期刊文献+
共找到10篇文章
< 1 >
每页显示 20 50 100
高瓦斯矿井采空区自燃“三带”分布及防治研究
1
作者 文建东 苗在全 +2 位作者 于盟瑶 权继业 张鸿伟 《能源技术与管理》 2024年第4期123-126,148,共5页
为了防治魏家地煤矿开采采空区漏风导致的遗煤易自燃现象,以魏家地煤矿西2019工作面为研究背景,采用数值模拟与理论分析相结合的研究手段提出了一项有效的采空区煤自燃防治技术,有针对性地在该工作面上隅角设置留空巷、下隅角设置封堵墙... 为了防治魏家地煤矿开采采空区漏风导致的遗煤易自燃现象,以魏家地煤矿西2019工作面为研究背景,采用数值模拟与理论分析相结合的研究手段提出了一项有效的采空区煤自燃防治技术,有针对性地在该工作面上隅角设置留空巷、下隅角设置封堵墙,并且通过COMSOL Multiphysics数值模拟软件模拟和对比上隅角留空巷、下隅角设置封堵墙影响下采空区自燃“三带”的分布范围和原始采空区自燃“三带”的分布范围。结果表明:在采空区上隅角设置留空巷、下隅角设置封堵墙可以减小采空区自燃“三带”的影响范围,能够有效地预防采空区煤自燃。 展开更多
关键词 留空巷 封堵墙 采空区 自燃“三带” 数值模拟
下载PDF
Ground response and failure mechanism of gob-side entry by roof cutting with hard main roof
2
作者 ZHU Heng-zhong XU Lei WEN Zhi-jie 《Journal of Central South University》 SCIE EI CAS CSCD 2024年第7期2488-2512,共25页
This study is the result of long-term efforts of the authors’team to assess ground response of gob-side entry by roof cutting(GSERC)with hard main roof,aiming at scientific control for GSERC deformation.A comprehensi... This study is the result of long-term efforts of the authors’team to assess ground response of gob-side entry by roof cutting(GSERC)with hard main roof,aiming at scientific control for GSERC deformation.A comprehensive field measurement program was conducted to determine entry deformation,roof fracture zone,and anchor bolt(cable)loading.The results indicate that GSERC deformation presents asymmetric characteristics.The maximum convergence near roof cutting side is 458 mm during the primary use process and 1120 mm during the secondary reuse process.The entry deformation is closely associated with the primary development stage,primary use stage,and secondary reuse stage.The key block movement of roof cutting structure,a complex stress environment,and a mismatch in the supporting design scheme are the failure mechanism of GSERC.A controlling ideology for mining states,including regional and stage divisions,was proposed.Both dynamic and permanent support schemes have been implemented in the field.Engineering practice results indicate that the new support scheme can efficiently ensure long-term entry safety and could be a reliable approach for other engineering practices. 展开更多
关键词 gob-side entry by roof cutting ground response failure mechanism following mining states control hard main roof
下载PDF
Superposed disturbance mechanism of sequential overlying strata collapse for gob-side entry retaining and corresponding control strategies 被引量:13
3
作者 HAN Chang-liang ZHANG Nong +2 位作者 RAN Zhi GAO Rui YANG Hou-qiang 《Journal of Central South University》 SCIE EI CAS CSCD 2018年第9期2258-2271,共14页
Gob-area roof rupture movement is a key disturbance factor for gob-side entry retaining.The characteristics of gob-area sequential roof collapse of overlying strata and superposed disturbance mechanism for gob-side en... Gob-area roof rupture movement is a key disturbance factor for gob-side entry retaining.The characteristics of gob-area sequential roof collapse of overlying strata and superposed disturbance mechanism for gob-side entry retaining are obtained via physical simulation and theoretical analysis,in which the scope of disturbed strata is enlarged from main roof to fracture zone.The experiment reveals that as a working face advances,roof strata sequentially collapse from bottom to top and produce multiple disturbances to gob-side entry retaining.Key strata among the overlying strata control each collapse.Main roof subsidence is divided into three stages:flexure subsidence prior to rupture,rotational subsidence during rupture and compressive subsidence after rupture.The amounts of deformation evident in each of the three stages are 15%,55%and 30%,respectively.After the master stratum collapses,main roof subsidence approaches its maximum value.The final span of the key stratum determines the moment and cycling of gob-side entry retaining disturbances.Main roof subsidence influences the load on the filling wall.The sequential roof collapse of overlying strata results in fluctuations in the gob-side entry retaining deformation.Calculation formulae for the final span of the key stratum and the filling wall load are obtained via theoretical analysis.A control method for the stability of the gob-side entry retaining’s surrounding rock is proposed,which includes 3 measures:a“dual-layer”proactive anchorage support,roadside filling with dynamic strength matching and auxiliary support during disturbance.Finally,the gob-side entry retaining of the Xiaoqing mine E1403 working face is presented as an engineering case capable of verifying the validity of the research conclusions. 展开更多
关键词 sequential roof collapse gob-side entry retaining superposed disturbance key stratum stability control
下载PDF
Research and application of mechanical models for the whole process of 110 mining method roof structural movement 被引量:7
4
作者 BIAN Wen-hui YANG Jun +2 位作者 HE Man-chao ZHU Chun XU Dong-ming 《Journal of Central South University》 SCIE EI CAS CSCD 2022年第9期3106-3124,共19页
