In the traditional power transmission network planning,deterministic analysis methods are widely used.In such methods,all contingencies are deemed to have the same occurrence probability,which is not reasonable.In thi...In the traditional power transmission network planning,deterministic analysis methods are widely used.In such methods,all contingencies are deemed to have the same occurrence probability,which is not reasonable.In this paper,risk assessment is introduced to the process of transmission network planning considering the probabilistic characteristics of contingencies.Risk indices are given to determine the weak points of the transmission network based on local information,such as bus risk,line overload risk,contingency severity.The indices are calculated by the optimal cost control method based on risk theory,which can help planners to quickly determine weak points in the planning and find solution to them.For simplification,only line overload violation is considered.Finally,the proposed method is validated by an IEEE-RTS test system and a real power system in China from two aspects.In the first case,the original system is evaluated by the proposed method to find the weak points,and then four planning schemes are established,among which the best scheme is selected.In the second case,four initial planning schemes are established by combining the experiences of planners,and after the evaluation by using the proposed method,the best planning scheme is improved based on the information of weak points in the initial schemes,and the risk of improved scheme is reduced from 42 531.86 MW·h per year to 4 431.26 MW·h per year.展开更多
The installed capacity of a large scale wind power plant will be up to a number of hundreds MW, and the wind power is transmitted to load centers through long distance transmission lines with 220 kV, 500 kV, or 750 kV...The installed capacity of a large scale wind power plant will be up to a number of hundreds MW, and the wind power is transmitted to load centers through long distance transmission lines with 220 kV, 500 kV, or 750 kV. Therefore, it is necessary not only considering the power transmission line between a wind power plant and the first connection node of the power network, but also the power network among the group of those wind power plants in a wind power base, the integration network from the base to the existed grids, as well as the distribution and consumption of the wind power generation by loads. Meanwhile, the impact of wind power stochastic fluctuation on power systems must be studied. In recent years, wind power prediction technology has been studied by the utilities and wind power plants. As a matter of fact, some European countries have used this prediction technology as a tool in national power dispatch centers and wind power companies.展开更多
As a complementary to terrestrial mobile communication systems, mobile satellite communication system can fill the gaps that cannot be covered by terrestrial network, and provides an irreplaceable solution for emergen...As a complementary to terrestrial mobile communication systems, mobile satellite communication system can fill the gaps that cannot be covered by terrestrial network, and provides an irreplaceable solution for emergency communication in disaster. To pave the road for future satellite/terrestrial integrated communication networks, ITU-R invited proposals for candidate Radio Interface Technology(RIT) for the satellite component of International Mobile Telecommunications(IMT)-Advanced. China proposed the RIT of Long Term Evolution(LTE)-satellite as a candidate to be considered as IMT-Advanced satellite technology. The submitted LTE-satellite candidate RIT is specified based on terrestrial LTEAdvanced FDD standards that are developed in 3GPP. Considering satellite requirements, a number of modifications to LTE-Advanced are made to adapt to satellite radio transmission environments. This paper provides a general introduction of the new characteristics of LTEsatellite.展开更多
The network coding is a new technology in the field of information in 21st century. It could enhance the network throughput and save the energy consumption, and is mainly based on the single transmission rate. However...The network coding is a new technology in the field of information in 21st century. It could enhance the network throughput and save the energy consumption, and is mainly based on the single transmission rate. However, with the development of wireless network and equipment, wireless local network MAC protocols have already supported the multi-rate transmission. This paper investigates the optimal relay selection problem based on network coding. Firstly, the problem is formulated as an optimization problem. Moreover, a relay algorithm based on network coding is proposed and the transmission time gain of our algorithm over the traditional relay algorithm is analyzed. Lastly, we compare total transmission time and the energy consumption of our proposed algorithm, Network Coding with Relay Assistance (NCRA), Transmission Request (TR), and the Direct Transmission (DT) without relay algorithm by adopting IEEE 802.11b. The simulation results demonstrate that our algorithm that improves the coding opportunity by the cooperation of the relay nodes leads to the transmission time decrease of up to 17% over the traditional relay algorithms.展开更多
