Usually the water head of the pumped storage hydro-plant is high, generally up to 400-500 m, therefore the rock mass under the high-pressure bifurcation pipe have to bear as high as millions Pascal water pressure, in ...Usually the water head of the pumped storage hydro-plant is high, generally up to 400-500 m, therefore the rock mass under the high-pressure bifurcation pipe have to bear as high as millions Pascal water pressure, in according with the requirements of high water head pumped storage hydro-plant should be 1.2 times of the water head special high-pressure packer permeability test compared with normal to test the permeability of rock and rock cleavage pressure value. The test results on the choice of design options often play a decisive role. Based on the engineering practice, the authors studied the drillhole high-pressure packer permeability test in the pumped storage hydro-plant's underground powerhouse, by the analysis of test results, this article offers a demonstration of the deformation of rock fracture witch under building in the condition of high-pressure water head, it provides a more detailed engineering geological background.展开更多
Due to the phenomenon of abandoning wind power and photo voltage(PV)power in the“Three Northern Areas”in China,this paper presents an optimal strategy for coordinating and dispatching“source-load”in power system b...Due to the phenomenon of abandoning wind power and photo voltage(PV)power in the“Three Northern Areas”in China,this paper presents an optimal strategy for coordinating and dispatching“source-load”in power system based on multiple time scales.On the basis of the analysis of the uncertainty of wind power and PV power as well as the characteristics of load side resource dispatching,the optimal model of coordinating and dispatching“source-load”in power system based on multiple time scales is established.It can simultaneously and effectively dispatch conventional generators,wind plant,PV power station,pumped-storage power station and load side resources by optimally using three time scales:day-ahead,intra-day and real-time.According to the latest predicted information of wind power,PV power and load,the original generation schedule can be rolled and amended by using the corresponding time scale.The effectiveness of the model can be verified by a real system.The simulation results show that the proposed model can make full use of“source-load”resources to improve the ability to consume wind power and PV power of the grid-connected system.展开更多
Electricity generation generally is made in thermal, hydro, geothermal power plants and windfarms/windparks. Because of some advantages such as renewability, low-cost, clean, safe and naturality geothermal and wind en...Electricity generation generally is made in thermal, hydro, geothermal power plants and windfarms/windparks. Because of some advantages such as renewability, low-cost, clean, safe and naturality geothermal and wind energy will have been electricity generation source in the near future. Turkey has hot water springs suitable for electricity generation between 130-242 ~C with natural vapor and hydrothermal alterations in connection with grabens limited to active faults and diffuse young volcanism in Western Anatolia Region. Other renewable energy and electricity generation resource is wind energy. In Turkey electricity generation is made by windfarms/windparks. These parks/farms are generated 1,414.55 MW electricity. The year 2010 electricity general total installed capacity in Turkey is about 49,524.1 MW. According to the total installed capacity, thermal power plants have 65.18%, hydro power plants have 31.97%, geothermal power plants and wind farms have 2.85%. Electricity generation generally was obtained from 15 thermal power plants. In this study high temperature geothermal fields and windparks/windfarms in Turkey which are suitable for electricity generation potential were investigated.展开更多
Two new miniature metallic sealed-cells containing the triple point of water, WTP (273.16 K) and the triple point of mercury, HgTP (234.3156 K) have been constructed for the realization of the International Temper...Two new miniature metallic sealed-cells containing the triple point of water, WTP (273.16 K) and the triple point of mercury, HgTP (234.3156 K) have been constructed for the realization of the International Temperature Scale of 1990 (ITS-90) at the National Institute of Standards (NIS-Egypt). The two new cells, in addition to a previously realized argon and oxygen triple point cells, will provide facilities for the calibration of capsule-type standard platinum resistance thermometers (CSPRTs) at one single run. Many phase transition plateaux were carried out and compared to the laboratory large reference cells using the same thermometers in order to test the performance of the new cell.展开更多
Deregulation and liberalization of electric power industry, among other things, has created new requirements for the market participants. The power system engineer, operator, and, in general, the market participants a...Deregulation and liberalization of electric power industry, among other things, has created new requirements for the market participants. The power system engineer, operator, and, in general, the market participants are being faced with requirements for which they do not have adequate training and the proper software tools. In this framework, among others, a pure hydro-generation company has to operate its hydro units, throughout the operating day, trying to fulfill the market clearing schedule or a bilateral contract, and modify the program in the intra-day energy markets if necessary (or more suitable) as real-time operation is getting closer. In this scenario the objective is to maximize the hydroelectric power plant profit from selling energy in the spot market or by means of bilateral contracts. In this paper the optimal operation of a head-dependent hydroelectric power station in bilateral market-short-term hourly hydro resource scheduling for energy is obtained.展开更多
文摘Usually the water head of the pumped storage hydro-plant is high, generally up to 400-500 m, therefore the rock mass under the high-pressure bifurcation pipe have to bear as high as millions Pascal water pressure, in according with the requirements of high water head pumped storage hydro-plant should be 1.2 times of the water head special high-pressure packer permeability test compared with normal to test the permeability of rock and rock cleavage pressure value. The test results on the choice of design options often play a decisive role. Based on the engineering practice, the authors studied the drillhole high-pressure packer permeability test in the pumped storage hydro-plant's underground powerhouse, by the analysis of test results, this article offers a demonstration of the deformation of rock fracture witch under building in the condition of high-pressure water head, it provides a more detailed engineering geological background.