For the 110 mining method,it is challenging to accurately calculate the support resistance of the roadway due to the lack of understanding of the dynamic movement of the overlying strata in this method.The consequenti... For the 110 mining method,it is challenging to accurately calculate the support resistance of the roadway due to the lack of understanding of the dynamic movement of the overlying strata in this method.The consequential excessive support results in a significant increase in the cost of roadway support.The authors explored the overlying strata movement and roadway deformation of the gob-entry retaining in the 110 mining method to solve this problem.First,the typical stages of the roof-cutting gob-side entry were defined.Second,the mechanical model and calculation formula of the support resistance on the roof were explored.Then,using numerical simulation software,the starting ranges of the specific supports at different stages were verified and the feasibility of the support scheme was examined.Finally,combined with the field measurement data,the stress and the deformation of the gob roadway at different stages under the influence of two mining processes in the 110 mining method were obtained.The numerical simulation results obtained are consistent with the field test results,providing a theoretical basis for precision support at different stages by the 110 mining method. 展开更多
关键词 110 mining method gob-side entry retaining roof structure movement mechanical model
下载PDF
Position-optimization on retained entry and backfilling wall in gob-side entry retaining techniques 被引量:7
5
作者 Xiaowei Feng Nong Zhang 《International Journal of Coal Science & Technology》 EI 2015年第3期186-195,共10页
This study investigates the stability problem of gob-side entry retaining (GER) and backfilling wall which located under the key block B. Based on the combined research of elastic-plastic mechanics, structure mechan... This study investigates the stability problem of gob-side entry retaining (GER) and backfilling wall which located under the key block B. Based on the combined research of elastic-plastic mechanics, structure mechanics and modern theory of mining-induced pressure, the caving characteristic and roof structure over the GER were analyzed, and the vertical force and the torque on retained entry roof were also derived as the position for the retained entry varies. On the basis of the specific geology in Huainan mining area, the results indicate that a relatively more stable position for retained entry neighbors the hinge point of block A and B, and it also located at a scope ranging from this point to the one-third length of block B in horizontal direction. As to appropriate position for backfilling wall, this study recommends partial- road-in backfilling method for GER. Field trial conducted at panel face 12418 of Xieqiao Mine demonstrates that the recommended width for original entry is 3.6 m and the preferred width proportion between original retained entry and original entry is 75 % or so whereas the avoidable one is 88 % or so. These findings provide qualitative references to the mines which share similar geology as what Huainan mining area characterized. 展开更多
关键词 Mining engineering Position-optimization Gob-side entry retaining Partial-road-in backfilling
下载PDF
Study of dynamic pressure roadway supporting scheme under condi- tion of thick composite roof 被引量:3
6
作者 Wei-Jun WANG Li-Qiang LUO Wei-Jian YU Hai WU Yan-Si QU 《Journal of Coal Science & Engineering(China)》 2013年第2期119-125,共7页
This paper analyzed the strata behaviors of solid-coal roadway, gob-side entry driving and deformation law of surrounding rock in depth under high stress and thick composite roof based on the dynamic pressure roadway ... This paper analyzed the strata behaviors of solid-coal roadway, gob-side entry driving and deformation law of surrounding rock in depth under high stress and thick composite roof based on the dynamic pressure roadway as engineering background in Fengcheng mining area, Jiangxi province. The results, both field measurement and numerical simulation show that gob-side entry driving results the deformation of coal roadway main wall, however, entity-coal roadway driving results deformation of main roof and floor. The maintenance state of gob-side entry driving is better than entity-coal roadway, this situation is relevant to thick composite roof layered and easy collapse characteristics. At the same time, this paper put fox'ward and proved proper dynamic pressure roadway supporting scheme under the surrounding rock condition and stress environment. 展开更多
关键词 thick composite roof dynamic pressurized roadway high stress surrounding rock control
下载PDF
Top-coal deformation control of gob-side entry with narrow pillars and its application for fully mechanized mining face 被引量:3
7
作者 Qi Fangkun Zhou Yuejin +3 位作者 Li Jiawei Wang Erqian Cao Zhengzheng Li Ning 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第3期417-422,共6页