This paper describes the study analysis performed to evaluate the available and potential solutions to control the highly increasing short circuit (SC) levels in Kuwait power system. The real Kuwait High Voltage (H...This paper describes the study analysis performed to evaluate the available and potential solutions to control the highly increasing short circuit (SC) levels in Kuwait power system. The real Kuwait High Voltage (HV) network was simulated to examine different measures at both 275 kV and 132 kV stations. The simulation results show that the short circuit currents exceed the permissible levels (40 kA in the 132 kV network and 63 kA in the 275 kV network) in some specific points. The examined measures include the a study on changing the neutral point policy, changing some lines from alternating current (AC) to direct current (DC), dividing specific bus bars in some generating stations and applying current limiters. The paper also presents a new plan for the transmission network in order to manage the expected increase in short circuit levels in the future.展开更多
The electrical transmission networks are complex systems that are commonly run near their operational limits. Such systems can undergo major disturbances that have serious consequences. Individually, these disturbance...The electrical transmission networks are complex systems that are commonly run near their operational limits. Such systems can undergo major disturbances that have serious consequences. Individually, these disturbances can be attributed to specific causes, such as lightning strikes, ice storms, equipment failure, shorts resulting from untrimmed trees, excessive customer demand, or human errors. In the paper, the human errors from electrical transmission networks of Romanian Power Grid Company over period of 10 years are analyzed. It is hoped that obtained results will provide engineers a better understanding so they can cater to the needs of the human operators when to implement new interfaces for network monitoring tasks, not for the other technical objectives.展开更多
This paper establishes a new framework for modeling electrical cyber-physical systems(ECPSs),integrating both power grids and communication networks. To model the communication network associated with a power transmis...This paper establishes a new framework for modeling electrical cyber-physical systems(ECPSs),integrating both power grids and communication networks. To model the communication network associated with a power transmission grid, we use a mesh network that considers the features of power transmission grids such as high-voltage levels, long-transmission distances, and equal importance of each node. Moreover, bidirectional links including data uploading channels and command downloading channels are assumed to connect every node in the communication network and a corresponding physical node in the transmission grid. Based on this model,the fragility of an ECPS is analyzed under various cyber attacks including denial-of-service(Do S) attacks, replay attacks, and false data injection attacks. Control strategies such as load shedding and relay protection are also verified using this model against these attacks.展开更多
基金Supported by Major State Basic Research Program of China ("973" Program,No. 2009CB219700 and No. 2010CB23460)Tianjin Municipal Science and Technology Development Program (No. 09JCZDJC25000)Specialized Research Fund for the Doctoral Program of Higher Education of China (No.20090032110064)
文摘In the traditional power transmission network planning,deterministic analysis methods are widely used.In such methods,all contingencies are deemed to have the same occurrence probability,which is not reasonable.In this paper,risk assessment is introduced to the process of transmission network planning considering the probabilistic characteristics of contingencies.Risk indices are given to determine the weak points of the transmission network based on local information,such as bus risk,line overload risk,contingency severity.The indices are calculated by the optimal cost control method based on risk theory,which can help planners to quickly determine weak points in the planning and find solution to them.For simplification,only line overload violation is considered.Finally,the proposed method is validated by an IEEE-RTS test system and a real power system in China from two aspects.In the first case,the original system is evaluated by the proposed method to find the weak points,and then four planning schemes are established,among which the best scheme is selected.In the second case,four initial planning schemes are established by combining the experiences of planners,and after the evaluation by using the proposed method,the best planning scheme is improved based on the information of weak points in the initial schemes,and the risk of improved scheme is reduced from 42 531.86 MW·h per year to 4 431.26 MW·h per year.
文摘The installed capacity of a large scale wind power plant will be up to a number of hundreds MW, and the wind power is transmitted to load centers through long distance transmission lines with 220 kV, 500 kV, or 750 kV. Therefore, it is necessary not only considering the power transmission line between a wind power plant and the first connection node of the power network, but also the power network among the group of those wind power plants in a wind power base, the integration network from the base to the existed grids, as well as the distribution and consumption of the wind power generation by loads. Meanwhile, the impact of wind power stochastic fluctuation on power systems must be studied. In recent years, wind power prediction technology has been studied by the utilities and wind power plants. As a matter of fact, some European countries have used this prediction technology as a tool in national power dispatch centers and wind power companies.
