The reliability and maintainability of electrical system of drum shearer at Parvade. 1 Coal Mine in central Iran was analyzed. The maintenance and failure data were collected during 19 months of shearer operation. Acc...The reliability and maintainability of electrical system of drum shearer at Parvade. 1 Coal Mine in central Iran was analyzed. The maintenance and failure data were collected during 19 months of shearer operation. According to trend and serial correlation tests, the data were independent and identically distributed (iid) and therefore the statistical techniques were used for modeling. The data analysis show that the time between failures (TBF) and time to repair (TTR) data obey the lognormal and Weibull 3 parameters distribution respectively. Reliability-based preventive maintenance time intervals for electrical system of the drum shearer were calculated with regard to reliability plot. The reliability-based maintenance intervals for 90%, 80%, 70% and 50% reliability level are respectively 9.91, 17.96, 27.56 and 56.1 h. Also the calculations show that time to repair (TTR) of this system varies in range 0.17-4 h with 1.002 h as mean time to repair (MTTR). There is a 80% chance that the electrical system of shearer of Parvade. 1 mine repair will be accomplished within 1.45 h.展开更多
Power line inspection is an essential procedure in the power lines maintenance area, especially thinking about service availability and energy efficiency. Aerial inspection of electric power transmission lines is typi...Power line inspection is an essential procedure in the power lines maintenance area, especially thinking about service availability and energy efficiency. Aerial inspection of electric power transmission lines is typically performed using human-piloted helicopters, which is a procedure that is both expensive and prone to accidents taking risks to human beings' lives. The work presents a solution based on UAS (unmanned aircraft system) for inspecting power lines. In this context a R & D project of an unmanned aircraft system to be used for performing complete aerial inspection of overhead power lines is being executed by ITA (Instituto Tecnol6gico de Aeron^utica) (Technological Institute of Aeronautics) in Brazil. Special attention is dedicated to the communication system conception in order to comply with Remotely Piloted Aircraft System definition in the context of long endurance operations of the system. It presents a solution based on LTA (lighter than air) platform in order to extend the communication range beyond line of sight.展开更多
文摘The reliability and maintainability of electrical system of drum shearer at Parvade. 1 Coal Mine in central Iran was analyzed. The maintenance and failure data were collected during 19 months of shearer operation. According to trend and serial correlation tests, the data were independent and identically distributed (iid) and therefore the statistical techniques were used for modeling. The data analysis show that the time between failures (TBF) and time to repair (TTR) data obey the lognormal and Weibull 3 parameters distribution respectively. Reliability-based preventive maintenance time intervals for electrical system of the drum shearer were calculated with regard to reliability plot. The reliability-based maintenance intervals for 90%, 80%, 70% and 50% reliability level are respectively 9.91, 17.96, 27.56 and 56.1 h. Also the calculations show that time to repair (TTR) of this system varies in range 0.17-4 h with 1.002 h as mean time to repair (MTTR). There is a 80% chance that the electrical system of shearer of Parvade. 1 mine repair will be accomplished within 1.45 h.
文摘Power line inspection is an essential procedure in the power lines maintenance area, especially thinking about service availability and energy efficiency. Aerial inspection of electric power transmission lines is typically performed using human-piloted helicopters, which is a procedure that is both expensive and prone to accidents taking risks to human beings' lives. The work presents a solution based on UAS (unmanned aircraft system) for inspecting power lines. In this context a R & D project of an unmanned aircraft system to be used for performing complete aerial inspection of overhead power lines is being executed by ITA (Instituto Tecnol6gico de Aeron^utica) (Technological Institute of Aeronautics) in Brazil. Special attention is dedicated to the communication system conception in order to comply with Remotely Piloted Aircraft System definition in the context of long endurance operations of the system. It presents a solution based on LTA (lighter than air) platform in order to extend the communication range beyond line of sight.