In order to utilize water and hydropower resources in China,multitudes of water projects are established or to be constructed as an integral part of the national economy's infrastructure.Under these circumstances,...In order to utilize water and hydropower resources in China,multitudes of water projects are established or to be constructed as an integral part of the national economy's infrastructure.Under these circumstances,there are two outstanding problems:1) a mass of existing dams are in danger and 2) in the southwest water-conservancy construction plan,dozens of existing or planned dams are high dams or even super high dams with heights between 200 and 300 m.In accordance with demands of "the National Program for Medium-and Long-Term Scientific and Technological Development" on the innovation frontier in hydro-structure engineering science,various key problems in science and technology such like stress analysis,ultimate bearing capacity,nonlinearity etc.for high dams,super high dams and sick dams have been investigated.This paper makes a commentary on the advances and results of the researches,then analyzes the advantages and disadvantages of current theoretics and methodologies,and finally presents corresponding research directions and the frontier of innovation.展开更多
基金supported by the National Natural Science Foundation of China (Grant Nos. 51079046, 50909041, 50809025, 50879024)the National Science and Technology Support Plan (Grant Nos. 2008BAB29B03, 2008BAB29B06)+6 种基金the Special Fund of State Key Laboratory of China (Grant Nos. 2009586012, 2010585212)the Fundamental Research Funds for the Central Universities (Grant Nos. 2009B08514, 2010B20414, 2010B14114)China Hydropower Engineering Consulting Group Co. Science and Technology Support Project (Grant No. CHC-KJ-2007-02)Jiangsu Province "333 High-Level Personnel Training Project" (Grant No. 2017-B08037)the Natural Science Foundation of Hohai University (Grant No. 2008426811)Graduate Innovation Program of Universities in Jiangsu Province (CX09B_163Z)Science Foundation for The Excellent Youth Scholars of Ministry of Education of China (Grant No. 20070294023)
文摘In order to utilize water and hydropower resources in China,multitudes of water projects are established or to be constructed as an integral part of the national economy's infrastructure.Under these circumstances,there are two outstanding problems:1) a mass of existing dams are in danger and 2) in the southwest water-conservancy construction plan,dozens of existing or planned dams are high dams or even super high dams with heights between 200 and 300 m.In accordance with demands of "the National Program for Medium-and Long-Term Scientific and Technological Development" on the innovation frontier in hydro-structure engineering science,various key problems in science and technology such like stress analysis,ultimate bearing capacity,nonlinearity etc.for high dams,super high dams and sick dams have been investigated.This paper makes a commentary on the advances and results of the researches,then analyzes the advantages and disadvantages of current theoretics and methodologies,and finally presents corresponding research directions and the frontier of innovation.