基金supported by National Science and Technology Major Project"Study on Mobile Satellite Baseband Chip"under Grant No.2013ZX03006004supported by National High Technology Research and Development Program (863 Program) "Research on the Key Technology for the Baseband Signal Processing for Onboard Payload"under Grant No.2012AA01A502+2 种基金the Tsinghua University Initiative Scientific Research Program"Key Technologies of Sky-Earth Integration Wireless Communication Network"under Grant No.2010THZ03supported by National High Technology Research and Development Program (863 Program) "Study and Verification of Satellite Mobile Communication System Wireless Transmission and Networking Technologies"under Grant No.2012AA01A506the Jiangsu Province’s Natural Science Foundation Program"Satellite Mobile Communication System Application Foundations"under Grant No.BK2011019
文摘As a complementary to terrestrial mobile communication systems, mobile satellite communication system can fill the gaps that cannot be covered by terrestrial network, and provides an irreplaceable solution for emergency communication in disaster. To pave the road for future satellite/terrestrial integrated communication networks, ITU-R invited proposals for candidate Radio Interface Technology(RIT) for the satellite component of International Mobile Telecommunications(IMT)-Advanced. China proposed the RIT of Long Term Evolution(LTE)-satellite as a candidate to be considered as IMT-Advanced satellite technology. The submitted LTE-satellite candidate RIT is specified based on terrestrial LTEAdvanced FDD standards that are developed in 3GPP. Considering satellite requirements, a number of modifications to LTE-Advanced are made to adapt to satellite radio transmission environments. This paper provides a general introduction of the new characteristics of LTEsatellite.
基金Supported by Anhui Natural Science Foundation, China(No.1308085MF87, 128085MF89)Open Fund of State Key Laboratory for Novel Software Technology,Nanjing University,China (No.KFKT2011B18)Hefei University of Technology Ph.D. Foundation (No.2010HGBZ-0552)
文摘The network coding is a new technology in the field of information in 21st century. It could enhance the network throughput and save the energy consumption, and is mainly based on the single transmission rate. However, with the development of wireless network and equipment, wireless local network MAC protocols have already supported the multi-rate transmission. This paper investigates the optimal relay selection problem based on network coding. Firstly, the problem is formulated as an optimization problem. Moreover, a relay algorithm based on network coding is proposed and the transmission time gain of our algorithm over the traditional relay algorithm is analyzed. Lastly, we compare total transmission time and the energy consumption of our proposed algorithm, Network Coding with Relay Assistance (NCRA), Transmission Request (TR), and the Direct Transmission (DT) without relay algorithm by adopting IEEE 802.11b. The simulation results demonstrate that our algorithm that improves the coding opportunity by the cooperation of the relay nodes leads to the transmission time decrease of up to 17% over the traditional relay algorithms.
文摘This paper describes the study analysis performed to evaluate the available and potential solutions to control the highly increasing short circuit (SC) levels in Kuwait power system. The real Kuwait High Voltage (HV) network was simulated to examine different measures at both 275 kV and 132 kV stations. The simulation results show that the short circuit currents exceed the permissible levels (40 kA in the 132 kV network and 63 kA in the 275 kV network) in some specific points. The examined measures include the a study on changing the neutral point policy, changing some lines from alternating current (AC) to direct current (DC), dividing specific bus bars in some generating stations and applying current limiters. The paper also presents a new plan for the transmission network in order to manage the expected increase in short circuit levels in the future.
文摘The electrical transmission networks are complex systems that are commonly run near their operational limits. Such systems can undergo major disturbances that have serious consequences. Individually, these disturbances can be attributed to specific causes, such as lightning strikes, ice storms, equipment failure, shorts resulting from untrimmed trees, excessive customer demand, or human errors. In the paper, the human errors from electrical transmission networks of Romanian Power Grid Company over period of 10 years are analyzed. It is hoped that obtained results will provide engineers a better understanding so they can cater to the needs of the human operators when to implement new interfaces for network monitoring tasks, not for the other technical objectives.
基金Project supported by the National Basic Research Program(863)of China(No.2015AA05002)the National Natural Science Foundation of China(No.61471328)the Science and Technology Project of State Grid,China(No.XXB17201400056)
文摘This paper establishes a new framework for modeling electrical cyber-physical systems(ECPSs),integrating both power grids and communication networks. To model the communication network associated with a power transmission grid, we use a mesh network that considers the features of power transmission grids such as high-voltage levels, long-transmission distances, and equal importance of each node. Moreover, bidirectional links including data uploading channels and command downloading channels are assumed to connect every node in the communication network and a corresponding physical node in the transmission grid. Based on this model,the fragility of an ECPS is analyzed under various cyber attacks including denial-of-service(Do S) attacks, replay attacks, and false data injection attacks. Control strategies such as load shedding and relay protection are also verified using this model against these attacks.