To effectively minimize the electromagnetic field response in the total field solution, we propose a numerical modeling method for the two-dimensional (2D) time- domain transient electromagnetic secondary field of t...To effectively minimize the electromagnetic field response in the total field solution, we propose a numerical modeling method for the two-dimensional (2D) time- domain transient electromagnetic secondary field of the line source based on the DuFort- Frankel finite-difference method. In the proposed method, we included the treatment of the earth-air boundary conductivity, calculated the normalized partial derivative of the induced electromotive force (Emf), and determined the forward time step. By extending upward the earth-air interface to the air grid nodes and the zero-value boundary conditions, not only we have a method that is more efficient but also simpler than the total field solution. We computed and analyzed the homogeneous half-space model and the fiat layered model with high precision--the maximum relative error is less than 0.01% between our method and the analytical method--and the solution speed is roughly three times faster than the total-field solution. Lastly, we used the model of a thin body embedded in a homogeneous half-space at different delay times to depict the downward and upward spreading characteristics of the induced eddy current, and the physical interaction processes between the electromagnetic field and the underground low-resistivity body.展开更多
Afghanistan electricity sector has experienced many ups and downs of transitions from 1893 to date. With the growing global interest in Afghanistan rehabilitation, this paper presents an over view of Afghanistan elect...Afghanistan electricity sector has experienced many ups and downs of transitions from 1893 to date. With the growing global interest in Afghanistan rehabilitation, this paper presents an over view of Afghanistan electricity sector which includes the historical development trends, power generation potential, sustainable energy exploitation, electricity policy transition and immature policies experiences, and the legacy of the war. The lack of access to the basic information about Afghanistan power sector was one of the serious concerns of international donors and investors. Still, this information somehow has been kept in official documents wrap up. In this collection, the Afghanistan's electricity sector is pictured as a reference for Afghanistan electricity. It can be opening toward primary sources of Afghanistan electricity sector of the lessons learned and asset for researchers interesting in this topic.展开更多
The rapid change in economic growth and human civilization has led to a dramatic increase in energy utilization and electricity demand. That faces nations with the challenge of maintaining cost-effective and clean pow...The rapid change in economic growth and human civilization has led to a dramatic increase in energy utilization and electricity demand. That faces nations with the challenge of maintaining cost-effective and clean power energy production. This paper aims to present Afghanistan electricity sector development and energy resources exploitation in a broad context. With the global growing interest in Afghanistan rehabilitation, this paper presents energy development trends in Afghanistan. Besides, the future outlook up to 2032 and the challenges that face electricity sector are highlighted. This study tries to emerge the historical development, current status, and future direction of Afghanistan electricity sector till 2032, in a precise collection.展开更多
基金supported by the National High Technology Research and Development Program (863 Program)(2009AA06Z108)
文摘To effectively minimize the electromagnetic field response in the total field solution, we propose a numerical modeling method for the two-dimensional (2D) time- domain transient electromagnetic secondary field of the line source based on the DuFort- Frankel finite-difference method. In the proposed method, we included the treatment of the earth-air boundary conductivity, calculated the normalized partial derivative of the induced electromotive force (Emf), and determined the forward time step. By extending upward the earth-air interface to the air grid nodes and the zero-value boundary conditions, not only we have a method that is more efficient but also simpler than the total field solution. We computed and analyzed the homogeneous half-space model and the fiat layered model with high precision--the maximum relative error is less than 0.01% between our method and the analytical method--and the solution speed is roughly three times faster than the total-field solution. Lastly, we used the model of a thin body embedded in a homogeneous half-space at different delay times to depict the downward and upward spreading characteristics of the induced eddy current, and the physical interaction processes between the electromagnetic field and the underground low-resistivity body.
文摘Afghanistan electricity sector has experienced many ups and downs of transitions from 1893 to date. With the growing global interest in Afghanistan rehabilitation, this paper presents an over view of Afghanistan electricity sector which includes the historical development trends, power generation potential, sustainable energy exploitation, electricity policy transition and immature policies experiences, and the legacy of the war. The lack of access to the basic information about Afghanistan power sector was one of the serious concerns of international donors and investors. Still, this information somehow has been kept in official documents wrap up. In this collection, the Afghanistan's electricity sector is pictured as a reference for Afghanistan electricity. It can be opening toward primary sources of Afghanistan electricity sector of the lessons learned and asset for researchers interesting in this topic.
文摘The rapid change in economic growth and human civilization has led to a dramatic increase in energy utilization and electricity demand. That faces nations with the challenge of maintaining cost-effective and clean power energy production. This paper aims to present Afghanistan electricity sector development and energy resources exploitation in a broad context. With the global growing interest in Afghanistan rehabilitation, this paper presents energy development trends in Afghanistan. Besides, the future outlook up to 2032 and the challenges that face electricity sector are highlighted. This study tries to emerge the historical development, current status, and future direction of Afghanistan electricity sector till 2032, in a precise collection.