In terms of rock engineering and technology in hydropower construction,the slope stability and monitoring techniques for high slopes of Three Gorges Project,the stability and support technology for high slopes of hydr...In terms of rock engineering and technology in hydropower construction,the slope stability and monitoring techniques for high slopes of Three Gorges Project,the stability and support technology for high slopes of hydropower projects in deep river valley,the stabilization techniques for underground cavern group with large span and high side walls are introduced in this paper.As for rock engineering and technology in highway and railway construction,the Qinghai-Tibet Railway — new construction techniques in permafrost,the support techniques for large squeezing deformation in Wuqiaoling Tunnel,the construction techniques for tunnels in alpine and high-altitude region,the geological prediction techniques for tunnels in karst region,the microseismic monitoring and early warning techniques for rockbursts in deep and long tunnels are presented.For rock engineering and technology inmining engineering,the innovative techniques for roadway support inmines,the simultaneous extraction technique of pillarless coal and gas in coal seams with low permeability,the safe and efficient deep openmining technology,advances in monitoring,early warning and treatment ofmine dynamic disasters are discussed.In addition,the new anchorage techniques and precision blasting technique in rock engineering are introduced.展开更多
In the design,construction and operation periods of the Three Gorges Project (TGP),great challenges have been met in different fields such as water resources and hydropower project construction,electromechanical equip...In the design,construction and operation periods of the Three Gorges Project (TGP),great challenges have been met in different fields such as water resources and hydropower project construction,electromechanical equipment manufacture and ecological environment protection.In view of the key techniques and difficulties in the construction period,scientific and technological breakthroughs have been made by the experts and scholars of various fields and a series of innovative achievements are gained,which make the scientific and technological levels in relevant fields improved.Some major innovative achievements in the construction and operation of TGP are enumerated,which are significant for the hydropower project construction and clean energy development in the future in China.展开更多
文摘In terms of rock engineering and technology in hydropower construction,the slope stability and monitoring techniques for high slopes of Three Gorges Project,the stability and support technology for high slopes of hydropower projects in deep river valley,the stabilization techniques for underground cavern group with large span and high side walls are introduced in this paper.As for rock engineering and technology in highway and railway construction,the Qinghai-Tibet Railway — new construction techniques in permafrost,the support techniques for large squeezing deformation in Wuqiaoling Tunnel,the construction techniques for tunnels in alpine and high-altitude region,the geological prediction techniques for tunnels in karst region,the microseismic monitoring and early warning techniques for rockbursts in deep and long tunnels are presented.For rock engineering and technology inmining engineering,the innovative techniques for roadway support inmines,the simultaneous extraction technique of pillarless coal and gas in coal seams with low permeability,the safe and efficient deep openmining technology,advances in monitoring,early warning and treatment ofmine dynamic disasters are discussed.In addition,the new anchorage techniques and precision blasting technique in rock engineering are introduced.
文摘In the design,construction and operation periods of the Three Gorges Project (TGP),great challenges have been met in different fields such as water resources and hydropower project construction,electromechanical equipment manufacture and ecological environment protection.In view of the key techniques and difficulties in the construction period,scientific and technological breakthroughs have been made by the experts and scholars of various fields and a series of innovative achievements are gained,which make the scientific and technological levels in relevant fields improved.Some major innovative achievements in the construction and operation of TGP are enumerated,which are significant for the hydropower project construction and clean energy development in the future in China.