A mechanical model to control the top-coal deformation is established in accordance with the structural characters of the gob-side entry surrounding rock for the fully-mechanic top-coal caving; the analytical solution... A mechanical model to control the top-coal deformation is established in accordance with the structural characters of the gob-side entry surrounding rock for the fully-mechanic top-coal caving; the analytical solution of top coal roof-sag curve is deduced with Winkler elastic foundation beam model. By means of a calculating and analytic program, the top coal roof-sag values are calculated under the conditions of different supporting intensities, widths of narrow pillars and stiffness of top coal; meanwhile, the relationship between the roof-sag values and supporting intensity, width of narrow pillars and stiffness of top coal is analyzed as well. With the actual situation of the gob-side entry taken into consideration, the parameters of top-coal control are determined and a supporting plan is proposed for the top-coal control,which is proved to be reliable and effective by on-site verification. Some theoretical guidance and advice are put forward for the top-coal deformation control in gob-side entry for fully mechanized top-coal caving face. 展开更多
关键词 Fully mechanized top-coal caving Narrow pillar Gob-side entry Top coal Deformation control
下载PDF
Control of floor heaves with steel pile in gob-side entry retaining 被引量:2
8
作者 Xu Ying Chen Jin Bai Jianbiao 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第3期527-534,共8页
A new approach named as steel pile method is innovatively proposed in this study to control severe floor heaves in gob-side entry retaining. It is required that the steel piles be installed in the floor corners with a... A new approach named as steel pile method is innovatively proposed in this study to control severe floor heaves in gob-side entry retaining. It is required that the steel piles be installed in the floor corners with a certain interval before the influence of the dynamic pressure induced by current panel extraction. Using numerical simulation and theoretical analysis, this study investigated the interaction between the steel piles and the floor rocks during the service life of the steel piles, and revealed the mechanism of the steel piles in controlling floor heaves. The effect of the steel pile parameters on the control of floor heaves was presented and elaborated. It is found that the effectiveness of the steel piles in controlling floor heaves can be enhanced with greater installed dip angle, longer length and smaller interval of the steel piles.Compared with traditional methods, e.g., using floor anchor bolts and floor restoration, the advantages using steel pile were successfully defined in terms of controlling effect and economic benefits. It is hoped that the proposed method can contribute to the development of gob-side entry retaining technique. 展开更多
关键词 Gob-side entry retaining Floor heave Steel pile Stress arch Control mechanism
下载PDF
NEW TECHNOLOGY OF ROADSIDE ENTRY SUPPORT IN ADVANCING-MINING BY PUMPING HIGHWATER-CONTENT FAST SETTING-SOLIDIFYING MATERIALS
9
作者 黄玉诚 孙恒虎 《Journal of China University of Mining and Technology》 1995年第2期53-59,共7页
Roadside entry supporting technology by pumping high water-content fast setting-solidifying materials in advancing-mining was industrially tested in Yangzhuang Coal Mine, Huaibei Coal Mining Administration. Roadside p... Roadside entry supporting technology by pumping high water-content fast setting-solidifying materials in advancing-mining was industrially tested in Yangzhuang Coal Mine, Huaibei Coal Mining Administration. Roadside packing parameters were determined according to the properties of high water-content fast setting-solidifying materials, as well as geological and mining conditions. A new roadside packing technological system was designed to use pumping-delivery method to transport the materials. With respect to the special conditions in the advancing mining system, effective temporary support systems were designed and tried. The technical and economic benefits from this new industrial experiment were carefully analyzed and evaluated. 展开更多
关键词 high water-content fast setting-solidifying material roadside entry
下载PDF
Analysis on distribution law of the abutment pressure of the integrated coal beside the road-in packing for gob-side entry retaining in fully-mechanized caving face
10
作者 Zhu Chuanqu Liu Ze +1 位作者 Wang Weijun Zhang Daobing 《Engineering Sciences》 EI 2009年第3期23-27,共5页
The three-dimensional damage constitutive relationship of coal is established and distribution law of the abutment pressure of the integrated coal beside the road-in packing for gob-side entry retaining in fully-mecha... The three-dimensional damage constitutive relationship of coal is established and distribution law of the abutment pressure of the integrated coal beside the road-in packing for gob-side entry retaining in fully-mechanized caving face under the effect of given deformation of the main roof is analyzed by the damage mechanics theory. And the relationship between distribution of the abutment pressure and thickness of coal seam is explored. The presented result is of great theoretical significance and practical value to the study on stability control of the surrounding rock of road-in packing for gob-side entry retaining in fully-mechanized caving face. 展开更多
关键词 road-in packing for gob-side entry retaining in fully-mechanized caving face integrated coal beside the roadway abutment pressure damage mechanics
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部