings forward,the development planning of power sources and power network constructions, and presents the benefit estimation of sending power from northwest to east.展开更多
文摘This paper introduces the current situation of China power industry and interconnection, the necessity to develop interconnection, the principle of nationwide interconnection and the key technologies to be studiedinclude HVDC and FACTS. The paper also discusses thefeasibility of 750 kV to be used in the northwest.regionand to speed up research and development of nighervoltage level in other regions of China, as well as scl-ence and technical innovation for transmission and dis-tribution projects.
文摘This paper briefly describes the importance of transmission pricing, and different methods for recovering transmission cost, stimulating efficient use of transmission resources and attracting investment in transmission networks.
文摘This paper analyzes the power markets both in northwest sending end and, east receiving ends, points out the favorable and unfavorable conditions for power development In, the northwest area, brings forward,the development planning of power sources and power network constructions, and presents the benefit estimation of sending power from northwest to east.