Based on the percolation network model characterizing reservoir rock's pore structure and fluid characteristics, this paper qualitatively studies the effects of pore size, pore shape, pore connectivity, and the amoun...Based on the percolation network model characterizing reservoir rock's pore structure and fluid characteristics, this paper qualitatively studies the effects of pore size, pore shape, pore connectivity, and the amount of micropores on the I - Sw curve using numerical modeling. The effects of formation water salinity on the electrical resistivity of the rock are discussed. Then the relative magnitudes of the different influencing factors are discussed. The effects of the different factors on the I - Sw curve are analyzed by fitting simulation results. The results show that the connectivity of the void spaces and the amount of micropores have a large effect on the I - S, curve, while the other factors have little effect. The formation water salinity has a large effect on the absolute resistivity values. The non-Archie phenomenon is prevalent, which is remarkable in rocks with low permeability.展开更多
Along with the economic development,large tunnels need to be constructed in many high mountains or complex structure regions,and the design and construction of detailed tunnel exploration become particularly important...Along with the economic development,large tunnels need to be constructed in many high mountains or complex structure regions,and the design and construction of detailed tunnel exploration become particularly important.Transient electromagnetic method( TEM) uses a non-grounded loop or an electrode to send a primary electromagnetic pulse into the ground,and observes spatial and temporal distribution of secondary electromagnetic field,which is widely applied in mineral resource exploration,engineering geology,etc.The application of TEM in the tunnel construction of Kaiyuan Temple is researched in this study.The smoke loop inversion is adopted for inverting the transient electromagnetic data.The drilling data and high density resistivity method data are combined for comparison.The obtained inversion result greatly coincides with the actual conditions.Therefore,the geophysical prospecting basis can be provided for the division of stratum,delineation of geological structure,and design and construction of tunnel pavement.By virtue of TEM,drilling data and high density resistivity method,the tunnel construction of Kaiyuan Temple has obtained satisfactory results.展开更多
基金This project is sponsored by National Natural Science Foundation of China, No. 40574030.
文摘Based on the percolation network model characterizing reservoir rock's pore structure and fluid characteristics, this paper qualitatively studies the effects of pore size, pore shape, pore connectivity, and the amount of micropores on the I - Sw curve using numerical modeling. The effects of formation water salinity on the electrical resistivity of the rock are discussed. Then the relative magnitudes of the different influencing factors are discussed. The effects of the different factors on the I - Sw curve are analyzed by fitting simulation results. The results show that the connectivity of the void spaces and the amount of micropores have a large effect on the I - S, curve, while the other factors have little effect. The formation water salinity has a large effect on the absolute resistivity values. The non-Archie phenomenon is prevalent, which is remarkable in rocks with low permeability.
文摘Along with the economic development,large tunnels need to be constructed in many high mountains or complex structure regions,and the design and construction of detailed tunnel exploration become particularly important.Transient electromagnetic method( TEM) uses a non-grounded loop or an electrode to send a primary electromagnetic pulse into the ground,and observes spatial and temporal distribution of secondary electromagnetic field,which is widely applied in mineral resource exploration,engineering geology,etc.The application of TEM in the tunnel construction of Kaiyuan Temple is researched in this study.The smoke loop inversion is adopted for inverting the transient electromagnetic data.The drilling data and high density resistivity method data are combined for comparison.The obtained inversion result greatly coincides with the actual conditions.Therefore,the geophysical prospecting basis can be provided for the division of stratum,delineation of geological structure,and design and construction of tunnel pavement.By virtue of TEM,drilling data and high density resistivity method,the tunnel construction of Kaiyuan Temple has obtained satisfactory results.