Unified Power Quality Controller(UPQC) was proposed to comprehensively improve power quality of coal mine power network and its basic structure and operation principle was introduced. In order to overcome time lag o...Unified Power Quality Controller(UPQC) was proposed to comprehensively improve power quality of coal mine power network and its basic structure and operation principle was introduced. In order to overcome time lag of Active Power Filter(APF) in compensating harmonic and reactive current, a novel method based on gray system theory was proposed to predict harmonic current and other distortion component. The mathematical model of component to be compensated was constructed by data sequence of distortion component, which could exactly forecast compensation signal of next period. The optimal control strategy was selected according to the principle of output signal approaching component to be compensated as near as possible. Before predicating each time the oldest data was eliminated while the latest data was added to data sequence. Then new predication model was established once again. The results show that the method can always construct mathematical model with variation of system parameters, reflect the latest state of system and not increase calculation quantity. The feasible and effective control strategy can improve power quality of coal mine power network.展开更多
The quality of supply in Spain is regulated by Act 54/1997 as the basic standard and further developed by Royal Decree 1955/2000, among others. Also this law (1997) introduces the division between generators, distri...The quality of supply in Spain is regulated by Act 54/1997 as the basic standard and further developed by Royal Decree 1955/2000, among others. Also this law (1997) introduces the division between generators, distribution companies and retailers. The aim of this paper is to provide an overview of the fundamental parameters to be taken into account when examining the status of national regulations in Spain on the quality of electricity supply, in addition to describing the various agents intervening in these. There are two more aspects to consider: the guarantee of supply and energy is provided at the lowest cost to consumers. The authors propose to include phase-shifting transformers at specific strategic points, in accordance with power flow control principles in parallel circuits. Finally, it can be concluded that Royal Decree 222/2008 needs reviewing and applying effectively, as do modifications to Royal Decree 1995/2000 providing remuneration that effectively induces electricity companies to invest in their networks, and ends with "a well-paid electricity company is obliged to invest in network improvements".展开更多
文摘Unified Power Quality Controller(UPQC) was proposed to comprehensively improve power quality of coal mine power network and its basic structure and operation principle was introduced. In order to overcome time lag of Active Power Filter(APF) in compensating harmonic and reactive current, a novel method based on gray system theory was proposed to predict harmonic current and other distortion component. The mathematical model of component to be compensated was constructed by data sequence of distortion component, which could exactly forecast compensation signal of next period. The optimal control strategy was selected according to the principle of output signal approaching component to be compensated as near as possible. Before predicating each time the oldest data was eliminated while the latest data was added to data sequence. Then new predication model was established once again. The results show that the method can always construct mathematical model with variation of system parameters, reflect the latest state of system and not increase calculation quantity. The feasible and effective control strategy can improve power quality of coal mine power network.
文摘The quality of supply in Spain is regulated by Act 54/1997 as the basic standard and further developed by Royal Decree 1955/2000, among others. Also this law (1997) introduces the division between generators, distribution companies and retailers. The aim of this paper is to provide an overview of the fundamental parameters to be taken into account when examining the status of national regulations in Spain on the quality of electricity supply, in addition to describing the various agents intervening in these. There are two more aspects to consider: the guarantee of supply and energy is provided at the lowest cost to consumers. The authors propose to include phase-shifting transformers at specific strategic points, in accordance with power flow control principles in parallel circuits. Finally, it can be concluded that Royal Decree 222/2008 needs reviewing and applying effectively, as do modifications to Royal Decree 1995/2000 providing remuneration that effectively induces electricity companies to invest in their networks, and ends with "a well-paid electricity company is obliged to invest in network improvements".