基金Major Projects of Gansu Province(No.17ZD2GA010)Power Company Technology Projects of State Grid Corporation in Gansu Province(No.52272716000K)
文摘Due to the phenomenon of abandoning wind power and photo voltage(PV)power in the“Three Northern Areas”in China,this paper presents an optimal strategy for coordinating and dispatching“source-load”in power system based on multiple time scales.On the basis of the analysis of the uncertainty of wind power and PV power as well as the characteristics of load side resource dispatching,the optimal model of coordinating and dispatching“source-load”in power system based on multiple time scales is established.It can simultaneously and effectively dispatch conventional generators,wind plant,PV power station,pumped-storage power station and load side resources by optimally using three time scales:day-ahead,intra-day and real-time.According to the latest predicted information of wind power,PV power and load,the original generation schedule can be rolled and amended by using the corresponding time scale.The effectiveness of the model can be verified by a real system.The simulation results show that the proposed model can make full use of“source-load”resources to improve the ability to consume wind power and PV power of the grid-connected system.
文摘Electricity generation generally is made in thermal, hydro, geothermal power plants and windfarms/windparks. Because of some advantages such as renewability, low-cost, clean, safe and naturality geothermal and wind energy will have been electricity generation source in the near future. Turkey has hot water springs suitable for electricity generation between 130-242 ~C with natural vapor and hydrothermal alterations in connection with grabens limited to active faults and diffuse young volcanism in Western Anatolia Region. Other renewable energy and electricity generation resource is wind energy. In Turkey electricity generation is made by windfarms/windparks. These parks/farms are generated 1,414.55 MW electricity. The year 2010 electricity general total installed capacity in Turkey is about 49,524.1 MW. According to the total installed capacity, thermal power plants have 65.18%, hydro power plants have 31.97%, geothermal power plants and wind farms have 2.85%. Electricity generation generally was obtained from 15 thermal power plants. In this study high temperature geothermal fields and windparks/windfarms in Turkey which are suitable for electricity generation potential were investigated.
文摘Two new miniature metallic sealed-cells containing the triple point of water, WTP (273.16 K) and the triple point of mercury, HgTP (234.3156 K) have been constructed for the realization of the International Temperature Scale of 1990 (ITS-90) at the National Institute of Standards (NIS-Egypt). The two new cells, in addition to a previously realized argon and oxygen triple point cells, will provide facilities for the calibration of capsule-type standard platinum resistance thermometers (CSPRTs) at one single run. Many phase transition plateaux were carried out and compared to the laboratory large reference cells using the same thermometers in order to test the performance of the new cell.
文摘Deregulation and liberalization of electric power industry, among other things, has created new requirements for the market participants. The power system engineer, operator, and, in general, the market participants are being faced with requirements for which they do not have adequate training and the proper software tools. In this framework, among others, a pure hydro-generation company has to operate its hydro units, throughout the operating day, trying to fulfill the market clearing schedule or a bilateral contract, and modify the program in the intra-day energy markets if necessary (or more suitable) as real-time operation is getting closer. In this scenario the objective is to maximize the hydroelectric power plant profit from selling energy in the spot market or by means of bilateral contracts. In this paper the optimal operation of a head-dependent hydroelectric power station in bilateral market-short-term hourly hydro resource scheduling for energy is obtained.